TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Slides:



Advertisements
Similar presentations
Capital developments at SFX
Advertisements

Homes.
Welcome to the new Penguin Exhibit at the Woodland Park Zoo. It opened mid May, This is a tremendous improvement over the previous exhibit which.
The Cahill Expressway Passenger Lifts The construction of Sydney’s newest landmark……….
Phase Difference = Phase Difference = 0.05.
EMPIRE FITNESS CLUB Rodney Bettcher Matt Schwitz Steve Clancy.
 VY_32_INOVACE_AJ3r0116 Vocabulary presentation Jaroslava Dlabajová.
Making Strategic Transport Infrastructure Planning and Investment Real in the Regions SUBTITLE HERE PRESENTER’S NAME (TITLE OR DIVISION)
CDL Commercial Driver License. Types of CDL There are three types of CDL classes the C class, B class, A class. A class: can drive tractor trailers and.
Excuse me. Where’s … ?. Swimming pool Playground Bus stop CCC. Kei Wa Primary School (KT) Windy Road Cloudy Road Happy Road Excuse me. Where’s … ? Sunny.
Area of a Circle. The area A of a circle equals the product of π and the square of its radius r. When finding the area of a circle, you have to use the.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
Transport and handling at CERN for FAIR
Alg. I Practice. |x+4|+ 3 = 17 |x+4|= 14 or x+4 = -14 x+4 = 14 x = 10or x = -18.
Council of University Transportation Centers (CUTC) Wednesday, June 3, 2015 PUBLIC INVESTMENT IN RESEARCH?
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
About where we are going We are going to stay at Tokyo Japan the prices of the flight are 1000 or more for their and back.
MY DREAM ROOM By Jayden Perkins. Costs Indoor NBA size basketball court:$150,000 to $1.5 million Indoor Olympic sized swimming pool:$20,000 to $100,000.
Urbanization of Rural Areas Urbanization of rural areas occurs as the result of: –Cheaper property for development –Larger new neighborhoods accommodate.
AQUATICS FACILITY Conceptual Proposal March 1, 2007 Hilton Head Aquatics with Island Recreation Center.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Goal To provide year round professional programming at a indoor City owned facility.
PERIMETER AND SOLUTION PROBLEMS ASSIGNMENT. 1. What is the perimeter of the below shape? 10 – 5n 12n+2 15n - 5.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Accommodation Solutions for people with learning disabilities in Hertfordshire Laura Fortune Senior Commissioning Manager.
Request for Approval of Temporary Rule Changes to 15A NCAC 02H.1002 Presentation to NC Environmental Management Commission March 13, 2014.
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) LAGUNA PROJECT Paris Meeting – March 2012 Update.
Williams-Sterling, Inc. Proprietary Information & Highly Competition Sensitive Data When Completed Modular Housing Solutions Go from Interim Housing to.
List of Transport Software In India Transport and logistics is a very big industries and road transport in india works best for carrying goods from one.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Room service! Booking a hotel in English!. This is the area in the hotel where guests arrive and register. This is also where you pay the bill and check.
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Swimming at Overstone 230 children at the school (ages 4 to 11) All swim at least once a week during the summer term. Benefits of our own pool Meets national.
International Ski Trip February 2018 Parent/Carer information evening
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
HIAB TRUCK HIRE SERVICES BY DELTA TRANSPORT
DO NOW: Simplify. Topic: Algebraic Expressions 2
Integration & Commissioning
Total Environment Hennur Road
Reading RFC U7, U8 & U9 Festival
PROJECT PLANNING MEETING
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
BACK SOLUTION:
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
عناصر التنمية السياحية
Recruitment Trip 2011 Associate Benefits Proposed Topics:
Bangkok Patana School.
Vector Problems in 3- Dimensions
Lincoln Common Redevelopment Construction Update.
BARNHART THLG member since 2013
Planning Commission January 20, 2016
What do you want to do? Creative Writing.
Around the room Orders of operations.
Travel and Transportation
Business Logistics Management
Coppice Ridge, Fiskerton, Newark
Cell Tower Ordinance Update
Central Primary School Arts Day
Where’s the classroom? It’s on the second floor. 2A : Unit 1.
Accenture Federal Services (AFS) Class Presentation
On-Site Facilities for Pre-production deployment
Trailer.
Technical proposal Challenges and Opportunities of Private real-state development in Mekelle.

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Shapoorji Pallonji Mohali Brochure - Your Dream Home is here

Presentation transcript:

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS CONTINUATION OF PROJECT AT A PRESTIGIOUS HERTFORDSHIRE PRIVATE SCHOOL - NEW SWIMMING POOL CHANGING ROOMS FACILITY

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS We have recently (2017) commissioned a “TURNKEY” project at a prestigious private school in Hertfordshire where the pool was completely refurbished The third phase of the project was a changing rooms facility adjacent to the pool enclosure This will enable the school to use the pool in times of inclement weather and could even be used all year round

TOTAL POOL REFURBISHMENT SOLUTIONS Transport has arrived. The school is 19th century and the access roads were made for transport that did not include arctic lorries. This posed a real logistical problem and one our motto "results not excuses” was certainly tested to the max Quite a fete getting on to site

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS Day One Because the access could not accommodate the transport the unit was being delivered on, we had to hire a trailer/tractor and have the unit placed on the trailer sited on the bottom playing field

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS DAY TWO The tractor now had to pull the trailer up to the proposed site, where we had a crane on standby. This then lifted the unit to within 15 feet of the final position DAY THREE We now had to place the unit inch by inch into position

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS What an achievement ! The unit is now in place adjacent to phase two of the project, the swimming pool enclosure

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS The new changing facilities – adjacent to the pool enclosure

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS This is how the pool was after phase one With the new pool buildings phase two and three