Value of contract: Length of contract: Contract start date:

Slides:



Advertisements
Similar presentations
Trainers Notes This package provides an overview of the major issues likely to impact on Group Training Organisations with the Introduction of the new.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
122, 124, 126 Palatine Road, Blackpool, Lancashire, FY1 4DS Of interest to investors Opportunity for a strong Return On Investment 13 flats spread over.
DMK Mechanical Services Ltd Pipework Solutions… Service Excellence.
Technical boclair academy Building Drawings.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Underwriting a Development Loan and General Short Term Finance Eugene Esterkin and Gary Lederberg.
04_0001 Elias Semaan Iraq Infrastructure Reconstruction Project Update.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Conducting Safety Inspection Audits in the Workplace Laura Smith Industrial Safety Consultant Specialist Mansfield Service Office (P) (E)
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
TO LET Various Suites of Offices to the rear: 35/37 Victoria Road East Thornton-Cleveleys Lancs, FY5 5BU INDIVIDUAL OFFICE SUITES AVAILABLE FROM £30 PER.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Department of Regeneration Estates and Property Services.
RMIS Engineering At RMIS Engineering we specialise in Mechanical Engineering Contracting and Fabrication works to serve a wide range of industries in Carbon/Mild.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Taking the Guesswork out of your Commercial Kitchen Ventilation Projects!
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | dcps.dc.gov Ron Brown Modernization.
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
1 Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Progress Report September 2015 Prepared by Kim Randall Development Officer Hastoe House Association Morris Close Burwash.
.,. Contents 1ABOUT US 2OUR PURPOSE & VISION 3HISTORY & MANAGEMENT 4VALUES 5SERVICES 6SERVICES CONTINUED 7WORKDONE 8WORKDONE CONTINUED 9CONTACT DETAILS.
Facilities Consultants Experts in Europe
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
Pre-Contract Cost Control
Highveld Industrial Park Workshop No. 3 Information Memorandum
Curriculum for Excellence
Construction (Design and Management) Regulations (CDM) 2015
HOUSING & INTERIOR DESIGN
Interior Decorators in Delhi
Pre-Contract Cost Control
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
EcoTech Heating and Controls LTD Commercial Boiler House Install
Consulting Captains, LLC
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Building Drawings.
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
1 | P a g e SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T /
Value of contract: Length of contract: Contract start date:
New Build and Refurbishment Services for HQP partners:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Check equipment prior to start the job
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
Value of contract: Length of contract: Contract start date:
On-Site Facilities for Pre-production deployment
Presentation transcript:

Clarendon College, Pelham Street, Nottingham Refurbishment of the Catering Kitchen Value of contract: Length of contract: Contract start date: Completion date: £245,000 3 months July 2009 October 2009 Works/services provided: Removal & disposal of existing kitchen equipment , fixtures, fittings and building services Form apertures through pre-cast concrete wall & floor construction Installation of new duct work, gas supplies and three phase electrical supply Installation of specialist commercial kitchen cabinetry & appliances Hygienic wall, floor finishes and decoration Detailed description of contract: For complete refurbishment of the GO3 catering kitchen. The contract included de-commissioning and removal of the existing appliances , building fabric alterations and specialist installation, fit-out and finishing works during the summer shutdown period. JCT 2005 Minor Works contract revision 2, 2009. Particular challenges to be overcome: Contact details: Completion of all works during the summer holiday shutdown period to enable preterm commissioning and staff training before the return of students to use the facilities Integrating the newly installed equipment and building services into the existing college building management system Managing a team of specialist installers very closely to ensure successful project delivery Simon Rhodes (Senior Building Surveyor) Gaskell Construction Consultants Victoria House 104 Mansfield Road Nottingham. NG1 3HD Tel: 01159 484744