Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010.

Slides:



Advertisements
Similar presentations
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Advertisements

Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Preliminary Resource Adequacy Assessment for the 2017 Pacific Northwest Power Supply NW Resource Adequacy Forum Technical Committee Meeting August 16 th.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Resource Adequacy Forum 2019 Adequacy Assessment Overview PNGC Offices June 28, 2013.
IMO 18-Month Outlook Presentation to the F&ASC June 25, 2003.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
June Jandil Meeting June 2012 Power Committee and Council Meeting Regional Technical Forum Membership
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Eric King/ Mary Johannis PNW Resource Adequacy Technical Committee.
Resource Adequacy Steering Committee Meeting October 4, 2011.
The Solar System and Beyond The Moon. Gravity also keeps the moon in orbit around the Earth. The moon orbits the Earth every… …month (28 days)
Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Interim and Long-term Approaches for Assessing Wind’s Contribution to Capacity Adequacy PNW Resource Adequacy Steering Committee Meeting July 21, 2008.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
Wind Power Capacity Assessment Mary Johannis, BPA, representing Northwest Resource Adequacy Forum Northwest Wind Integration Forum Technical Working Group.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
2010 Work Plan Steering Committee January 29, 2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
Developing Synthetic Temperature-Correlated Wind Generation Data Steering Committee Meeting January 29, 2010.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Modeling the Hydroelectric System in GENESYS Resource Adequacy Forum Technical Committee Meeting July 25, 2007.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
TAS Follow-up Webinar Historical Year Energy Shape Compromise for 2026 Common Case December 14, 2015 Jim Filippi- TAS Chair Tom Miller- TAS Vice Chair.
Hydro Modeling Improvement for TAS Approval May 4, 2017
Demand Response in the 7th Power Plan
Forecast Comparison SUFG vs. Module E
Jamie Austin, PacifiCorp
ISO New England Net Load Analysis with High Penetration Distributed PV
Vetting the GENESYS Model
Out of Region Market Assumptions
Demand resource emergency energy measurement and verification
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Market Design in New England
Load Shape Analysis – IRM 2008
Hydro Modeling Improvement for TAS Approval May 4, 2017
GENESYS Current Functionality
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
Jamie Austin, PacifiCorp
2021 Adequacy Assessment Status Report
Technical Committee Meeting March 18, 2016
Steering Committee Webinar March 25, 2016
Resource Adequacy Steering Committee Meeting October 4, 2011
Resource Adequacy Technical Committee Meeting April 22, 2010
Base on maximum operating wind capacity at end of planning period
Presentation transcript:

Simulated vs. Real Hourly Dispatch Resource Adequacy Forum Technical Committee Meeting October 1, 2010

Historic Resource Dispatch (BPA Balancing Area) October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Historic Resource Dispatch (BPA Balancing Area) October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Simulated Regional Resource Dispatch October 1, 2010

Historic Resource Dispatch (BPA Balancing Area) October 1, 2010

Historic Resource Dispatch (BPA Balancing Area) October 1, 2010

A Few Observations Thermal dispatch is situational and can vary substantially by month Difficult to make direct comparisons Could conclude that thermal is base loaded in winter, displaced in June, and used for peaking in summer Overall there doesn’t appear to be anything in the simulated dispatch that stands out as being non-representative of real operations October 1, 2010