10 DAY PUBLIC NOTICE: Water Main

Slides:



Advertisements
Similar presentations
SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
Advertisements

Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Donna Speidel, President, Sightline Airport Marking Consultants Planning and Design for Airfield Markings March 3, th Annual Airports Conference.
Construction Noise Control « Noise Control Ordinance » (Chapter 400)
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
Construction Noise.
Industrial Acoustic Sound Enclosures FanAir Company designs and builds Acoustic Sound Enclosures Engineered to each specific application to control noise.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Parsons Brinckerhoff (PB) Erich Thalheimer, INCE Bd. Cert. New York City Department of Environmental Protection (NYC DEP) Charles.
Contractor Management
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
13 th SEPTEMBER 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Mansfield Gas Well Awareness Urban Gas Development 101: What you need to know...
1 Automotive industry Reducing Noise Emissions from Motor Vehicles: New EU Commission legislative proposal World Forum on Vehicle Regulations (WP.29) 156.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Leona Heights Sulfur Mine & Creek Cleanup
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Maintenance and Temporary Traffic Control
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
Second Street Closure for Construction of B21 1/16/16 – 1/31/16.
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
IMPLEMENTATION OF NOISE RULES, ZONING AND NOISE MONITORING NETWORK Item No. 4.0.
Welcome to Van's Electric Inc! Welcome to Vans Electric, Inc. We have been proudly serving the local area for 12 years and we are excited to work with.
Nyc Build it back RFB Furnishing All Labor and Material Necessary and Required for residential construction services July 24, 2017.
SPRINGBANK AIRPORT COMMUNITY NOISE CONSULTATIVE COMMITTEE May 30, 2017
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
City of San Jacinto 7th Street Pavement Repairs
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Contractor Submissions
June 5, 2017.
District-Wide Well Maintenance, Rehabilitation, and Repair
The Oakton Condominium Association September 12, 2017
City of Bloomfield Hills
NORTH TRUNK SEWER REPLACEMENT PROJECT
IA 122 RECONSTRUCTION PRE-BID MEETING
City of Los Angeles Department of Public Works
Reach 4 Air Valve Replacements Award of Construction Contracts
WHAT DOES A DISTRIBUTOR MEAN FOR YOUR AREA?
I-94 Maple Grove to Rogers Community Noise Engagement Meeting #1
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
College West Residence Renewal Project
Appeal Conditional Use Permit #6116 McKinley School 325 South Oak Knoll Avenue City Council February 29, 2016.
Town of Westport pLANNING bOARD SUBDIVISION RULES AND REGULATIONS
2013 RTS Campus Improvement Project
OHWARN Workshop Disruption of Service Rule Update
Treatment – Ultraviolet (UV)
Drought Rate Study Continued from May 19, 2015
Lincoln Common Redevelopment Construction Update.
Village of Shorewood Snow and De-icing Plan
Galt Court Water Main Replacement
HERO UNIT Training Module
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
City of Bayport Flood Public Information Meeting
MS4 OVERVIEW 2015.
  What Happened While trimming a piece of wood using electrical wood saw, the carpenter’s left hand came into contact with the saw blade resulting in.
City Council Meeting November 14, 2016
Swimming Pool Schedule
Eric M. Reimschiissel Contractors working with Agencies
Utility Relocation: 11th/Mill
Rural Transit Stop Design Guidelines Prof Omer maaitah
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

10 DAY PUBLIC NOTICE: Water Main July 12, 2019 10 DAY PUBLIC NOTICE: Water Main Replacement Project – Leavenworth Street What: San Francisco Public Works will begin installation of a new water storage and distribution system within UN Plaza. This project will install a new filtration system, piping, and electrical equipment to use groundwater for street cleaning and other purposes. Due to the heavy pedestrian traffic during the day, and to allow the Farmers Market to continue through construction, the work will take place at Night between the hours of 5:30PM and 2:30AM. When: July 29, 2019 to September 30, 2019. Weather and/or construction issues may impact the schedule. Who: Anvil Builders is the Contractor. Public Works will manage construction. Workdays & Hours: Monday - Saturday 5:30 p.m. - 2:30 a.m. Contacts: Grace Moore grace.moore@sfdpw.org (415) 558-5282 Jordan Kiely (415) 314-1451 For additional project information or to sign up for construction updates go to: www.sfpublicworks.org/UNPlaza or call (415) 558-5282 Mitigation Measures that the contractor will perform to reduce or mitigate night noise Anvil Builders Inc (ABI) will conduct all operations, use appropriate construction methods and equipment in accordance with the San Francisco Noise Ordinance. In the event that noise levels are higher than the allowable dBA ABI will furnish and install acoustical barriers as necessary so that noise emanating from any equipment shall not exceed noise levels of the criteria specified in the San Francisco Noise Ordinance. At minimum ABI shall: In the event noise exceeds the noise criteria, ABI will exhaust all options to mitigate the work activities that are exceeding the allowable dBA levels and consult with City of San Francisco enforcement. Use acoustical treatments that will be most effective to mitigate the noise. Provide equipment and trucks used for project construction equipped with the best available noise control techniques to minimize construction noise impacts. Prior to construction, ensure that its equipment noise does not exceed the requirements of the San Francisco Noise Ordinance. Muffle and shield intakes and exhausts, shroud or shield impact tools, and use electric-powered rather than diesel-powered construction equipment, as feasible, so that noise will not exceed limits stated in the San Francisco Noise Ordinance. Enclose equipment such as large compressors, generators, and large de-watering pumps at a minimum in one-inch-thickness plywood sheds. Impact tools will be equipped with intake and exhaust mufflers. Pavement breakers and jackhammers will be equipped with acoustically attenuating shield or shrouds. Use designated haul routes that minimize intrusion to residential areas. Use construction processes and techniques that create the lowest noise levels. Monitor construction noise for the beginning stages of site work to insure that work activities noise levels to do not exceed the noise limits pursuant to the San Francisco Noise Ordinance.