EA Equipment for East Area Renovation

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

The PPAC neutron monitoring for EAR2 L. Tassan-Got, L. Audouin, C. Le Naour, C.O. Bacri CACAO, NEEDS IPN Orsay-France I. Duran, E. Leal, E. Casarejos (UVigo)
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Muon analysis – PS and SPS data Started May 21, 2012.
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
SYSTEMS ANALYSIS FORM 4 Included in this topic: Information Systems Systems Analysts System Life Cycle (incl. Case Study) Documentation.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
DBMS USERS.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Compressor status AWAKE Technical Board meeting 19 August 2015.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Next Steps, Priorities, Strategy for Spares Ray Veness.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Summary of RIKEN visit. Chamber Top plate Bottom plate Middle cylinder.
News and hot topics Impedance meeting 14/04/2014.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Spanggaard BE-BI(1)RadWG Meeting 6/ Multi-Wire Proportional Chamber and Gas Electron Multiplier Electronics in TT83 Radiation issues.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Wim Weterings Remy Noulibos
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Crab Cavity Technical Coordination meeting:
LBNF CAD models, Drawings and Component list
EHN 1 CO2 Leaks inside the beam lines
new straw end plug: D=10.6 mm straws support frame Levan option
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
Cryostat procurement, status and plan, QA/QC
News about the WA104 Programme
LINAC4 50 MeV phase BIS STATUS
AWAKE proposals for BE/BI
Layout Drawings and Mechanical Assembly Drawings
1. Open any Office 2016 app, such as Word, and create a new document.
Status of the BI Work Package in the LIU-PSB frame
Diffuser status October 2017
WPs concerned by L4 connection:
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
East Hall under construction
Beam Gas Ionization Monitor (BGI)
GIS Portal Racks Project
SNS PPU Cryomodule Instrumentation
Experimental Areas – LS2 planning
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
ISRC and LEBT Vacuum System Design
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Global Overview EA Deliverables for East Area Renovation
EA Deliverable Equipment for East Area Renovation
MAPUTO PORT DEVELOPMENT COMPANY IT Projects Update Order to Cash - Completion of system development - User Training - Go Live (July 2018) - Post.
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
EA Magnets Supports for East Area Renovation
East Hall under construction
East Area Renovation Supply of control rooms b.157
Radiation Working Group RADWG
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
EN-EA Magnets Supports Overview (for East Area Renovation)
Status of the BI Work Package in the LIU-PSB frame
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

EA Equipment for East Area Renovation Giulia

Equipment and Supports Code Description Quantity and Location Production Readiness XCET Cerenkov Counters 2 on T09 2 on T10 3D design on going XTCX Fixed collimator 1 on T09 3D design done, 2D drawings on going HTCAA Support XTCX 1 XCSV Collimator 2 blocs Vertical 2 on T10 1 on T11 2 On stock + 1 NEW XCHV Collimator 4 blocks 3 on T09 1 on T10 On stock but complete renovation to be done UNI Supports Collimators 7 ? XCON Absorber/converter 2 on T09 1 on T10 3D model to be done XSCI Scintillator 2 on T09 (XSCI) 1 on T10 (XSCI) 1 on T11 (XSCI) Given from BI HLGAC Support absorber/converter (MAUVE) Available on stock for installation XWCM Multi wire proportional chamber 1 on T08 installed HXWCM Support XWCM XION Ionization Chamber Installed HXION Support XION BXBPF Beam profile monitor for experimental areas (VESSEL) 2 on T09 1 on T10 1 on T11 3D/2D design done, production on going Support BXBPF 4 Recovered from AD Support BTV 5 Recovered ready for installation HBCTB Support beam current transformer BCTF 1 on F61 HBLSD Support Spill mesurement LSD HXSEC Support XSEC 1 on F62 1 on F63 2 on T08 5 July 2019 EA Equipment Review

Cerenkov Counters - XCET 2 on T09 2 on T10 3D design on going Documents circulating under approval: - EDMS 2192779 Engineering Specification of the Cherenkov Counters of the Experimental Areas - EDMS 2114239 User Requirements for XCET Detectors after LS2 EAST AREA: 4 XCET to be produced 4 bodies with supports already available Windows standards taken from NP validated design Procurement of mirrows? (recover the existing ones?) Control Panel to be done Complete assembly with body chambers and windows to be done Pressure test from HSE to be done 5 July 2019 EA Equipment Review

XCON and XSCI XCON: thickness and material decided Absorber/converter 2 on T09 1 on T10 3D model to be done XSCI Scintillator 2 on T09 (XSCI) 1 on T10 (XSCI) 1 on T11 (XSCI) from BI HLGAC Support absorber/converter (MAUVE) 7 4 recovered from T09 and T10 3 on stock XCON: thickness and material decided  3D design to be  Control SMM Second XSCI on T10 requested by BI Integration updated 5 July 2019 EA Equipment Review

Wire and Ionization Chambers XWCM Multi wire proportional chamber 1 on T08 installed HXWCM Support XWCM XION Ionization Chamber Installed HXION Support XION Already installed, no modifications Gas supply for XWCM on T08 to be redone Second XION to be installed in T08? 5 July 2019 EA Equipment Review

Beam Profile Monitors - XBPF BXBPF Beam profile monitor for experimental areas (VESSEL) 2 on T09 1 on T10 1 on T11 3D/2D design done, production on going UNI Support BXBPF 4 Taken from AD 3D model ready 2D drawigns ready Production 4 vessels to be done with external company Assembly chez nous 2 windows + 2 flanges for device to be procured? (EA-VIDE) Interface with adjusting base to be produced (angle regulation) Support UNI + adjusting table recovered from AD 5 July 2019 EA Equipment Review

Supports Recoverd as they are (stocked @ CHARM), ready to be installed ? Support BTV 5 Recovered ready for installation HBCTB Support beam current transformer BCTF 1 on F61 HBLSD Support Spill mesurement LSD HXSEC Support XSEC 1 on F62 1 on F63 2 on T08 Recoverd as they are (stocked @ CHARM), ready to be installed (BTV names to be checked) BCT recovered from linac 2 (BI resposible) with already flanges On F62 BTV support name PSZBTVMC0028 5 July 2019 EA Equipment Review

Thank you!