AEC SPF Working Group Small Work Group Content Areas

Slides:



Advertisements
Similar presentations
Ventura Community College, California Title V Basic Skills Grant ( ) Title V Transfer Velocity Grant ( ) Kathy Scott, Dean of Institutional.
Advertisements

IT Control Objectives for Sarbanes-Oxley Presented by Doug Moore, Jefferson Wells International and Christine Chaney, Continental Airlines.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Comparison Shopping. What are your spending habits? Think about the last item you purchased – Did you look at the product carefully, or consider other.
Innovative community based HIV counseling and testing models for identifying new HIV positive adults and children: a case of a countrywide program in.
ISERN Meeting Tuesday, October 10, 2000 Facilitators: Carolyn B. Seaman Reidar Conradi Qualitative Methods in Software Engineering Research.
Chapter 3 The Qualitative Research Approach. WHAT IS THE INTERPRETIVE WAY OF THINKING? Multiple Realities Data vs. Information Subjects vs. Research Participants.
DECISION MAKING. What Decision Making Is?  Decision making is the process of identifying problems and opportunities, developing alternative solutions,
STATISTICAL TECHNIQUES FOR research ROMMEL S. DE GRACIA ROMMEL S. DE GRACIA SEPS for PLANNING & RESEARCH SEPS for PLANNING & RESEARCH.
Uses of Safety Performance Functions and Potential for Safety Improvement Values David L. Piper, P.E. Illinois Department of Transportation.
Work Ready Communities Program Modification Recommendations Administration/Operations Criteria Modifications.
ProjectTime Mgmt ProjectScope Mgmt ProjectProcurementMgmt Project Risk Mgmt Project Cost Mgmt ProjectCommunicationsMgmt $ $ $ $
1. Prediction: to tell something before it happens 2. Hypothesis: a possible answer to a question based on gathered information.
AU- MAEL Dr. Dan Bertrand
LIFE CYCLE THINKING »DO NOT DESIGN PRODUCTS! INSTEAD, DESIGN PRODUCT CYCLES THAT ARE COMPATIBLE WITH SUSTAINABLE DEVELOPMENT.« (PRé Consultants) S10-A1:
© 2009 Delmar, Cengage Learning Chapter 5 Planning and Organizing an Agribusiness.
1 Probability of Program Success Component Standardization : Status Brief Ms. Jane Rathbun Special Assistant, Program Management Improvement OSD(AT&L)(A&T)(PSA)
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 11 Project Risk Management.
Project Management By: Dr Madhu Fernando Project Risk Management
Asset Management in Action: Use of a Triple Bottom Line Approach to Prioritize Capital Improvement Needs Richard Cuthbert R. W. Beck, Inc.
Dr. A.K.M. Saiful Majid Professor,IBA University of Dhaka.
© 2003 Pearson Education, Inc., publishing as Longman Publishers. 1 Chapter 17 Designing and Testing the Document for Usability Technical Communication,
Responding to Special Education Disproportionality Understanding your Data Presenters: Nancy Fuhrman & Dani Scott, DPI.
LEAGUE NAME FLAG-TEAM NAME LAST NAME, FIRST NAME DOB-(___/___/___) Jersey #_________ Weight__________ Certified on:________.
Module 3 Risk Analysis and its Components. Risk Analysis ● WTO SPS agreement puts emphasis on sound science ● Risk analysis = integrated mechanism to.
Identify a Health Problem Qualitative Quantitative Develop Program -theory -objectives -format -content Determine Evaluation -design -sampling -measures.
Addressing Cumulative Impacts of Pollution: A CEQA Perspective A Forum Presented by the Contra Costa County Hazardous Materials Commission December 4,
Chapter(3) Qualitative Risk Analysis. Risk Model.
Health Risk Assessments (HRA) Health Risk Assessments (HRA) Be proactive in managing your health! Identify individual risk factors and try to modify.
Background In , City Year Greater Philadelphia (CYGP) provided academic and behavioral supports for students in grades 6-9. Supports include one-on-one.
Management Science Helps analyze and solve organizational problems. It uses scientific and quantitative methods to set up models that are based on controllable.
