Solving the Challenges of Traffic in Northern Virginia

Slides:



Advertisements
Similar presentations
New Public Transit Alliance (NuPTA) RIPEC Study: Transportation at a Crossroads (2002) Growing Smart with Transit: A Report of the Transit 2020 Working.
Advertisements

County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Issuance of the Series 2014 Capital Projects Revenue Bonds John W. Lawson Chief Financial Officer April 16, 2014.
1 City of Manassas Park Overview of NVTA and Taxes/fees from HB 3202 June 19, 2007.
Increasing the Navajo County Expenditure Limit: Key Information for Voters “Proudly Serving, Continuously Improving”
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
County of Fairfax, Virginia HB 2313 Transportation Funding— Projects and Priorities Society of American Military Engineers Northern Virginia Post May 1,
Transportation Legislation Overview Presented By: Dwight L. Farmer, P.E. Executive Director/Secretary Hampton Roads Metropolitan Planning Organization.
State Transportation Dollars: Addressing Needs Or Running Out Of Gas VIRGINIA MUNICIPAL LEAGUE TRANSPORTATION POLICY COMMITTEE JULY 24, 2014.
Colorado Transportation Finance and Implementation Panel Overview Fort Morgan,Colorado September 13, 2007.
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
A New Era of Transportation Improvements Martin E. Nohe, Chairman.
Presentation to the Orange County-City of Orlando Consolidation of Services Study Commission Transportation Committee Meeting September 8, 2005.
International Partnership Meeting Thursday, January 17, 2013 Washington D.C. 1.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
Michigan’s Roads Crisis: Study Findings, Conclusions and Where Do We Go From Here? Best Practices Conference Rick Olson, State Representative, 55 th District.
Ron Hall Tribal Technical Assistance Program Colorado State University
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Structure of Presentation Federal Requirement Methodology WMATA Expenditures and Core Capacity Constraint Draft Revenues and Expenditures for 2015 – 2040.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
Beyond the Crossroads National Conference on Transportation Infrastructure and Regulatory Policy May 27, Denver, CO Future Infrastructure Needs,
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Financial Planning Session E-1 The Metropolitan Transportation Planning Process.
Drive Safe Hampton Roads Thelma Drake, Director September 27, 2013.
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
June 9, 2009 VTA 2009 Annual Conference DRPT Annual Update 2009 VTA Conference Chip Badger Agency Director.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Congestion Congestion Congestion Congestion Congestion Congestion Interstates Years----$12 Billion Local Roads.
The Regional Big Picture Preparing to Conduct Outreach For the 2010 Constrained Long-Range Plan Presentation to the TPB Access for All Advisory Committee.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
Presentation to the Joint Committee On Transportation Oversight 1 Jack Basso Chief Operating Officer and Business Development Director American Association.
Commonwealth Public Transportation Funding Steve Pittard Chief Financial Officer June 16, 2016.
Beyond Oil Transforming Transportation: A National Demonstration Project Breakout Session: A New Paradigm - Future of Transportation, Funding, and Climate.
John W. Lawson Chief Financial Officer
Integrating Transit and Highway Solutions In High Volume Corridors
Effectiveness of Funding Mechanisms and
Update of Transportation Priorities Plan
State Legislative Update and Government Relations Overview
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
State and Local Government
To be Discussed Background of Road Bond Program
Route1 Multimodal Alternatives Analysis Status Update
Nice to Meeks you….The Transform 66 Multimodal Project
What is AMC? A Voluntary Association of Minnesota’s 87 Counties Since 1909 The Voice of County Government in Minnesota An Education, Training & Communication.
Regional Roads Committee
• Congestion • Congestion • Congestion
DATA Transportation 101 Project Status March 20, 2002
21st Century Transportation Committee Finance Subcommittee
Transportation Funding
Progress Report Implementing the Interregional Transportation Strategic Plan May 22, 2003 in Sacramento Brian Smith, Deputy Director, Planning and.
SB1: Road Repair & Accountability Act of 2017 “Local Perspective”
DRPT Overview Jennifer Mitchell Agency Director
State Highway Jurisdictional Transfer (Turnback) Program
Board Transportation Committee October 13, 2015
Transportation Forum for Northern Virginia’s Elected Leaders April 23, 2018 Presented by: Monica Backmon, Executive Director.
Responsibilities and FUNDING
Transportation Task Force Mission and Vision
Commonwealth Transportation Board
I-81 Corridor Improvement Plan
Regional Transportation Sales Tax Transportation Investment Act of 2010 and Transportation Funding Act of 2015 as of April 5, 2017.
Draft FY Six Year Program
Comprehensive and Dependable Transportation Plan
State Highway Jurisdictional Transfer (Turnback) Program
SMART SCALE Round 3 Joint Commission on Transportation Accountability
Overview Recap of the I-81 Corridor Improvement Plan
Navigating Multiple Jurisdiction
Presentation transcript:

