Open Days 2019 focus on underground visits sites

Slides:



Advertisements
Similar presentations
Safety at CERN La sécurité au CERN
Advertisements

SAFETY SERVICES PROVISION I. Bejar Alonso. Transition SC to Service Provider – From 1 st January Mechanical Inspections Pressure Lifting Safety valves.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Before Training Avant la formation. 1 What do trainees bring with them to training events? Quest-ce que les personnes en formation apportent au stage.
Christoph BALLE, Safety Training CERN Induction Programme Safety at CERN La sécurité au CERN.
16/09/ Open Day at CERN 16/10/04 The Open Day working group Activities General access rules Visitors flow Safety measures of the visit points Active.
Christoph BALLE Safety Training Safety at CERN La sécurité au CERN.
LS1C 15 Mar 2013 AB Technical Coordination CMS Safety, LS1 Proposed Evacuation exercise in USC55/UXC55 Austin BALL – CMS Technical Coordination Safety.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Muon Piquet Training. Intro - Disclaimer  This presentation is not intended to be a complete description of the system but a guide, possibly simple,
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
DGS/SEE Flammable Gas Safety – an update. DGS/SEE New Chemical Safety Rules New SR-C, Chemical Agents. GSI-C1, Prevention and Protection.
MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
GS Annual Training plan D. Klem Big picture D. Klem 2 Purpose of Training has twofolds As defined in the SR&R :(SII 3.01) ‘The purpose of training.
Report on the meetings in 2013 PH TSO Annual meeting 2 PH TSO Annual meeting - N. Dupont.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
1 29 June 2011EDMS CERN Greenhouse Gas Inventory – Detector Cooling 1.Background; 2.Status on regulatory requirements; 3.Inventory carried out.
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI.
ATLAS Open Days Guides Safety Training. 1. Generalities: Name and phone number of the person responsible for the ATLAS visit point: Site manager: B. Di.
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire R. Trant HSE Unit for ACCU Meeting R. Trant.
Optical Fibres for the LHC Machine and Experimental Areas Optical Fibre Meeting 3 October 2002 Luit Koert de Jonge/ST-EL-OF.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
News – Safety Training & Awareness 1 Welcome to Marion THYES! Marion is in charge of 3 courses Self Rescue Mask Fire Extinguisher Radiation Protection.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Safety in LS1 Thomas Otto, TE DSO.
Radiation Protection computing tools Gérald Dumont HSE/RP.
1.Definition 2.Examples 3.Hazards 4.Signage 5.Rule and permit 6.The role of the TSO HSE Unit - Olivier Prouteau CONFINED SPACES Updated in January.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Christoph BALLE Safety Training Safety at CERN La sécurité au CERN.
FCC Week April 2016 Rome FCC collaboration “fire safety” S. La Mendola and M. Plagge HSE/SEE/XP R. Trant TE/HDO 14/04/
Safety at CERN La sécurité au CERN. ➊ Occupational Health & Safety Santé et sécurité au travail ➌ Safety of Equipment and Installations Sécurité des équipements.
The Georgia Tech Safety & Health Consultation Program presents 2016 Safety & Health Free Seminar Series Did you know that Georgia Tech has a free Safety.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety at CERN La Sécurité au CERN
SMB Service Status 113th ACCU Meeting
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
‘Open Bank!’ - A co-creation platform for a more flexible IT Infrastructure and to boost innovation - ESBG International Summer Forum Mladen Sančanin.
On behalf of the Safety Unit,
Some arrangements for personnel safety 1- Procedures for access
TETRA (CERN’s Safety Radio Communication Network)
CERN Mobile network migration
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Safety Issues (TF, June 15, 2005)
HSE rules & regulations
ATLAS Safety EP-ADO Meeting EDMS: 11 July 2017.
CERN’s Rules & Regulations
Logistics update 01 September Logistics update 01 September 2016.
The TSO function (Territorial Safety Officer)
On behalf of the Safety Unit,
Inventory for the non-radioactive waste
Health and safety organization on construction site
Safety rules for works supervisors
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
UCOP Emergency Building Evacuation 415 – 20th Street
OSHA – 10 hour Certification
Helen Boyer OHS group leader
WP 2 Update Fire Detection and Extinguishing FCC Collaboration
Parental and Community Involvement
FCC study – Fire collaboration WP4 Status & Update
Safety & Security Mukilteo School District
Nicoletta Garelli & Gérard Cumer Coordination meeting #1 10th May 2019
Meriem Chniba (HSE), Ana Godinho (IR)
Presentation transcript:

