Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC Beam Operations Past, Present and Future Maria Kuhn on behalf of the LHC team Moriond QCD 2013.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
1 Possible Vacuum Issue V. Baglin CERN TE-VSC, Geneva Vincent Baglin Preliminary Meeting on Interface 11 T – Cold Collimation - 5 October LHC present.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Beam induced heating assessment on LHC beam screens Arcs + DSs + ITs L. Tavian LBOC, 27 September 2011.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
TE-VSC Group J.M. Jimenez Installation (temporary) in the RP Bunkers (UJs)
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
Production running 1 pb-1Lost to Mon h2062e32EOF studies Tue h17.152e32UFO Q8.L5 Tue h e32OP request Thu h e32OP.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
First collisions in LHC
Electron Cloud Effects
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
LHC schedule.
Some Vacuum Related Diagnostics of High Energy Particles Accelerators
Some Thoughts About Possible Measurements with SR at DaFne
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
Long Shutdown for the LHC: Vacuum Beam Pipes
BD meets VC&S at KIT, Karlsruhe, 8-10 March , 2017
Electron cloud & vacuum pressure observations: 2011 proton run
Accelerator System - Vacuum
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
CSP Meeting CERN CERN Accelerators in th November 2010
Scrubbing progress - 10/12/2012
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
LHC Morning Meeting - G. Arduini
LHC Beam Operations Past, Present and Future
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Summary first Scrubbing test 31/10/2010
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Collective effects in the SPS and LHC (longitudinal plane)
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Another Immortal Fill….
Saturday 6th October 05:38 STABLE BEAMS # :06 OP dump
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Vacuum Modules in LHC Experiments V. Baglin (26/3/12)
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato, J-M. Jimenez, G. Lanza CERN TE-VSC, Geneva On behalf of TE-VSC LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1459 – 31th October 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains Pressure up to 2e-8 mbar LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1459 – 31th October 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains Pressure increases due to ecloud in the 1e-9 mbar region SR at ~ 2 TeV LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1459 – 31th October 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains Pressure 4e-9 mbar SR at ~ 2 TeV LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1459 – 31th October 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains SR at ~ 2 TeV LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1459 – 31th October 50ns_109b_12_90_12bpi10inj - Trains well separated i.e. no discussion between trains Electron cloud stimulated pressure increases in the kicker intermodule up to 4e-9 mbar SR at ~ 2 TeV LHC beam commissioning 20 nov 2010

After scrubbing and MDs of Wk44 and Wk46 LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1500 – 19th November Pressure increases at VGI in A4L1 But remains lower than 7E-10 mbar SR at ~ 2 TeV Bunch length increases Bunch length decreases during ramp Up to 1 TeV LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1500 – 19th November Only SR desorption in LSS2 in LSS3&5 In LSS6&7 LHC beam commissioning 20 nov 2010

LHC beam commissioning 20 nov 2010 Fill 1500 – 19th November Some activity in MKIR8 intermodule stimulated by ramp and SR Start ramp, pressure increase starting from ~ 550 GeV (19:36) But flattens at 800– 1000 GeV (19:40) SR at ~ 2 TeV Bunch length decreases during ramp Up to 1 TeV Bunch length increases LHC beam commissioning 20 nov 2010

B1=444 Bunches – B2= 60 Bunches – 50ns Fill 1502 B1=444 Bunches – B2= 60 Bunches – 50ns ATLAS 4E-8 mbar LHC beam commissioning 20 nov 2010

B1=444 Bunches – B2= 60 Bunches – 50ns Fill 1502 B1=444 Bunches – B2= 60 Bunches – 50ns ALICE 8E-8 mbar LHC beam commissioning 20 nov 2010

B1=444 Bunches – B2= 60 Bunches – 50ns Fill 1502 B1=444 Bunches – B2= 60 Bunches – 50ns CMS 3E-8 mbar LHC beam commissioning 20 nov 2010

B1=444 Bunches – B2= 60 Bunches – 50ns Fill 1502 B1=444 Bunches – B2= 60 Bunches – 50ns LHCb 1E-7 mbar LHC beam commissioning 20 nov 2010

B1=444 Bunches – B2= 60 Bunches – 50ns Fill 1502 B1=444 Bunches – B2= 60 Bunches – 50ns Highest Pressure on LSS3 and LSS6 1E-6 mbar LHC beam commissioning 20 nov 2010