WT CALL – 26/9/2017 2017-09-26.

Slides:



Advertisements
Similar presentations
BWA/GE ALL FACES PROGRAM Program Update for Collaborating Organizations September 13, :00 pm EST.
Advertisements

BUDGET PROCESS Stephanie Curry / Donna Berry. THANK YOU! For your participation in the Budget Process Pilot.
Numbers
Omniran TG 1 IEEE OmniRAN TG Status Report to IEEE 802 WGs
Task-Force 1 Softwarization of Networks ICT COST Action IC1304 Autonomous Control for a Reliable Internet of Services (ACROSS)
WEEK 1 You have 10 seconds to name…
Microwave Radio Link YANG Data Model draft-ahlberg-ccamp-microwave-radio-link-00 IETF 95 - Buenos Aires – CCAMP WG Jonas Ahlberg (Ericsson)
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
BIS 219 Week 1 Individual Information Systems and Organizational Departments Check this A+ tutorial guideline at 219/BIS-219-Week-1-Individual-Information-
BIS 220 Week 2 Individual Information Systems Proposal Check this A+ tutorial guideline at 220/BIS-220-Week-2-Individual-Information-
BIS 220 Week 4 Learning Team Wireless Technologies Proposal Check this A+ tutorial guideline at 220/BIS-220-Week-4-Learning-Team-
BSA 385 Week 3 DQ 1 User Interface delineations are a key aspect of the Physical Model design description of your proposed system solution. Discuss the.
Master Service Orchestrator (MSO)
Open Transport Config and Control Project Agenda and Notes
Automation Technologies SCADA SENSORS HMI
WT CALL – 04/10/
Welcome to Curriculum Night at IMS
ONAP and SD-WAN Integration Proposal
ONAP Interface to External Controllers
Maintenance Component of the Regional Aviation Safety
a week-by-week Bible study for 2017 week 6: Romans 2:1-11
Ethernet PHY Information Model Clarification at OT IM
Visitor Registration Pass Charles Boone & David Kritz
Multi-VIM/Cloud High Level Architecture
Open Transport Config and Control Project Agenda and Notes
Open Transport WG Agenda and Notes
Open Transport Config and Control Project Agenda and Notes
Enterprise vCPE use case requirement
2nd Plugfest Kickoff July 18, 2016.
Enterprise vCPE use case requirement
Purposeful Planned Implementation
Open Source Access Manager™ ONAP Proposal
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
IETF #99 Broadband Forum (BBF) YANG Update
Documenting ONAP components (functional)
No School Nov. 20 – 24. Happy Thanksgiving!
مدیریت استراتژیک منابع انسانی
Monday Saturday Tuesday Sunday Wednesday Notes Thursday Friday
Procure to Pay Project EUAT Weekly Communication and Training Meeting
Demo Loan Community of Practice: Update
ONAP Architecture for Rel 1
THANK YOU!.
Unit II - Subtitle.
Weekly Calendar - Landscape
IEEE Fast Initial Authentication Study Group Closing Report
Thank you.
Thank you.
Monday Tuesday Weekly calendar
Homework Week of January 7th UNIT TEST TODAY! Monday Tuesday Wednesday
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Welcome to Training at LAL
My School Days The first day back is Wednesday.
Time 1.
Week of October 28- November 1, 2013
WT CALL – 31/01/
CURRENT CHALLENGES IN HR in the Commission and Eurostat
Experience-Based Learning
Conclusions…. and the future
WT INTEGRATION IN BROADER ARCHITECTURE - for discussion -
YANG Data Model for FlexE Interface Management
Extending and Refining the OTCC/OIMT Models
Welcome to Ms. Keegan’s 6th Grade English Language Arts Class!
ONAP Optimization Framework (OOF) POC for Physical CellID (PCI) Optimization July 30, 2018.
Device Management Profile and Requirements
Introduction to Models, Interfaces, Guidelines & Tooling from ONF Open Information Model & Tooling (OIMT) project and ONF Open Transport Configuration.
Casablanca Platform Enhancements to Support 5G Use Case Summary of Planned Enhancement Areas 5G Use Case Team May 10, 2018.
WT Activities F2F meeting London, March 2018.
Presentation transcript:

WT CALL – 26/9/2017 2017-09-26

AGENDA Administrative and organizational Model PoC 4.1

ADMINISTRATIVE AND ORGANIZATIONAL Yesterday OTCC bi-weekly meeting Uberconference will be abandoned ... Proposal to move WT weekly call to WEDNESDAY (3PM CET) in order to allow participation to OTIM (2PM CET) and TAPI (3PM CET) on Tuesday. Proposal to discuss model aspects in alternate weeks: Ethernet model in OTIM MW model in WT call Calendar: Week 39: Ethernet model in OTIM Week 40: MW model in WT Week 41: Ethernet model in OTIM Week 42: MW model in WT

MODEL Feedbacks from OTIM discussion on Ethernet PHY model (Thorsten).

PoC 4.1

PoC 4.1

SUM-UP Reference interface Interface extensions requested Extensions in other components Extensions in SDN WT controller equipment and inventory AAI Not on southbound (equipment model to be implemented) no Adapter between ONF equipment model and AAI alarms DCAE Adapter between ONF model and DCAE upload of configuration ?? configuration statistics

THANK YOU