1 Identify Preferred Alternative and Finalize Plan Planning Steps 7 & 8.
The Scientific Method. Parts of an Experiment Independent variable; Input, the manipulated variable. What the experimenter chooses to change Dependent.
KMIP Support for PGP Things to take out Things to put in.
Chapter 2 Doing Sociological Research. Chapter Outline The Research Process The Tools of Sociological Research Prediction, Sampling and Statistical Analysis.
1 46th Annual PAFPC Conference May 5, 2015 MARIA GARCIA Schoolwide Program Manager DIVISION OF FEDERAL PROGRAMS Title I Schoolwide Programs.
Quick Recap. Project Initiation overview Awareness of the need for change (situation, context) and recognition by stakeholders that only a project can.
The Project Plan Plan Your Work, then Work Your Plan
Program Development Session F-1 The Metropolitan Transportation Planning Process.
Data Driven Planning and Decision-making for Continuous School Improvement: Developing a Program Evaluation Plan Leadership for Innovative Omani Schools.
ME/MECA 238A1 ME/MECA 238A - Mechanical/Mechatronic Design Project I Course notes prepared by G.A. Kallio, based on The Mechanical Design Process, by D.G.
Early Childhood Feasibility Study Presented by Early Childhood Feasibility Committee Members Eileen F. Swan, parent Amy Lupoli, parent Alisa Ruggiero,
Adulthood Original Content Copyright by HOLT McDougal. Additions and changes to the original content are the responsibility of the instructor. Stages of.
Risk Assessment Techniques
Stakeholders’ Perspective on Integration Gabi Lombardo PhD Net4Society Advisory Board.
DIRECTED ADMINISTRATIVE PORTFOLIO MSA 698. DIRECTED ADMINISTRATIVE PORTFOLIO CAPSTONE ALTERNATIVE Credits: 3 16 weeks The course is centered on the development.
HIRING FOR CONSULTATION Marlon Murahwa. CONTENTS 1.Preamble 2.Service Description 3.Deliverables 4.Rates and Pricing 5.Consultation Process 6.Terms and.
Process and customizations
DIRECTED ADMINISTRATIVE PORTFOLIO
What Data Can Tell Us – and What It Can’t
Introduction to DESIGN AND THE DESIGN PROCESS
SCC Supplier Performance Management (SPM) Training
Capital Project / Infrastructure Renewal – Making the Business Case
Considerations for Students with Disabilities
Improvement Selection:
Assessment Cycle and Academic Effect
Level - 3 Process Areas (CMMI-DEV)
BSCOM 324 Education for Service--tutorialrank.com
1234: AEC SCHOOL | 1234: RESIDING DISTRICT
The Scientific Method Systematic study Method of verification
این دوره شامل: تعریف مذاکره کلمات کلیدی ورودی ها انواع مذاکره
Chapter 1: Introduction to Chemistry
Alternative Education Campus Accountability Work Group
بسم الله الرحمن الرحیم.
AP Government Exam Format
Do abstracts represent the article?
Scientific Method.
Collaboration Advisory
The Family Functioning Assessment: Investigation and Safety Planning
AP Exam – Section 1 (MC) Multiple Choice: 55 Questions | 1 Hour, 20 Minutes | 50% of Exam Quantitative Analysis: Analysis and application of quantitative-based.
Presentation transcript:

AEC SPF Working Group Small Work Group Content Areas Qualitative measures, in addition to quantitative measures of a school’s performance in serving high-risk students; Development of measure specific cut-points; Consideration of the current “N” weighting system and suggesting changes to weights to address the unique socio-emotional needs to the students served by the alternative education campus; Identification of possible methods and costs associated with using a comparison group to analyze hard data comparing high-risk students across schools; and Consideration of the ninety-five percent threshold for designation of an alternative education campus, the student groups included in the ninety-five percent threshold, and the documentation and verification requirements for certifying that the threshold has been met.