Safety @ Open Days 2019 focus on underground visits sites Feed back from the ED

Safety strategy 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Preventive measures Electrical « Lock-out »(1) Try to keep only “Service Généraux” Secure UPS as much as possible Cryo « Lock-out » (all gas in general as much as possible)(1) Reduce storage as much as possible(2) Safety signage: from the web to the LHC Visitor pathways secure(2) (1) TIOC 03/04, G. Cumer – (2) Underground safety visits 30/04 - 05/06 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Radiation Protection Memo RP “Radiation Protection requirements for Open Days 2019 visits in Radiation Areas” EDMS: 2110782/2 Date: 29.03.2019 Point 4 : the emergency exit through Point 3 validated. Radiation protection general information will be presented during the information sessions for the volunteers A handout will be sent (before the sessions) to the site managers (if needed) with the information concerning what to do Before the OD, During the OD, After the OD from the RP point of view On validation IMPACT process to monitor CERN guide’s dose : pilot test with ATLAS > OK (04.07.2019) Create all the IMPACTs : 05.07.2019 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Underground capacity 23/01/2019: Proposal of LHC underground visit WP Leaders reproduce OD2013 and LS1 condition (limitation of 3 per/m2 in safe zones) from the study “LHC Evacuation Assessment for LS1”, EDMS 1246565 29/01/2019: Author of the study explain why it can not be extrapolated for OD2019 Public vs. workers, training, crowd management conditions (groups, distances, …) 22/02/2019: HSE proposes a different approach based on good practice in tunnel (with limitation of 2 per/m2 in safe zones) 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Underground capacity New approach: Based on CETU(1) recommendation from «note d’information du CETU n°8 de novembre 1997 relative aux abris dans les tunnels routiers (§5 règlementation).» Un abri est un local sûr, isolé du feu et ventilé, dans lequel les usagers ont la possibilité d'être en communication avec les agents de surveillance jusqu'à ce que la situation soit maîtrisée et que les équipes d'intervention puissent les évacuer (…)” Surface - Capacité d'accueil : Pour un taux d'occupation de 2 personnes au mètre carré, un abri d'une surface de 50 m2peut accueillir 100 personnes. (…) On vérifie que l'abri peut contenir les usagers des véhicules arrêtés sur une file (160 véhicules par kilomètre) sur 400m à raison de1,3 personne en moyenne par véhicule. Ceci est le cas des véhicules bloqués dans un tunnel à un seul tube à deux voies, avec un trafic bidirectionnel. Les usagers qui se trouvent en aval de l'incendie sont censés pouvoir sortir en voiture.  (1): “Centre d’Etude des Tunnels”, http://www.cetu.developpement-durable.gouv.fr 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Underground capacity First theoretical impact prepared in February 2019: 1092 visits per hour to 996 visits: -8,7% Main impact ALICE 240 to 204, CMS 300 to 240. 05/11/2019 ED – Safety @ Open days 2019

