Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Monday 11/07: Recovery Plenty of accesses.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Status Sun Morning 20-Mai
LHC Morning Meeting - G. Arduini
LHC Operations overview Week 28 – Getting back
Tuesday 20 March 2012.
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Wednesday 10/5 Cryo recovery until 18:30
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Presentation transcript:

Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not find an explanation for the fault BLM problems 14:00 Inject for test ramp longitudinal blow-up 15:30 Test ramp dumped BPM calibration problem It seems this is due to the fact that the telegram is not sent out…. 17:30 Some injection steering with 12 bunches on B1 17:45 Injecting for physics fill #1858 – trains of 144 bunches No difference seen compared to trains of 108 bunches B2 some vertical blow-up at injection 19:00 Luminosities around 1.1e33, but did not declare yet stable beams 19:04 Beam dump fill #1858 due to Big UFO IP2 09/06/2011 LHC 8:30 meeting

Wednesday 8th (II) & Thursday 9th 20:04 Injecting probes fill #1859 21:07 SPS extraction problem for B1; TI2 power converter problem Use waiting time to change chromaticity on B2 (1094 bunches) and study BBQ amplitude signals – no obvious conclusion 22:20 SPS back but problems with “beam dump” XPOC time stamp from ring FBCT – works again later without any action IPOC server down – ok after server reset 23:14 injecting probes fill #1859 01:09 Stable beams, lumi 1.05e13 Small beam currents, but no blow-up 05:04 Site wide electrical glitch tripped the beam, caught by FMCM Int. lumi 13.3 pb-1 QPS not ok for RB.A56 (new QPS) and RB.A81 (old QPS) 07:45 Start pre-cycle 09/06/2011 LHC 8:30 meeting

BLM problem 09:50 BLM sanity check is failing 10:20 «  The intervention on the BLM might be longer than expected  » 12:50 BLM problem “solved”: Sanity check was failing due to 6 monitors out of limits. These monitors have been excluded from the sanity check, since they are not critical (not connected to BIS): but there is a reason that they are there! They have been masked from the XPOC as well, as they are towards the end the dump line (last 6 monitors on TD62): new release of XPOC limits To be fixed as soon as possible – needs 2 to 3 hours intervention 09/06/2011 LHC 8:30 meeting

New longitudinal blow-up We have tried with 12 bunches an improved longitudinal blow-up, with a target-length that is increased at the beginning of the ramp (1.35 ns), then linearly reduced to reach 1.25 ns at start flat top. The results are mixed: We do not under-shoot anymore (good!) but we still have ~ 100 ps dispersion in results. We got to 1.1 ns on B1 and 1.2 ns on B2 (see attached). We keep observing fast 150 ps "jumps". These are not related to the blow-up method and are investigated in parallel. We leave this "new" blow-up operational for next physics fill. Philippe B. 09/06/2011 LHC 8:30 meeting

Bunch length with new blow-up Test ramp with 12 bunches Both ramps finishing with 1.1 – 1.2 ns end of ramp Physics ramp 1094 bunches “I have made the excitation a bit more aggressive for next ramp. I will keep checking.” This gave 1.2 and 1.3 ns bunch length after the ramp of the night 09/06/2011 LHC 8:30 meeting

Longitudinal Blow-up Ramp of last night with “the excitation a bit more aggressive” 09/06/2011 LHC 8:30 meeting

19:04 Beam dump fill #1858 due to Big UFO IP2 TCT Q4 MKI-D MKI-C 09/06/2011 LHC 8:30 meeting

Fill during night: no blow-up (BSRT sigma’s) 09/06/2011 LHC 8:30 meeting

Plan Physics 1092 x 1092 bunches, trains 144 bunches If a good couple of fills: +144 bunches Outstanding End of fill: TCL adjustment Q’’ Q’ decay following long fill 09/06/2011 LHC 8:30 meeting