Aerodrome Certification Workshop

Slides:



Advertisements
Similar presentations
Flight Operations View
Advertisements

ADO 1 Office of Airports Airport Geometrics Airports Division, Western Pacific Region.
PRESENTATION ETOD AIRSEAIR
Flight Instructor Seminars August 2007
Normal Procedures Cirrus SR-22 Transition Training 8/16/04.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 Aerodrome Operations under Limited Visibility Conditions.
Air Transport Reporting Form K for ANSPs ICAO Aviation Data Analyses Seminar Middle East (MID) Regional Office October Economic Analysis and Policy.
Airport Lighting Brett Malloy
ILS Instrument Landing System
Leading Cadet Training
Aviation Management College Airport Management Ms.Zuliana Ismail
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
Lecture 4: Take-off Performance Speeds
Take-off and the circuit. Take-off  Take-off is the phase of flight in which an aircraft goes through a transition from moving along the ground (taxiing)
Flygteknik 2010 Oct 19 MIDCAS – Sense and Avoid for UAS Bengt-Göran Sundqvist, Saab AB.
Lecture 8: INSTRUMENT LANDING SYSTEM (ILS)
ANNEX 14: AERODROMES Part II
Overview of TP312 5th (draft) Structure Definitions
Lights.
ICAO NAM/CAR/SAM Runway Safety/Incursion Conference
Physical Characteristics
GSM On-Board Aircraft John Mettrop Directorate of Airspace Policy
Aerodrome Operations under Limited Visibility Conditions
Workshop on preparations for ANConf/12 − ASBU methodology
Draft Environmental Assessment Report for Bradley International Airport October 2016
A380 presentation L. EVAIN AIRBUS.
Chapter 5 Visual Aids for Navigation
AIR TRAFFIC ONTROL.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
U.S. AIRSPACE.
2017 Safety Forum Runway Incursion scenarios
CURVES IN ENGINEERING.
OPERATIONS ON PARALLEL OR NEAR-PARALLEL RUNWAYS
Part- I {Conic Sections}
PO 401 General Criteria EO Missed Approaches
PO 402 Take Off and Landing Minima EO Altitudes
Continuous Climb Operations (CCO) Saulo Da Silva
Followup: What Can We Do?
1.05 Airspace References: FTGU pages TC AIM
AERODROME OBSTACLE SURFACES
Workshop on preparations for ANConf/12 − ASBU methodology
Obstacle Surfaces Identification
AIR TRAFFIC CONTROL SERVICE
UNIT -4 AERODROME DATA.
Engineering Curves.
Air Transport Reporting Form K for ANSPs
Participant Suriname: SHARITA RADJIE, AIS OFFICER
UNIT -4 AERODROME DATA.
BUILDING HEIGHT PARAMETERS
Chapter 6. Visual Aids for Denoting Obstacles
Chapter 5 Visual Aids for Navigation
Welcome to the IMC Club Meeting
Continuous Climb Operations (CCO) Saulo Da Silva
Aerodrome Certification Exercise The Process
Warm-Up – 11/10 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What region does the majority of aircraft flying.
RUNWAY OBSTRUCTIONS.
Magesh Mani BSACIST.
Volume - The Disk Method
AIRPORT LECTURE#05.
RUNWAY OBSTRUCTIONS.
Part- I {Conic Sections}
AIXM 5.2 – CP in Lot 2 AIXM CCB – Brussels, 06 MAR 2019.
Safety Data Collection and Analysis at ICAO
ATC Clearances Chapter 3 Section C.
Obstacles AIXM 5 RC2.
Aerodrome Certification Workshop
Aerodrome Certification Workshop
Aerodrome Certification Workshop
Aerodrome Certification Workshop
Aerodrome Certification Workshop
Presentation transcript:

Aerodrome Certification Workshop Aerodrome Certification : Obstacles Control Eng. Mohamed Iheb Hamdi ICAO MID Regional Officer for Aerodromes and Ground Aids (AGA Aerodrome Certification Workshop Paris, France 18-20 Dec 2018

OLS : Obstacles Limitation Surfaces The take-Off Climb Surface Inner Horizontal Surface Conical Surface Transitional Surface The approach Surface

Obstacles

OLS Inner horizontal Surface and Conical Surface To protect airspace for visual circling prior to landing Approach and Transitional Surfaces Define the volume of airspace which should be kept clear of obstacles to protect the aircraft in the final phase of the Approach-to-Land Manoeuvre Take-Off Climb Surface Provide protection for aircraft taking off with respect to obstacles

OLS: Design (Example Code 4 _ P-APP) Transitional Surface Runway Strip C C Approach Surface H Slope =14.3% D = H / Slope Runway Strip C - C

OLS: Design (Example Code 4 _ P-APP) Inner horizontal Surface Transitional Surface F Inner horizontal Surface Runway Strip F - F

OLS: Design (Example Code 4 _ P-APP) Conical surface T T Inner horizontal Surface Slope= 5% Conical Surface Transitional Surface T - T

OLS: Design (Example Code 4 _ P-APP) Approach Surface Divergence = 15 % 1st section 2nd section Horizontal Section Bande Slope2=2,5% D2 H2 H1 = D1 * slope1 H2 = D2 * Slope2 H3 = H1 + H2 H3 Slope1=2% D1 H1 B - B

OLS: Design (Example Code 4 _ P-APP) Take Off climb surface Divergence=12.5 % Runway Strip H H = D * Slope Slope= 1.6 % A - A D

OFZ: Obstacle Free Zone

OFZ – Obstacle free Zone OFZ composed of: Inner Transitional Surface (ITS) Balked Landing Surface Inner Approach Surface Surfaces intended to protect aeroplanes from fixed or mobile obstacles during category I, II or III operations when approaches are continued below decision height and during any subsequent missed approach or balked landing with all engines operating normally, It is not intended to supplant the requirement of other surfaces or areas where these are more demanding

Outer Horizontal Surface Some States Mandate a further surface : The Outer Horizontal Surface with extends from the periphery of the conical surface to a radius of 15,000m from the aerodrome reference point

Outer Horizontal Surface