Https://indico.cern.ch/event/807540/ n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.

Slides:



Advertisements
Similar presentations
Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
RF-Accelerating Structure: Cooling Circuit Modeling Riku Raatikainen
ISIS Second Target Station
Study of a new high power spallation target concept
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
CERN’s n_TOF neutron spallation target operating experience and future consolidation plans M. Calviani (CERN) 6 th High Power Targetry Workshop Oxford,
SHiP target and target complex Plans and perspectives M. Calviani, A. Perillo-Marcone (EN/STI) 7 th SHiP Collaboration Meeting 10 th February 2016.
SPS High Energy LSS5 Thermal contact & cooling aspects
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
Electrial Safety LS2 days November 2016 AP
New nTOF target: Design Issues
CONS and HL-LHC day Analysis of needs from TE-EPC
East Area Renovation Project Team meeting # 2 – EDMS News
Making Difficult Decisions in a Transparent Way –
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
Proposal for round jet test case
n_TOF Target HiRadMat Experiment Proposal (1704)
Ministry of Finance of the Republic of Azerbaijan
The n_TOF Facility Today
Physics Analysis Summaries towards a proposal
Measurement of the fission cross-section of 240Pu and 242Pu at CERN’s n_TOF facility CERN-INTC , INTC-P-280 Spokespersons: M. Calviani (CERN),
the s process: messages from stellar He burning
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Thermo-mechanical analysis of the D3 dump in the TT2 line (PS)
Target and Horn status report
Summary of session 5: Innovative Ideas and New R&D
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Pierre-Alexandre Thonet
nuSTORM and the Physics Beyond Colliders workshop
The DBD: Outline and Scope
Beam Dump outline work plan (UK perspective)
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
2K CB FDR Overview:  Agenda, Charge, Review Process
Peer Review Agenda (Suggested).
IS&T Project Reviews September 9, 2004.
The Business Plan : Creating and Starting The Venture
Phase II Collimators : design status
Project Management Process Groups
SNS College of Engineering Coimbatore
DG Environment, Unit D.2 Marine Environment and Water Industry
Elettra – Sincrotrone Trieste S.C.p.A.
Operation of Target Safety System (TSS)
Test Beamline System Requirements and Charge to PDR Committee
Physics performances of baseline target design (Solution #5)
n_TOF Target #3 Production Readiness Review Introduction and Organization M. Calviani (EN-STI) n_TOF Target #3 Project.
Overview of the TARGET Monolith Rough Vacuum
Radiation Working Group RADWG
Comments on the North Experimental Area Consolidation Request Form
n_TOF Target #3 Baseline Design
Presentation transcript:

https://indico.cern.ch/event/807540/ n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF Target #3 Project Leader https://indico.cern.ch/event/807540/ 29th May 2019 EDMS 2158302

M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302 Outline Summary of Target #3 design solutions Path towards the definition of the Target baseline Intermediate Engineering Design Review and follow-up Challenges and decision to focus on N2-cooled sliced Pb target Engineering Design Document and Project Costs 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Summary of Target #3 design evolution Over the course of the Project history, 5 design solutions have been identified and studies with a certain degree of details Sol4 Ti64-contained Pb core, ext. Pb mass Sol5 sliced Pb core, N2 cooled Sol3 Ta-cladded W core, ext. Pb mass Sol1 Bare Pb core Sol2 Ti64-contained Pb core Pb W Pb Ti-Pb Pb Ti-6Al-4V Pb Pb Discarded after PDR Discarded after PDR Baseline at IEDR Later discarded Baseline at PRR Backup at IEDR 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Solution #2 (core and vessel) Solution 2: water-cooled Ti-6Al-4V-cladded Pb core (monolithic) Solution discarded due to physics (Be stiffener reducing flux in EAR1) and technological reasons (complex to maintain good thermal contact) 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Solution #4 (core and vessel) Solution 4: water-cooled Ti64-cladded Pb core, embedded in an “air” cooled external Pb mass for physics reasons Solution judged sound by IEDR reviewers but quite complex to implement technically with significant reliability risks Complex mechanical assembly, cantilever core, complex N2 circulation in external mass 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302 Solution #5 Solution 5: N2-cooled Pb sliced target Technologically innovative, but appears the most appealing from a physics as well as technological perspective Operational simplification: no high-Z contaminated H2O, no ion-exchangers, etc. 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

