Project Information Project Name Process Improvement Project

Slides:



Advertisements
Similar presentations
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Advertisements

EDGE™ Concept Level Project Plan P08452 – Fault Detection and Diagnosis in Rotating Equipment for the Energy Industry Garry Studley (Mechanical Engineering)
Supplier Development Kaizen Implementation Kit
“ Where Quality & Safety Are An Integral Part Of The Total Solution To Your Maintenance & Service Requirements ”
© ABB-EWEC 2006 ATHENS /03/06 EWEC 2006 Athens The Challenges of Offshore Power System Construction Peter Jones Lars Stendius ABB.
P10457: D-R Process Improvement Compressor Assembly Area Patrick Muldoon Introductions and Welcoming Comments.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen 1R10002 Process Improvement.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Process Improvement Project P09457 Eric MacCormack Colin Roy.
Management is Essential
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
International Organization for Standardization AIMS MANAGEMENT CONSULTANTS Vijay Garg ,
RMDG Aerospace Preliminary Results Presentation March 2007.
Industrial Standards Framework and Energy Management Aimee McKane, Lawrence Berkeley National Laboratory.
Components of an Automated Manufacturing System
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Actuation ▪ Valves ▪ Controls ▪ Service ▪ Expertise Custom Actuation Solutions Since 1973 Title 01/01/2012 Automated Valve & Control AVC.
Quality in Manufacturing and Service Systems
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Clean air solutions THE CAMFIL GROUP Clean air solutions Gösta Larson, founder Clean air experts – since 1963… Swedish family owned business.
Overview of APL Logistics. Supply Chain Management Container Shipping Chartering & Enterprise Our Heritage Founded in 1968 Largest shipping company listed.
OUR PASSION: Earthmoving & Mining Machines Plant Maintenance Fabrication Erection.
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Able Corporation. Rudimentary Mission Statement "To become a global giant in the field of lawn equipment and accessories, power tools and microwaves by.
ISAT 211 Mod 2-1  1997 M. Zarrugh ISAT 211 Module 2: Competitiveness and Operations Strategy  The learning objectives of this module are –To explain.
TOSCA Towards sustainable supply chains through a common approach for company strategic work and daily operations.
C L E A N A I R S O L U T I O N S The Camfil Farr Group A presentation.
Business Alert: How to Gain Control of your Budget and Reduce TCO John McArthur Group Vice President IDC.
1 Martin Lyall Terex Oklahoma Event May Factory World-wide Design, Engineering & Production Facility (28,000 m²) For TEREX ADT, RDT Trucks & Motor.
Jose Chavez Jr, Quality & Technical Services Engineer Hugo Razo Process Owner.
OVERVIEW Motivating Graphic’s team is comprised of some of the most accomplished professionals in the printing industry. Their depth of experience managing.
WELCOME TO SAMARTHAN SYSTEMS. SAMARTHAN SYSTEMS Samarthan Systems Pvt. Ltd established in 1997, has consistently been the leading manufacturers and suppliers.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
5S and Visual We consider 5S and Visual Controls to be the foundation of Lean Manufacturing systems. 5S and Visual Controls are workplace organizational.
A Partnership For The New Millennium & You!
RBC Supply Chain Solutions. Who we are ? RBC is a European network of procurement specialists offering consultancy on purchasing strategies, supplier.
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Manufacturing Process Modeling engineer(m/f)
Ordering Process Dep. At Atlas Copco
Hailo US Tower Equipment Manufacturer
12 good reasons to buy an ABB TrafoStar™ transformer
42-a Machine st., 101 Yekaterinburg Russian Fediration Phone:+7(343)
Management is Essential
Management is Essential
Why LESER? Why LESER? Why LESER | LESER GmbH & Co. KG | | Rev. 02.
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Intertek overview.
Manufacturing Process Modeling engineer(m/f)
Solar Gas turbine Engine assemblies
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
Nuclear Power - a reliable partner
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
SENIOR DESIGN PROJECT P08455
SENIOR DESIGN PROJECT P08455
P10457: D-R Process Improvement
SENIOR DESIGN PROJECT P08455
About us With over 18 years experience in manufacturing laboratory and scientific Instruments, Waiometra team has the knowledge and expertise to provide.
Value Engineering in a Manufacturing Facility
Final Project Plan P09004 – Eye Movement Tracking Device
The E-Myth Perspective: Building a Business that Works for You
Massachusetts Massachusetts chemistry…
Kentucky Kentucky chemistry… Global Challenges, Chemistry Solutions
Virginia Virginia chemistry… Global Challenges, Chemistry Solutions
Texas Texas chemistry… Global Challenges, Chemistry Solutions largest
Presentation transcript:

Project Information Project Name Process Improvement Project Project Number P09457 Project Family Sustainable Technology for the Global Market Track Process Improvement Innovations Faculty Guide Professor John Kaemmerlen Primary Customer Dresser-Rand with the point of contact being Dennis Rice at the Olean facility Team Members Eric MacCormack Colin Roy Jimmy Ichihana Cody Rath Duke Bonaventura

Customer Overview “For more than 100 years, Dresser-Rand has been among the largest global suppliers of rotating equipment solutions, with field-proven centrifugal and reciprocating compressors, steam turbines, expanders, gas turbine packages, and control systems.” Produce equipment worldwide for companies within the oil and gas, chemical, petrochemical, process industries. Olean facility is 2 hours Southwest of Rochester.

Customer Needs The goal of the project is to reduce cycle time of the Piping and Packaging line. Products can be assembled in 16 days but are taking 2-3 months Currently, there is a 2 year backlog of orders for Dresser-Rand’s products. Maintain a high level of safety for the employees. Free up some floor space within the plant.

Approach to solutions Implement lean production techniques into the piping and packaging line in order to reduce the cycle time of final assembly. P-D-C-A: Establish a baseline, implement solutions, verify/analyze results. Simulation/modeling Factory CAD Part Family Assessment/Custom Tooling/ Accuracy of Drawings