CMS Safe zone SDX5 W2 64 m2 18 m2 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Underground capacity 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Underground capacity Vist/h Vist/2d 3 pers/m2 1 026 20 520 2 pers/m2 1 005 20 100 Differential 2% 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Technical support (for LHC part) « Piquet Ascenseur » physically on each LHC site « Piquet Ventilation » physically on each LHC site « Piquet Electrique » physically on each LHC site « Piquet RP » physically on several LHC sites LEXGLIMOS (or deputy) physically on LHC site Dedicated TI operator for OD Coordination centre (160) Specific TETRA network in collaboration with IT 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Emergency support First-aid point with FB and hosts state support 41 Fire-fighters form CERN 44 Fire-fighters / Paramedic form hosts states Underground guides and Crowed-Marshal trained ”CERN first aider” « Piquet HSE Accident/prevention » physically on several LHC sites 05/11/2019 ED – Safety @ Open days 2019

Safety strategy: Training for volunteer Mandatory Courses (CERN personel) OD2019 "Gestes qui sauvent" Radiation Protection Communication OD 2019 Roles Vest color Safety at CERN Emergency Evacutaion Radiation protection Awareness Fire extinguisher for OD2019 First aider OD2019 Defibrillator OD2019 Radiation protection Supervised Areas Tetra OD2019 General Session OD2019 Visit and Evacuation Itinerary OD2019 Check-in tent Flow Control x (x)   Gate agent ​Crowd Marshal OD Flow Updaters T-Shirt ​Underground Guide Guide Surface ​Guide x (si ZS) ​Activity Animator ​Lecturer Info Agent Info Shop ​Traffic/parking Traffic Parking (X) Logistics Helper Organisation Site Manager Safety/1st Aid White cross @ LMS Amphitheatre TBD Already available June -> August September 05/11/2019 ED – Safety @ Open days 2019

People with limited mobility 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516

People with limited mobility in LHC Special pathways technically accessible for wheelchair ED – Safety @ Open days 2019

People with limited mobility in LHC Emergency plan made in collaboration with hosts states Inspire by FR/CH regulations Dispositif previsionnel de secours (FR) Directives pour l’organisation du service sanitaire lors de manifestations (CH) Define a “ratio” of resources after analysis based on: Effectif et comportement du public ; Caractéristiques de l'environnement et accessibilité du site ; Délai d'intervention des secours publics, … 05/11/2019 ED – Safety @ Open days 2019

People with limited mobility in LHC Based on resources already found and CERN Fire Brigade initial analysis Still 20 external Fire-fighters / Paramedic to be found Memo about Rescue Operations and Handicapped visitors - OD2019 EDMS 2166515 Each point with limited mobility public needs 4 external Fire-fighters and 1 CERN Fire-fighter pre-positioned with one fire truck “dedicated” Very low chance to found adequate resources for the 3 LHC points 05/11/2019 ED – Safety @ Open days 2019

People with limited mobility in LHC Proposal: Make it possible for point LHC5 – CMS (already almost done) Extend to LHC6 is not recommended Extend to LHC4 is not recommended 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516

ED – Safety @ Open days 2019 – EDMS 2166516 Back-up slides 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516

ED – Safety @ Open days 2019 – EDMS 2166516 Web Ticketing / print Site entry (A0): Meyrin, Prevessin, LHC … 11 Group forming area (A1) 35 LHC lifts (A2) 5 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516

ED – Safety @ Open days 2019 – EDMS 2166516 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516

At 3.8 persons/m2 movement ceases Maximum admissible crowding in safe zones 3 persons/m2 4 persons/m2 3 ≤ d ≤ 4 Tolerated only for very short periods d < 3 Acceptable d > 4 Not acceptable Nominal value 3 persons/m2 Maximum value 4 persons/m2 Art. L 3 of the ERP regulation fixes a maximum crowding of 3 persons/m2 for people attending an event in a room without chairs or benches. From the study “LHC Evacuation Assessment for LS1”, EDMS 1246565 At 3.8 persons/m2 movement ceases Point Underground zone Nominal max occupants n. (3 pp/m2) 5 US56 63 EDMS No 1352807 V2 S. La Mendola DGS/SEE

ED – Safety @ Open days 2019 – EDMS 2166516 05/11/2019 ED – Safety @ Open days 2019 – EDMS 2166516