Stoke Medical Centre RIBA Plan.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PRESENTATION ON TURNKEY CONSTRUCTION.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Behaviour and Design of Steel Structures Lecture 3 Conceptual design.
TurnKey Project Management Services Capabilities Briefing.
CIC Scope of Services Frances Paterson & Tony Broomhead.
PROJECT 1 Pulse FM Nathaniel Gray Outline of Proposed Development Scope of proposed development ‘Pulse FM’ is a local Geelong community radio.
Constructionsite Construction Procedure Ron Gatepain.
MBA (Trimester) Term V Module Title : Project Finance and Management
“BRIDGING” DESIGN-BUILD Residential Suites/Residential Dining Complex 694 Beds in 8 Student Suites / 2-6 Story Buildings 732-Seat Dining in 2-Story Building.
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
Development Appraisal Chia Fah Choy MSc, BAppSc (Hons) Assistant Professor, BE, FES, UTAR.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Hospital Planning. Hospital Planning Team Hospital planning starts with the formation of a planning team : A.Hospital Administration B.Reps from clinical.
GRK INFRAESTATE PRIVATE LIMITED BHOPAL M-207, 2’nd Floor, Vijay Stambh, M P Nagar, Bhopal – BANGALORE Flat No. C -02/ 001, Provident Housing, Dodballpur.
The MEDIN “Data Clause” –Good data management is essential if data are to be re- useable. – Often data management is only considered as an afterthought,
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
2014 AIA San Diego Design Awards Submission Instructions Slide PowerPoint Template for the Foundation Categories Each project entry must submit a separate.
Topic1b: Project Life Cycle
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Course guide on Food Plant Design and Pilot Demonstration (FST 409) University of Agriculture, Abeokuta Department of Food Science and Technology.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Construction of a Transfer Station
Health, Safety and Environmental Update October 2015 Purpose: The intention of this briefing is to pull together and share both Optimise and other contractor.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Plan Waste Assessment MWM01A. What is the purpose of a waste assessment?  The main aims of a waste assessment are to:  Identify each waste stream on.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
CDM Construction Design and Management
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
By SAJJAD KHUDHUR ABBAS – P81540
Planning and Realisation of Wind Farms
Design process.
The Design Team Carl James.
Phillip Island Aquatic Working Group
Technical Specifications & Employer's Requirements
SUPPLY CHAIN COLLABORATION A Practical Example
Food Plant Design and Pilot Demonstration
CHAPTER 5 TECHNICAL ANALYSIS.
RIBA Plan of Work 2013.
Workshop Activity 1 (in groups – 4 students in each) – 15 minutes
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Clydebank Town Centre Office.
CENELEC TC215 WG3 (EN Series)
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-Contract Cost Control
Pre-contract Planning and Practice
Energy Huntsville Opportunity Report March 2017
M&E SYSTEM.
The Acorn Medical Practice, Wood Street, Mansfield
Back Ground Information
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Design process.
New Primary School Woods Meadow
Project delivery RIBA stages Define design deliver Key Objectives 1 2
On-Site Facilities for Pre-production deployment
Effective Construction Safety Management
RIBA Plan of Work 2013.
RIBA Plan Tom Robinson sir david Swindells Vii
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Stoke Medical Centre RIBA Plan

RIBA Plan Appraisal Developed Brief Concept Design Development Technical Design Production Information Tender Documentation Tender Action Mobilisation Construction to Practical Completion Post Practical Completion

Appraisal The client requires a new build single storey medical centre on a piece of unused land. The medical centre shall have surgical areas, waiting room and offices. The plant room is in the roof space. In preparation, studies and surveys must be undertaken to ensure that is feasible to undergo the development.

Developed Brief Methods, procedures and structures of: Surveying the site to ensure that it is suitable for the construction to begin. People involved would be: Surveyors, HSE, Environmental Organisations, Client, Local Councils and Residential Groups. Clearing the site of any waste materials to allow construction to begin. Outline of requirements for the new build. Including cost, materials and time constraints.

Concept Outline proposals for the design of a structure that is to be set out over one floor and the procurement of the necessary materials and equipment. The new medical centre is to consist of a large ground floor area with treatments areas. The building facilities are to be suitable for both men, women and disabled people.

Design Development As well as what was detailed on the previous slide, specific development of the outline design to incorporate a lift shaft and stairwells. Design brief shall be confirmed as complete once the client is satisfied. Planning permission to be sought on completion of the design brief.

Technical Design Client, Consultant, Designers and Contractors need to be involved in issuing and finalising the technical design of the building and its mechanical and electrical services.

Production Information Detailed information for the construction