BESII Vertex Chamber and MDCII Feedthroughs

Slides:



Advertisements
Similar presentations
Inspection & Preventive maintenance of breakers
Advertisements

Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
How to Pull a Truck & Trailer Safely Ethan Williams.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
Power Brake Systems.
Dielectro-Rheological Device (DRD)
26 September 2000 High Voltage Plates and Capacitors Jack Fowler.
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
Failure Analysis for the Medical Device Engineer Case Study – Surgical Tool Blade.
Sputtering Deposition System R eginald B ryant X u S un MAS 961, Spring 2004 Project Proposal.
Lockout/Tagout for Affected Employees Understand the Basics.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Mechanics Electricity & Magnetism Thermal & Modern.
Recent Results from Dragonfire Armor Simulation Experiments Farrokh Najmabadi, Lane Carlson, John Pulsifer UC San Diego HAPL Meeting, Naval Research Laboratory.
LECTURE LECTURE OUTLINE Weekly Deadlines Weekly Deadlines Electronic Properties I Electronic Properties I.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Main Drift Chamber Yuanbo Chen Ihep Motivation (MDC IV) The BGO crystal used in L3 will be used for BES III ’ s Calorimeter. The space for MDC.
LEPP meeting Dan Peterson ILC highlights : Development of a TPC for the ILD detector at the ILC There are some significant differences between.
How to Maintain your computer. For many individuals a computer is a fairly significant purchase, and something they wish to find last. The easiest method.
CLAS12 Drift Chamber Prototyping
ContentPages 1.The Objectives of this Project 2 2.The Objectives of this Meeting 3 3.The Different Ideas Explained( 4-10) a)Diffraction 4-5 b)Resistance.
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
Balances The balance is an instrument which measures the mass of a body or substance using the gravity force which acts on that body At present, there.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
Knowing about Electric Fuel Pumps. An electric fuel pump is a device used to power an automobile's engine by directing the fuel through electronic means.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Quick Start Guide for Flex Flow Pump
Holders and Pumps Summary
Doble Power Factor Bushing Test
High Voltage Engineering
Considerations from machine protection and the ELQA teams
Low energy nuclear reaction occurring in hydrogen-loaded nickel wire
Characterization of Mechanical Properties of Bi2Sr2CaCu2O8-x Superconductor through Scanning Electron Microscopy44 Alexandra Putney, Gavriel DePrenger-Gottfried,
Graphene for Use in Energy Storage Systems
HO Corrector Magnets: decapole test and future plans
Transformations.
Structure and etc Shoji Uno (KEK) at B2GM
S0 Status report from KEK
Region I: stringing 1/3 done on 1st chamber!
Renovation of the 45-year old PS magnets
Some proposals on HV circuits realization for segmented straw detector
How The Damaged Spark Plugs Affect Your Car
Light Bulb or Heat Bulb?.
Most Effective Methods to Tighten the Battery Terminal
What are the Causes of White Smoke Produced From the Exhaust
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
Ac Maintenance in Dubai | Al Nadeem.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
STRAIN GAGE CHARACTERISTICS
ELECTRICAL POWER-II Electrical engineering sixth semester
Circuit Analysis and Troubleshooting
Careers in the Textile and Fashion Industry
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
IC AND NEMS/MEMS PROCESSES
B.Satyanarayana, TIFR, Mumbai For INO Collaboration
Test of the cleaning gas mixtures.
Cooling System Get the engine up to optimum operating Temperature as quickly as possible and maintains it at that temperature. Controls the heat produced.
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Instruments & Electrical Measurements Lecture 4
Nikhef/Bonn LepCol meeting
UNECE / OECD Apricots (2010)
Presentation transcript:

BESII Vertex Chamber and MDCII Feedthroughs Russell Malchow BES 30 Year Symposium

BES II Upgrade BES 30 Year Symposium

Mark III Vertex Chamber Rebuild As delivered to CSU Initially it was thought that the straws and sense wires were intact, and only the high pressure endplate needed to be repaired. (Front-end electronics also had to be replaced.) BES 30 Year Symposium

Vertex Chamber required a more extensive rebuild: feedthroughs (and straws and wires) had to be replaced. BES 30 Year Symposium

BES 30 Year Symposium

BES 30 Year Symposium

BES 30 Year Symposium

MDC II Feedthrough Design BES 30 Year Symposium

MDCII Feedthrough Timeline Fall/Winter 1993: Design finalized and molder selected. Spring 1994: Feedthroughs prototyped. Summer/Fall 1994: Feedthroughs produced in Colorado. (~52,000). 1995: Feedthroughs and MDC II installed at IHEP. May 1996: Voltage applied to MDCII, then turned off for summer. October 1996: MDCII turned back on and run more or less continuously. BES 30 Year Symposium

BES 30 Year Symposium

After running for a few weeks: High current draw noticed on MDCII. Prototype chamber at IHEP also developed high current. Feedthroughs on HV at CSU showed similar behavior. Feedthroughs were checked for surface contamination (hexane wash and gas chromatograph). They were clean. Used and unused feedthroughs were returned to CSU for evaluation. Feedthroughs were examined in SEM. Samples were sent to DuPont for evaluation. BES 30 Year Symposium

Energy Dispersive Spectroscopy Hexane Wash and Gas Chromatograph Off Crack In Crack BES 30 Year Symposium

SEM images of outer surfaces of MDCII feedthroughs Unused Feedthrough: ~1 micron cracks Used Feedthrough: ~10 micron cracks BES 30 Year Symposium

Used MDC II Feedthrough Damage BES 30 Year Symposium

BES 30 Year Symposium

Conclusion: The molder adjusted temperatures in order to release parts from the mold and maintain mechanical tolerances. The temperature settings he used were outside Dupont’s recommendation, and resulted in poorly crystallized Delrin. BES 30 Year Symposium

Conclusion continued: The feedthroughs shrank with time, opening stress cracks, which enlarged in the high electric field of the endplates, degrading dielectric properties of the feedthroughs to the point of failure. A split HV scheme was adopted at BES, dividing the voltage between the sense and field wires. BES 30 Year Symposium

China and US split funding for a replacement MDC. In the end: China and US split funding for a replacement MDC. Time, money, and data were lost, but hard work and excellent US/China cooperation solved the problems, and BES moved forward. BES 30 Year Symposium