WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)

Slides:



Advertisements
Similar presentations
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Advertisements

Update on Q1 TAS REGION (18 to 22m), layouts. D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Technical Support Activities in PH-ADO-PO
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LHC-YETS Coordination meeting #9 24 th November, 2015.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Survey on “Chargés de Consignation” Status Update
SPS-FIRE The SPS Fire Safety Project Planning Status
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Status, Schedule and EVM for the test facility project
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
Identification of the unused cables
VENTILATION OF AD TARGET Kick off meeting
BE-ICS Activities during the LS2 Period (15 min)
Equipment simplified model SMR UR safety
CSP 25th November 2010 Technical agreement number 3: overview
EYETS LHC 2016/2017 Works EN/EL/CF
Collaboration meeting 26 to 28 June 2017
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
SHORT LHC-TS Coordination meeting #1
SPS cryogenic proximity equipment and SM18 validation
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
EHN1: CE Integration process updating
De-cabling strategy during YETS
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
LHC Civil Engineering Activities for YETS – LS2
Accelerator and Experiment Interface Session: LS2, LS3
Diffuser status October 2017
B245 Modifications & Cabling Update
SR1 cleanroom extension
CRG activities for EYETS 2016
JTT Shielding modification 13/10/2015
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS PS + PS SWY + TT2 Facility Coordinator:
Status with crucial LSS5 kicker transmission line cables
East Hall under construction
BE-ICS work for SPS Safety Systems
X-ray Pump-Probe Instrument
BLM planning 24/02/2014.
BLM planning 03/03/2014.
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
Technical Stop #4 29th August - 2nd September 2011
LS1 status 17/03/2014.
Experimental Areas – LS2 planning
Budget: ,00 € (90% Commission contribution)
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
LIU-SPS review for BI (no BWS)
LINAC 3 Meeting ICL machines Injectors
HL-LHC - WP15 modifications Coffrets Prise C4L8
East Area Renovation Supply of control rooms b.157
FASER LS2 work coordination meeting
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
SPS Planning meeting for LS2 #26 Vacuum sectors status
eSPS 2nd CDR meeting – 17th June 2019
Presentation transcript:

WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE) Liam Dougherty (EN-ACE-INT) 06 June 2019 FASER LS2 work coordination meeting

Work done from 17 May to 6 June The cable tray in UJ12 was successfully lowered (Great work from Maria and Yann  THANKS!!!) SAS contract signed (Aymeric) EN-EL-EIC investigation of HV cable in UJ12 and proposal for the lighting and power arrangement in TI12 (Yann and Cedric). Tbc by EN/HE Gangway manufactured with HSE modifications, (Liam, Michel, Marco) planned to be installed on the 1st of July Currently in the process of updating the layout database with the new positions of the FIP boxes, to be completed by September (Liam, Anne-Laure) EDMS structure created (Claudio) WP1, FASER LS2 coordination meeting 06 June 2019

UJ12 Cable Tray

Planning consolidation BASELINE: avoid coactivity SAS installation date advanced Proposal: Start EN-HE 8 july (agreed with Caterina). 8/7: occupation du tunnel pendant toute la journée en heures ouvrables Clarified (Marzia/Caterina): the passage in UJ12 is not interrupted but perturbed. This means that the evacuation must be possible at any moment; the activity will appear in any case as constraint. Proposal start CV work on the 15th or the 22nd of July >1 month contingency WP1, FASER LS2 coordination meeting 06 June 2019

WP1, FASER LS2 coordination meeting 06 June 2019 Planning V1 BASELINE: avoid coactivity Please, confirm dates WP1, FASER LS2 coordination meeting 06 June 2019

WP1, FASER LS2 coordination meeting 06 June 2019 To do Confirm if anchor bolts required for the middle support legs of the QRL protection ? (Ideally no drilling because of HV cable in the floor) ECR WP1- Dismantling activities in UJ12/TI12 for FASER WP1, FASER LS2 coordination meeting 06 June 2019

WP1, FASER LS2 coordination meeting 06 June 2019 To do Integration FASER/ LS2 schedules (DISMAC ok?) Preparation VIC for EN/HE hoist installation (Jean-Pierre (?)). Continue integration, work preparation, etc… WP1, FASER LS2 coordination meeting 06 June 2019