Miami-Dade Water & Sewer

Slides:



Advertisements
Similar presentations
Guide to data collection A look at why now… and why us.
Advertisements

A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Novant Health: Transforming Revenue Cycle Services in the Ambulatory Setting R. Henry Capps Jr., MD, FAAFP, Senior VP of Physician Services & Medical Group.
Project Storyboard Template
Project Change Management
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
Problem Management Overview
Copyrighted - No Reproduction TELUS June 8, 2005 Slide 1 North America’s Leading Experts for Measuring and Improving Call Center Service Quality Performance.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Final Client Briefing Call Center Wait Time Project August 27, 2012 – December 11, 2012 State of Florida – Department of Economic Opportunity Florida State.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Systems Development Dr. Ashok Agarwal.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
1 Project Name Team Lead Location Month XX, Year.
Project Objective: To Reduce Number and Cost of Public Works & Waste Management Heavy Fleet Repairs Project Objective: To Reduce Number and Cost of Public.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Team: Right on Time! Updated April 14, 2015
Lean6σ GOLD Urgent Support A Reduction in Urgent Customer Requests Resolution Cycle Time Charles Hollingsworth.
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
Problem Solving.
Improving Customer Service at BTU Through Benchmarking APPA National Conference Anaheim, California - June 20, 2005.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Last Updated: Team: Allison Duffy (Co-Team Leader) Joseph M. Sabater (Co-Team Leader) Jennifer Hill Asheley Hepburn Green Belt Project Objective:
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Green Belt Project Objective: To Improve Workplace Security Green Belt Project Objective: To Improve Workplace Security Six Sigma DMAIC Improvement Story.
Class Registration and Phone Tree Improvement Project City of Albany Katie Nooshazar Jorge Salinas Feb 8, 2010.
Nortel Contact Center: An Overview
Georgia Dept. of Revenue
Project Management Business Management.
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Florida Department of Health in Seminole County Quality Improvement DMAIC Project 2016: Increasing Timeliness of CSR Entries into HMS Project Team: Crystal.
Application Outsourcing: Achieving Success & Avoiding Risk
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Project Management Chapter 3.
Chapter 11 TQM & Quality Tools.
Problem Solving Sheet Guidelines
Introduction to Quality and Statistical Process Control
Problem Solving Process.
Six Sigma DMAIC Improvement Story
Reemployment Assistance Contact Center Journey
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
A Review of BSC Vocabulary
Lean Six Sigma DMAIC Improvement Story
PDCA Problem Solving Guide
OPS/571 Operations Management
Presented By: <Names> <Team Name> <Date>
Lean Six Sigma DMAIC Improvement Story
Title: Owner: Ver: Date:
Quality Management Six Sigma
Project quality management (PMI body of knowledge)
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Introduction to Projects
CIS12-3 IT Project Management
Developmental Disability Targeted Case Management
Measure Phase Wrap Up and Action Items
by Operational Excellence Consulting LLC
Maintenance Opportunities
System Analysis and Design:
Sepsis Program Development
Lean-Green belt six sigma program
Presentation transcript:

Miami-Dade Water & Sewer FLORIDA BENCHMARKING CONSORTIUM APRIL 21, 2016 Miami-Dade Water & Sewer Using Data to Reduce Call Wait Times Presenters: Lourdes Avalos Michael Amador Jason Mena

MD-WASD Facts 2016 Miami-Dade Water and Sewer is the largest water and sewer utility in the Southeastern United States, serving nearly 2.3 million people a day Provides wholesale water service to 13 municipalities, as well as water and wastewater service to the unincorporated areas of the County Receives an estimated 48,000 calls per month 78 dedicated call center agents

Process Flow Chart 3 Mention 12 (24) call types/skillsets. Q1: % of Calls resolved in IVR Mention 12 (24) call types/skillsets. Q2: % of Calls Answered within 2 Minutes of Queue 3

Call Types Customers call for assistance with: Start new service (CM) Stop service (DM) Request Extension on bill (EXT) Transfer service to new location (XFER) Tampered meter (CCI) Underground Leak (UGL) Conservation (CONSV) Disconnection (CONP) Billing Related Inquiries (HB) Lien Issue (LIEN) Operator (OPER) Other (Other) Each call type is provided in either English or Spanish. 4

Problem Identified Data for our Q2 indicator showed a sizeable gap. 5 Source: ASE Scorecard 5

Develop Project Charter 6

Develop Project Timeline Plan The project’s timeline followed a traditional DMAIC approach to problem solving. 7

