IEEE OmniRAN TG Status Report to IEEE 802 WGs

Slides:



Advertisements
Similar presentations
Omniran TG 1 IEEE OmniRAN TG Status Report to IEEE 802 WGs
Advertisements

Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Omniran TG 1 IEEE OmniRAN TG Status Report to IEEE 802 WGs
Omniran CF00 1 CF ToC Refinements Date: Authors: NameAffiliationPhone Max RiegelNSN
Omniran CF00 1 Content and outline considerations for Annex: Applicability to non-IEEE 802 PHY layer technologies Date: Authors:
Omniran TG 1 IEEE OmniRAN TG Status Report to IEEE 802 WGs
Ec GSG 1 OmniRAN TG perspective on cost and benefits of 5G SC options Max Riegel OmniRAN TG chair
Omniran CF00 1 Key Concepts of Association and Disassociation Date: Authors: NameAffiliationPhone Max RiegelNokia
Omniran TG 1 IEEE OmniRAN TG April 19 th, 2016 Conference Call Max Riegel, Nokia (TG Chair)
IEEE OmniRAN TG Status Report to IEEE 802 WGs
OmniRAN EC SG Proposals towards IEEE 802.1
IEEE OmniRAN TG Status Report to IETF – IEEE 802 Coordination
July 2014 doc.: IEEE /21/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
P802.1CF within the scope of 5G
Proposal to Amend the Configuration and Maintenance Model
Time Sensitive Networking within the scope of P802.1CF
P802.1CF within the scope of 5G
Chapter 7.1 Restructuring Proposal
Brief Introduction to IEEE P802.1CF
<month year> doc.: IEEE < e> <May 2018>
IEEE OmniRAN TG July 2016 F2F Meeting San Diego, CA
IEEE OmniRAN TG June 21st, 2016 Conference Call
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report.
IEEE OmniRAN TG February 23rd , 2016 Conference Call
Date: < yyyy-mm-dd >
IEEE OmniRAN TG May 2016 F2F Meeting Budapest, HU
<month year> doc.: IEEE < e> <May 2018>
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Max Riegel, Nokia Bell Labs (TG Chair)
IEEE OmniRAN TG July 2016 F2F Meeting San Diego, CA
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Key concepts of authorization, QoS, and policy control
<month year> doc.: IEEE < e> <March 2018>
<month year> doc.: IEEE < e> <January 2018>
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report.
IEEE OmniRAN TG June 21st, 2016 Conference Call
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
doc.: IEEE <doc#>
Submission Title: [Proposed project timeline]
Max Riegel, Nokia Bell Labs (TG Chair)
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
<month year> doc.: IEEE < e> <January 2018>
July 2014 doc.: IEEE /18/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG April 19th , 2016 Conference Call
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report.
802.1CF ToC Refinements Abstract
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4n Chinese Medical Band Closing.
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Max Riegel, Nokia (TG Chair)
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <March 2018>
doc.: IEEE <doc#>
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
<month year> doc.: IEEE < e> <March 2019>
<month year> doc.: IEEE < e> <July 2019>
IEEE OmniRAN TG Status Report to IEEE 802 WGs
IEEE OmniRAN TG Status Report to IEEE 802 WGs
Submission Title: TG9ma Closing Report for July Meeting
<month year> doc.: IEEE < e> <September 2019>
<month year> doc.: IEEE < e> <July 2019>
TGax November 2017 Closing Report
<month year> doc.: IEEE < e> <September 2019>
Presentation transcript:

IEEE 802.1 OmniRAN TG Status Report to IEEE 802 WGs 2016-05-26

IEEE 802.1 OmniRAN TG Resources OmniRAN TG maintains a Wiki page on mentor to reflect its status and achievements https://mentor.ieee.org/omniran/bp/StartPage Also showing meeting announcements and conference call dial-in information OmniRAN filespace on mentor is used for contributions and meeting documents https://mentor.ieee.org/omniran/documents Recent P802.1CF D0.0 draft is available by http://www.ieee802.org/1/files/private/cf-drafts/d0/802-1cf-d0-0.pdf FYI: OmniRAN P802.1 PAR https://development.standards.ieee.org/get-file/P802.1CF.pdf?t=81644900003

OmniRAN TG Achievements Budapest meeting, May 24th – 26th Conclusion on amendment to NRM on access network virtualization and slicing including Orchestrator, representation of NMS, and way forward for inclusion of NFV Conclusion on text for Chap. 7.8 (Fault Diagnostics and Maintenance). Conclusion on open comments with discussion on revised text for Chap. 7.1.4 Network Initialization showing demand for further clarification about scope and intention of proposal. Initial proposal on Chap. 7.7 (Monitoring and Accounting) Initial proposal on Chap. 7.3 (Association and Disassociation) Creation of contribution to 5G SC Budapest meeting on May 25th. Review of P802.1CF project plan Creation of next revision (Draft P802.1CF-D0.1) after June 2016 conference call for review and revision during July plenary meeting. Assumed timeline within current scope: content roughly complete after Jul 2016 plenary, starting LB after Nov 2016, SB Jul 2017

Looking forward to next session in San Diego, July 25-28, 2016 Envisioned topics: Review of comments received for D0.1 Enhancements to the text of the addressed chapters Review of text contributions addressing the remaining open sections Authorization, QoS and policy control Annexes Special session on 5G SC on network specification demand for alternative RLAN/ITU-R WP5A approach Conference call: June 21st, 09:30 AM ET Agenda and dial-in details on 802.1 mailing list and OmniRAN TG Wiki page on mentor https://mentor.ieee.org/omniran/bp/StartPage Review new or enhanced text contributions for inclusion into D0.1 Association and Disassociation Authentication and trust establishment Monitoring and accounting Access network initiation SDN Arrangements for San Diego F2F