TT-eWIS/2018 Introduction

Slides:



Advertisements
Similar presentations
Online System for Compiling Member Comments July 2010 Near East Regional Workshop.
Advertisements

World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
External Examining - Overview of QAA’s work Dr Tim Burton Assistant Director, Development and Enhancement Group 5 March 2010.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Main outcomes of 21 th ERG Plenary Roberto Viola, ERG Chair Brussels, 15 June 2007.
Fire Safety in European Hotels Dr SD Christian. Fire Safety in European Hotels Council Recommendation 86/666/EEC Fire Safety in European Hotels.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
COLLABORATIVE IV – Lead Economy: China Adoption of Renewable Energy Standards Project overseer Song Yanqin November 4, 2002 Seoul.
1 Item 2.1.b of the agenda IT Governance in the ESS and related issues Renewal of mandates STNE Adam WROŃSKI Eurostat, Unit B5.
1Presentation of CASCO SMA 5 June International Organization for Standardization.
WIGOS regulatory and guidance material
Regional Basic Observing Network Co-chair, CBS/OPAG-IOS
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Session II: System authority for ERTMS 4RP Trackside approval
Agenda 5.11 General Regulations
PREPARATION OF DOCUMENTATION FOR CONSTITUENT BODIES MEETINGS
EC-68 DOC 16.3 GOVERNANCE REVIEW
Strategy on Service Delivery
Establishment of ‘Technical Sub Committee’ Action - SDG Option
Roadmap to Enhanced Technical Regulations of WMO
Agenda item 2.3 Report of OPAG ISS Matteo dell’Acqua
Project Roles and Responsibilities
WMO IT Security Incident Process
Documentation Overview
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
Authority decision on CAP086 –Implementation Dates
Dr Sue Barrell, Australia
APPA – Term 3 Breakfast Session
WMO Global Multi-Hazard Alert System
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Overview of WMO Strategic Planning Initiative
Online System for Compiling Member Comments
Approving Amendments to the Technical Regulations
CBP Biennial Strategy Review System
CARDS TWINNING IN CROATIA
Approving Amendments to the Technical Regulations
Operations sustainability
Memorandum of Understanding
William J Wright ,co-chair TT-IP
State of play endocrine disruptors
19th meeting of the WG GES 22/03/2018
Constituent Bodies Reform (CBR)
Exit Capacity Substitution and Revision
Aeronautical Meteorological Personnel (AMP) Standards Ian Lisk, Met Office WMO Manager Chair WMO CAeM ET/ET Chair WMO EC Panel TT-AFQ CAeM-XIV TECO, Hong.
Informal document GRVA st GRVA, September 2018
TT-eWIS/2018: Technology and Architecture (#5)
Item 5(2)/1 - WIS 2.0 implementation plan
Evolution of WIS: Implications from EC-70
WIGOS regulatory and guidance material
TT-eWIS/2018 Implementation plan
Introduction to CBS-16
Commission for Basic Systems (CBS) Technical Conference 2018
Cg-18 Special Sessions Topic 4; Infrastructure -
Topic 5: Public-private engagement
Topic 2 – Reform Documents 4(4) and 4(5)(Cg-18)
Approving Amendments to the Technical Regulations
Commission for Basic Systems, Technical Conference
SIG RFC 2019 Relevant Summary
CONSTITUENT BODY REFORM (CBR)
TT-eWIS/2018: Decentralisation vs. shared services
Item Seamless GDPFS Implementation Plan
TT-eWIS/2018 Future technology workshop
Presentation transcript:

TT-eWIS/2018 Introduction Jeremy Tandy (Chair)

Constituent Body Resolutions and Decisions Decision 18 (EC-70) requests CBS: To consult with Members [...] on WIS 2.0 implementation; To provide Congress with the updated Strategy and Implementation Approach and a plan to document specific design requirements; To provide more information to Members about the technical infrastructure supporting WIS 2.0 and a comparison of the functional architectures for the original WIS and WIS 2.0; Resolution 23 (EC-70) requests CBS, in collaboration with the private sector, to assess how new technology can be applied to the provision of reliable data sharing for all users of WIS 2.0 and report back. [my paraphrasing] Decision 18 (EC-70) asks that Congress delegate to EC the final approvals on WIS 2.0 implementation once the detailed design requirements and technical specifications have been provided by CBS. (further discussion: agenda #2)

CBS Future Technology workshop Decision 18 (Requests #2) states that we do not need to provide detailed technical solutions at this time, only a plan for how these will be developed – best developed in collaboration with industry. Resolution 23 requires collaboration with the private sector. To begin this, the Secretariat have budgeted for a "Future Technologies" workshop in April 2019 convening experts from the public, private and academic sectors to assess the most appropriate technology choices to meet the data sharing requirements of WIS 2.0. The Future Technologies workshop will provide a statement to Congress to meet the "report back" clause of Resolution 23. (further discussion: agenda #8)

Timeline for WIS 2.0 Implementation Plan approvals June 2019 Cg-18 [WIS 2.0 Strategy] [Amended Implementation Plan] [Functional Architecture & mapping] [Future Tech workshop statement] [Tech Specification dev plan] April 2018 CBS TECO/2018 Issue 5(2)/1 [implementation approach] [presentation] November 2018 TT-eWIS/2018 ??? 2019 [Feedback from Member consultation] November 2017 TT-eWIS/2017 [report] June 2018 EC-70 [report] Resolution 23 Decision 18 (agenda #2) December 2018 Member consultation [Implementation Plan] [Functional Mapping] (agenda #3 - #7) April 2018 Future Technology workshop [Statement to Cg-18] (agenda #8) ??? EC-?? WIS 2.0 approval [WIS 2.0 Tech Specifications]

Objectives for TT-eWIS/2018 Update the draft WIS 2.0 Implementation Approach proposed at CBS-TECO/2018: CBS-TECO-2018-Inf-5(1) Update the WIS Functional Architecture with respect to WIS 2.0, and provide a mapping between the functional architecture of WIS 2.0 and the current WIS implementation Plan the Future Technologies workshop Outputs of (A) and (B) will be distributed to Members for consultation, with their feedback incorporated into a document to be provided to Cg- 18. A statement from the Future Technologies workshop will also be provided to Cg-18.