Solving the Challenges of Traffic in Northern Virginia Northern Virginia Transportation Authority Solving the Challenges of Traffic in Northern Virginia John Mason Former Executive Director October 27, 2008

DISCUSSION OUTLINE The Challenge The Response The Context The Challenge The Response Northern Virginia Transportation Authority (NVTA) TransAction 2030 Plan Implementation Current Situation Principles

THE BIG PICTURE The federal context 2009 a critical year for federal transportation funding 6-year reauthorization Planned spending will exceed cash available 6 year plan assumes little growth of federal revenues National Surface Transportation Infrastructure Financing Commission System demands outpacing investments Fuel tax no longer sufficient at current rate Envision more user charges Need intelligent investments to improve system The state context Principal revenue source (gas tax) unchanged since 1986 Law requires that maintenance and operations are first priority First “maintenance deficit” in 2002; by FY14 will be >$575 million Construction costs climbing – 40% since 2005 VDOT projects 47% cut in construction; more cuts coming DRPT projects 10% cut in funding

NORTHERN VIRGINIA CONTEXT In the context of the Commonwealth In the context of the Metropolitan Washington region The Nation’s second most congested metropolitan region Half the region’s growth over next 20 – 30 years will be in Northern Virginia Jobs/Housing imbalance shifting workers from “core” to outer suburbs In the context of the next 25 years Add 650,000 new jobs (to existing 1.2 million jobs) Add 900,000 new residents (to existing 2.2 million people) Land Area 4% Source: Census Roadway Lane Miles Source: VDOT Vehicle Miles Traveled Transit Source: Northern Virginia Transportation Commission Population Economic base (jobs) Source: Woods and Poole Northern Virginia Rest of Virginia “By the mid-21st Century, Baltimore and Richmond will join with the stronger Washington [regional] economy to form the Chesapeake megapolitan region.” – Charting the Future of the National Capital Region.

THE CHALLENGE HIGHWAY SYSTEM PERFORMANCE 2005 Highway System Peak Period Performance

NVTA is prepared to make a difference THE RESPONSE A structure – Northern Virginia Transportation Authority (2002) Charter Composition Committees Decision Making A plan – TransAction 2030 (2005) Key findings Fundamental concept – corridors Corridors Funding (2007) A program – Priority to projects “ready to go” NVTA is prepared to make a difference

NVTA – CHARTER Powerful charter! Is a political subdivision of Commonwealth Prepares regional transportation plan; establishes regional priorities Issues bonds and recommends tolls to Commonwealth Transportation Board (CTB) May apply for, and negotiate, federal and state grants May construct or acquire the transportation facilities specified in plan May enter into agreements/leases with public/private entities for operation of facilities May provide transportation facilities or services Prepares plan for mass transportation Powerful charter!

