JLAB CHL 2K COLD BOX REPLACEMENT

Slides:



Advertisements
Similar presentations
Basic Refrigeration Cycle
Advertisements

N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
Vacuum Vessel Production Readiness Review
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
INTRODUCTION Definition:
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
HVACR116 – Trade Skills Longest length method.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
LCLS-II Cryoplant Overview
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
Overview of the ESS Linac Cryogenic Distribution System
Technical Procurement Plan
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
Michael A. Green and Heng Pan
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
2K Cold Box Structural Analysis
Installation of the T600 at Fermilab
2K Cold Box FDR Introduction
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
Mechanical Design and Analysis of LCLS II 2 K Cold Box
2K CB Internal Piping Flexibility Analysis
2K Cold Box Structure Analysis
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Overview of Mechanical Design
Goddard Space Flight Center
LARP Vertical Test Facility
Air Distribution Control
Far Detector Activities Late 2017 – Early 2018
SC1R Cold Box PDR Mechanical Design
INTRODUCTION TO PRESSURE VESSELS
2K Cold Box Mechanical Design
2K Cold Box Vacuum Vessel Structure Analysis
2K Cold Box Internal Piping Flexibility Analysis
Mathew C. Wright October 2016
SC1R Cold Box PDR Overview
Pressure Piping Analysis
STEAM CONDENSERS AND COOLING TOWERS Marks-16
SNS Cryoplant Commissioning Past Experiences
Piping and Instrumentation for Process Industries
SNS PPU Cryomodule Instrumentation
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Vacuum Vessel
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Thermal Shield & MLI
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

JLAB CHL 2K COLD BOX REPLACEMENT C2Po1G-05 [41] JLAB CHL 2K COLD BOX REPLACEMENT S Yang, K Dixon, N Laverdure, R Norton, C Butler, C MacDuffie, D Rath, R Brown, S Thompson, J Creel, T. Renzo, R Sprouse, N Hasan Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DOE-AC05-060R23177. Abstract— A new sub-atmospheric cold box (SC1R), which hosts five technologically superior, water-cooled compressors and one similar 4K-2K refrigeration recovery heat exchanger, was proposed in July 2017, to replace the existing 2K cold box. The design of the new 2K cold box and the external support system has been completed, allowing the project to enter the fabrication and assembly phase, which will be completed at JLAB. The CHL warm up is scheduled in May 2020. The installation of the SC1R 2K cold box and external support system is projected to start at the end of June 2020, and the commissioning will start at the end of October 2020. Figure A. SC1R 2K Cold Box Flow Diagram Fig. 2 Each cold compressor attaches to the cold box via a mounting plate and an unusual nozzle design that eliminates the need for an inverted, potentially water-accumulating well. The design allows just enough shell clearance for the compressor scroll casings. Fig. 1 JLAB CHL SC1R 2K cold box vessel. The 2K cold box vessel was designed to meet ASME BPVC Section 8 Div. 1. Finite element analysis (FEA) was performed according to Part 5, ASME VIII Div. 2 to check the mechanical integrity of the cold box vessel. Fig. 3 All piping was designed in accordance with ASME B31.3 – 2017 Process Piping. The minimum pipe length between the cold compressors was determined by a time constant. Bentley AutoPIPE was used to perform the flexibility analysis. Figure 4 The lifting / assembly fixture is for erecting the top subassembly as well as integrating the top and bottom subassemblies. It was designed to meet the ASME BHT-1-2017 Below-the-Hook Lifting Devices. Fig. B SC1R 2K Cold Box Overall Layout Table A. Allowable and Actual Maximum Absolute Values of Stresses per ANSYS 19.2 Fig. 5 The insulation vacuum vessel was fabricated by an outside contractor and shipped to JLab as four subassemblies: top head subassembly, bottom head subassembly, and two shells with manway and other penetrations. Test fitting of each component to its mating piece was performed by the contractor who provided indelible match marks across all joints between subassemblies. Fig. 6 MLI Insulations. The superinsulation consists of low-emissivity Mylar layers placed between low-conductivity spun-bonded polyester layers. Thirty layers of MLI are applied to the cold surfaces and twenty layers of MLI cover the internal surface of vacuum shell and surfaces of internal frame. Fig. 7 Completed top and bottom subassemblies. The top section assembly includes MLI blankets and their supports, five MLI insulated cold compressors, valves, bayonet, and 2K helium internal pipe spools. The bottom section assembly includes the internal support frame, the heat exchanger, stainless steel thermal panel, nitrogen and 4K helium pipe spools. Fig. 8 Integrated top and bottom subassemblies with installed half shell. It started at the end of May 2019. Since then, all helium and nitrogen pipe spools have been installed and leak tested, temperature diodes have been affixed and wired, all pressure tap tubing has been installed, and one of the half shells (with a manway section) has been tacked into place. Table B. Displacement in Vertical Direction of Casing Mounting Ring under Normal Operation per ANSYS 19.2 Conclusion - The design of the JLAB CHL SC1R 2K cold box, cryogenic and warm piping system and lifting fixture conform to the code requirements specified in ASME VIII, ASME B31.3, and ASME BTH-1-2017. The insulation vacuum vessel was fabricated by an outside contractor and shipped to JLAB as four components. JLAB is responsible for the rest of the fabrication. It was projected to be completed by the end of December 2019. However, based on the current progress, the fabrication may be completed no later than the end of October 2019. The project is ahead of schedule and below cost at this point. *The maximum flatness requirement from the cold compressor supplier is 5 mm/m. Presented at Cryogenic Engineering Conference and International Cryogenic Materials Conference, 2019 July 21 – July 25, Hartford, Connecticut; Poster ID: C2Po1G-05 [41]