Monitor Team Progress A DMAIC Checklist was used to monitor progress and identify analytical tools used. Team identified an indicator; developed a Flowchart and a Spreadsheet Spreadsheet Line Graph Histograms and Paretos Single Case Bore Analysis and Fishbone Countermeasures Matrix; Barriers and Aids; Action Plan Before and After Line Graph Additional Bar Graphs Process Control System; Flowchart 8

Data Inaction: 9

Data In Action: 10

Stratify the Problem The team stratified Call data from the month of May 2014 (38,084 calls) and found: Explain intervals vs. calls. So the team stratified the call details for the 14,382 calls answered after 8 minutes (“late”). 11

Call Wait Time is attributed to overall call Handle Time, Call Volume, and Staffing. Handle Time was addressed in a prior project, and some staffing changes are currently being implemented, so the team narrowed in on Call Volume. In looking at the Volume of late calls (14,382) the team discovered that: PROBLEM STATEMENT: The High Bill Skillset Calls account for 1/4 of all Late Calls (>8 Min. Answer Time) 12

Identify Potential Root Causes Root cause analysis was performed with a fishbone diagram to identify reasons for the voluminous number of late High Bill calls. A B C D 13

Identify and Select Countermeasures The team brainstormed many countermeasures and narrowed them down to these for evaluation: Countermeasures Matrix   Problem Statement Verified Root Causes Countermeasures Legend: 3=Moderately 5=Extremely 2=Somewhat 4=Very 1=Little or None Ratings Effectiveness Feasibility Overall Take Action? Yes/No The HIGH BILL Skillset Calls account for 1/4 of all WASD Late Calls (>8 Mins. Wait Time) A - The standard for staffing/ training at call center is out of date. Provide HIGH BILL Skillset training as part of Level 1 training (initial set of skillsets) to all new calltakers, thereby increasing the pool of capable agents on that skillset. 3  5  15  Y  B - The standard for providing information on credit adjustments is insufficient. Provide an example on the website of a sample pool or leak credit scenario, showing allowable ccfs credited and $ credit due AND/OR add an insert to bill with rate structure * 5 15 Y C – No standard exists to relabel bill. Redesign the bill with a REVISED heading by coding a reissued bill printed within the same billing cycle OR: stamp the revised bill with a handheld stamp. 3 D – No standard exists to allow for modification of IVR. Ensure new Avaya phone system configuration will perform review/qualification of account to determine whether account is eligible for a self-service payment extension. 25 Y Phase 2 The team selected countermeasures for implementation. 14

Additional Recommendations: Relabel HIGH BILL to just BILLING call type Consider 'staffing pod' for BILLING calls and allocate appropriate average # of Call-takers. Identify dedicated staff to handle BILLING calls as their top priority, and then other calls as available Ensure (or prioritize training for) Call-takers that had OTHER and OPERATOR Skillset type also have BILLING Skillset Track # of BILLING callback requests (impacting available staff and ports) Consider acquiring license for workforce optimization software module to assist with staff scheduling 15

Develop and Implement Action Plan The team implemented an Action Plan for their Countermeasures. 16

Additional Call Center Improvements: 311 Skillset Sharing Partnership Project Employee Incentive Programs (team competitions, parking privileges, pizza parties, perfect attendance recognition, etc.) Overall Reduction of Backlogs in Corrective Billing Adjustments Reserved Agents Pool 311Direct phone app “One-Stop-Shop” Website Application Enhancements 17

Q2 – % of WASD Calls Answered on time (within 2 Mins. of Queue) Review Results The team collected indicator data and reviewed results of its implemented countermeasures. Q2 – % of WASD Calls Answered on time (within 2 Mins. of Queue) Target = 80% * New management team begins May 2015 The team will continue the implementation and monitoring of the countermeasures. 18

Percentage Of Calls Answered Within Two Minutes (Target 80%) March 2015 vs March 2016 19

Average Wait Time March 2015 vs March 2016 ASE Target Three Minutes

Calls Answered March 2015 vs March 2016

2016… 22

Lessons Learned Next Steps: 1) Data, data, data! Having the right data to work with is crucial. 2) Having a functional IVR reporting system helps us understand the true customer experience, which will help us identify additional fixes needed. 3) DMAIC Process is systematic and effective for problem solving. The team learned to trust the process and “let the data take you to the root causes”. Next Steps: * Continue to monitor the countermeasures and performance results. * Analyze Call Queue data and continue to address long wait times. * Continue to monitor call stats after workforce optimization software is implemented to compare performance changes. 23

MD-WASD Secret Sauce To Success: TEAM!