NEW Target options at IEDR Solution 4 Ti64-contained pure Pb, water cooled, contained in a N2-cooled mass Solution 5 N2-cooled pure Pb slices 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

IEDR analysis of recommendations and follow-up Reviewers have highlighted the excellent quality of the presentations and work done, feedback provided in EDMS 2000974 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Project decision post IEDR & path towards IDR “Avoid unnecessary complexity”  remove mechanical complexity from the target pit and eventually move it out Re-optimization on physics performances for the target, balancing requirements from n_TOF Collaboration on EAR1 and EAR2 Focus on “neutron/gamma background” rather than on increasing power on target Contrary to previous requirements, the baseline was changed to keep the current average protons on target – 1.7*1012 p/s , maximizing the pulse intensity if feasible No manpower and budget to follow more than 1 solution  need to baseline Dedicate resources on the study and development of a nitrogen cooling station adapted to the Project needs Push in order to execute HiRadMat beam tests of both Solution #4 and #5 (October 2018) and a timely PIE on Solution #5 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Project decision post IEDR & path towards IDR Taking into account all pertinent factors the Project decided to: Go ahead with the detailed design and assessment of open points on the nitrogen cooled sliced Pb target (Solution #5) – baseline target Simplification of mechanical complexity in the target pit (inaccessible after installation) Stopping further developments of Solution #4 (Ti64- cladded Pb) given the complexity of the assembly and technical requirements similar to those of Solution #5 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Solution #5 IEDR suggestions From the review document (EDMS 2000974): Further study and define anti-creep geometry [required] in order to improve cooling even in case Pb creeping leads to clogging Assess the target assembly rigidity to limit vibrations and their consequences Optimize the cooling system and parameters (N2 flow rate and velocity in critical regions) as trade-off between cooling efficiency and induced vibrations or pressure losses Take into account nitrogen chemistry risks Reduce photon and high energy neutron streaming to experimental areas by using an additional lead wedge or tilted anti-creep plates, as proposed immediately after the review 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Project decision post IEDR & path towards IDR From July 2018 to November 2018 all Project resources dedicated to address the open points of Solution #5 highlighted by the IEDR Project organized an Internal Design Review (IDR) on 6th November 2018 in order to check the status No showstopper identified, leading to the go ahead for the detailed studies of the (now) baseline design (Solution #5) 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

n_TOF Collaboration feedback Baseline target design was presented to the n_TOF Collaboration at the Board meeting on 29th November 2019 Proposal was endorsed by the Collaboration Board Collaboration however requested a separated moderator circuit (EAR1 vs. EAR2) V. Vlachoudis 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Engineering Design Document A detailed design document has been prepared in order to summarize the design choices, studies, simulation, prototyping and beam tests Coverage of most of the aspects discussed at this review TOF-TAR-ES-0003 (EDMS 2154581), linked to the INDICO page 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Information of Project costs The Target #3 Project is fully financed by Accelerator Consolidation Project (ACC-CONS) Originally foreseen budget (~2014) was around 600 kCHF Current the Project is financed for a total 1.7 MCHF (M+P) Excluding costs for additional moderator (covered by the Collaboration) & other beam line related aspects, which will be covered by the STI n_TOF operational budget TOF-PM-MG-0002 (EDMS 2143839) is detailing the different budget sources – all looks ok at the moment 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302 Focus of the PRR In the last 6 months, Solution #5 (N2-cooled sliced Pb target) has been thoroughly analyzed, addressing most of the recommendation and suggestions from IEDR/IDR as well as actions from Project meetings Extensive CFD, including optimization of anti-creep plates (R. Ximenes) Thermo-mechanical simulations with coupled & sensitivity studies (R. Esposito) Summary of target vibration studies by external partner (R. Esposito) Detailed studies of the N2-cooling station (F. Dragoni) Significant prototyping to address feasibility (& costs) (M. Timmins) Beam irradiation tests (R. Esposito) The Project believes that this is a mature solution and ready to be built and operated 22 May 2019 M. Calviani - n_TOF Target #3 PRR Introduction - EDMS 2158302

Thanks a lot