Strong role for “mayors and chairs”, balanced with state perspective NVTA - COMPOSITION Chief elected officer of each jurisdiction (or elected designee) Two members of the House of Delegates One member of the Senate Two gubernatorial appointees One from the Commonwealth Transportation Board Transportation-experienced person Three non-voting members VDOT representative DRPT representative Town representative Strong role for “mayors and chairs”, balanced with state perspective

Multiple perspectives are engaged NVTA - COMMITTEES Required Technical Advisory Committee (TAC) 9 members (6 appointed by jurisdictions; 3 by Secretary of Transportation) Experience in relevant disciplines Advise on development of project and funding strategies Planning Coordination Advisory Committee (PCAC) At least one elected official from each jurisdiction At least one elected official from each (eligible) town Additionally Joint Jurisdictional and Agency Advisory Committee (JACC) Technical staffs from jurisdictions and agencies Finance Committee Multiple perspectives are engaged

Ensures the “buy-in” of all jurisdictions NVTA – DECISION MAKING Quorum Majority of Authority (9 of 16) Majority of jurisdictions (5 of 9) Decisions 2/3 of members present and voting 2/3 of jurisdictional representatives representing 2/3 of population (6 of 9) Constraint Cannot approve a project in a jurisdiction if not agreed by jurisdiction Ensures the “buy-in” of all jurisdictions

TRANSACTION 2030 KEY FINDING All modes experiencing increased congestion Over $15 billion (2005 dollars) needed Completing items in the region’s constrained long range plan (CLRP) does not improve the highway level of service (LOS) The highway LOS improves only with completion of TransAction 2030 projects Transit LOS analysis shows that more areas have the density to support transit service Both highway and transit projects are needed to address Northern Virginia congestion And situation has only worsened since 2005

TRANSACTION 2030 FUNDAMENTAL CONCEPT - CORRIDORS 8 Regional Corridors 7 267 VA Route 7 and Dulles Toll Rd VA Route 28 Loudoun County Parkway/ Tri-County Parkway/VA 234/ VA 659 Fairfax County Parkway Prince William Parkway I-495 Beltway I-95/I-395-US Route 1 I-66/US-29/US-50 28 66 395 495 7100 1 95 3000 234 12

Exacerbated by VDOT and DRPT shortfalls NVTA - FUNDING General Assembly authorized NVTA to impose (2007): Congestion Relief Fee (Grantor’s Tax) - .40 cents per $100 Initial Vehicle Registration Fee – 1% of value Regional Vehicle Registration Fee - $10 annually Motor Vehicle Rental Tax – 2% of rental rate Transient Occupancy Tax – 2% of hotel rate Safety Inspection Fee - $10 annually Sales Tax on Auto Repairs – 5% of labor charges Generates approximately $300 million annually in Northern Virginia In February 2008, Virginia Supreme Court ruled General Assembly had exceeded its constitutional authority Exacerbated by VDOT and DRPT shortfalls

NVTA – FUNDING ALLOCATION 40% “shall be distributed on pro rata basis” to jurisdictions based on amounts generated 60% “shall be used solely for transportation projects and purposes that benefit counties and cities embraced by Authority” Debt service on any bonds issues $50 million per year for WMATA (Metro) capital expenses $25 million per year for VRE capital and operating expenses Remaining “shall be used for projects benefiting the localities embraced by Authority, with each locality’s total long-term benefits being approximately equal to the total of the fees and taxes received [from each jurisdiction]” Key to success = everyone wins

TRANSACTION 2030 PLAN IMPLEMENTATION Jurisdictional projects (FY08/09/10) $260 million Bond package $120 million Transit projects ($39 million) Multi-modal projects ( $6 million) Road projects ($57 million) Initial Six Year Plan (FY 09 and 10) $186 million Transit projects Multi-modal projects Road projects WMATA (Metro) (FY08/09/10) $150 million VRE (FY08/09/10) $56 million $662 million investment toward TransAction 2030

THE SITUATION WITHOUT NVTA FUNDING AND WITH VDOT REDUCTIONS

PRINCIPLES FOR FUNDING Transportation is fundamentally a state responsibility NVTA is comfortable with the 7 taxes and fees previously approved Adopted long-range plan requires $700 million annually in new funding Must provide significant increases in funding for all modes from stable source(s) Should include both regional and local components If statewide funding increased, Northern Virginia should continue to receive at least the share it receives under existing formulas Continue to match federal interstate and primary road earmarks with state funds Provide on-going revenue stream of capital funding from WMATA (Metro) NVTA has proven approach that works

Working With Our Partners