Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.

Slides:



Advertisements
Similar presentations
STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Advertisements

03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
Assessment and Proposal W. B. Atwood UCSC, April 6, 2005.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
July 2001 Snowmass A New Measurement of  from KTeV Introduction The KTeV Detector  Analysis of 1997 Data Update of Previous Result Conclusions.
S. Ritz1 Checking Out What is Checked In  Need to optimize balance of checking between users and developers. –infuse more of a culture of detailed checking.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
Status of  b Scan Jianchun Wang Syracuse University Representing L b scanners CLEO Meeting 05/11/02.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
GLAST LAT Project Collaboration Meeting 8/30/ Beam Test Plan - SLAC End Station A Secondary Beams Gary Godfrey August 30, 2005 GLAST Collaboration.
Measurement of B (D + →μ + ν μ ) and the Pseudoscalar Decay Constant f D at CLEO István Dankó Rensselaer Polytechnic Institute representing the CLEO Collaboration.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
W properties AT CDF J. E. Garcia INFN Pisa. Outline Corfu Summer Institute Corfu Summer Institute September 10 th 2 1.CDF detector 2.W cross section measurements.
Calibration of the ZEUS calorimeter for electrons Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration of the.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
10/10/2005 Alex Moiseev 2006 LAT Beam test 1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
High-energy Electron Spectrum From PPB-BETS Experiment In Antarctica Kenji Yoshida 1, Shoji Torii 2 on behalf of the PPB-BETS collaboration 1 Shibaura.
Longitudinal shower profile - CERN electron runs Valeria Bartsch University College London.
Mike HildrethEPS/Aachen, July B Physics Results from DØ Mike Hildreth Université de Notre Dame du Lac DØ Collaboration for the DØ Collaboration.
Calibration of the ZEUS calorimeter for hadrons and jets Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration.
Studies of Electroweak Interactions and Searches for New Physics Using Photonic Events with Missing Energy at the Large Electron-Positron Collider Marat.
1 S, Fedele, Student Presentations, 2004/08/04S Amazing Title Slide Reworking the CES Cluster Reconstruction Algorithm By: Steve Fedele Advisor: Pavel.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
1 Suggestions to 2006 LAT prototype beam test plan Alex Moiseev, NASA/GSFC.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
QCD Prospects for ATLAS Rainer Stamen Universität Mainz On behalf of the ATLAS collaboration QCD 06 Montpellier, July 3rd 2006.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Simulation Tools for Test Beam
Electroweak physics at CEPC
LKr inefficiency measurement
ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and.
Gamma-ray Large Area Space Telescope ACD Final Performance
Comparison of GAMMA-400 and Fermi-LAT telescopes
Particle detection and reconstruction at the LHC (IV)
GLAST LAT tracker signal simulation and trigger timing study
Gamma-ray Large Area Space Telescope
Tracking System at CERN 06 and 07 test beams
GLAST Large Area Telescope:
Overview of CLAS12 Calibration
Observation of Diffractively Produced W- and Z-Bosons
GLAST Large Area Telescope Instrument Science Operations Center
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Overview Goal Study GEM variables in SVAC ntuple
Plans for checking hadronic energy
Charged Particle Multiplicity in DIS
Imaging crystals with TKR
Mini Tower Preliminary Results
Michele Faucci Giannelli
L*(1520) Photoproduction in gppK+K- from the g11 data set
CR Photon Working Group
Integration and Test Organization Chart
Observation of Diffractively Produced W- and Z-Bosons
J. Rutherfoord & P. Schacht 17 May 2004
Status Report and highlights from workshop II
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Presentation transcript:

Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information

Current Activities and Timeline Meetings Weekly coordination meetings by phone Coordination group: Benoit, David, Luca, Ronaldo, Gary, Eduardo Help Benoit, Ronaldo and Eduardo in the organization process Discuss organizational matters and planning Prepare for general VRVS meeting Bi-weekly VRVS meetings Involves all LAT Collaborators Inform LAT collaborators of recent developments Gather input from collaborators Bi-weekly report in VRVS C&A meetings Summary of latest activities Benefit those who cannot be present on the beam test meetings Timeline By early Dec, 2005 Response from CERN whether we are approved or not Jan, 2006 Submit a beam test plan to the LAT collaboration > end of July, 2006 Beam test starts Depends on CERN approval and schedule Dec, 2006 Finalize data analysis Aggressive schedule!

Beam Test Objectives Science performance verification strategy LAT phase space is huge MC simulation used to verify requirements by analysis Beam test used to tune and check the simulation and aspects of the reconstruction. Essential component of our overall strategy Objectives See Beam test Rationale Document LAT-TD-02152-02 Undergoing update Highest-energy performance corrections for leakage, inter-tower gaps, and backsplash (SSD in TKR and ACD). Electromagnetic showers (gamma, electron) beams up to at least 100 GeV. Check the PSF and Energy reconstruction methods. Tagged photon beam particularly in ~GeV range. Compare distributions of quantities related to those used in background rejection with hadron beams. Not a direct test of end-to-end rejection -- instead, check relevant distributions Check trigger performance (e.g., CAL-HI), comes “free” with same data Beam Test Hardware Impractical to put full LAT in beam Use spares 2 TKR modules 3 or 4 CAL modules 2 to 5 ACD tiles 4 TEM modules 1 GASU (for trigger) 1 PDU (for power distribution, if available) Primary purpose is to constrain systematic uncertainties in science analysis

Objectives: more details… 1. PSF and Effective Area Measure PSF and reconstruction efficiencies (by region, angle); check analysis and CTs; tune G4 parameters for TKR topologies. <100 MeV to >3 GeV tagged photons on- and off-axis 2. Electromagnetic shower Calibrate Energy and Measure Energy Resolution Tune simulation parameters and check energy reconstruction algorithms Check corrections near edges Shower profiles <100 MeV to >3 GeV tagged photons and ~1 GeV to >250 GeV electrons 3. Backsplash Measure TKR and ACD tile multiplicities, rates and topologies from backsplash 50 GeV, 100 GeV and >150 GeV electrons 4. Hadronic shower & Background rejection Modeling of shower topologies in the CAL; Stubs and other TKR topologies from upward-going energy TKR topologies; TKR-CAL matching Compare data and MC input distributions used by classification trees for analysis of background rejection 1 to 15 GeV protons (incident in the CAL) , higher energies available @ SPS 5. Characterize Trigger/Timing CAL-HI trigger use >20 GeV electron data other useful checks with same data set. (no special runs needed) Trigger functionality At different rates with high energy particles System timing high energy beams Data Analysis Plan Need prioritized list of plots re-estimate required statistics (based on needed precision) Define minimum success as soon as possible

Low Energy Tagged Beam Area (PS) Photo from document written by Michela Prest for the AGILE test beam Tagging Si Chambers + S3 Beam Si Chambers + S1+S2 ~ 150 cm

High Energy Beam Area (SPS) Looking from the other side… Looking from one side… Goliath & David 188 cm (if he has not grown ever since…) XY table (calibration unit sits here) Looking from the top (Courtesy of Alex Moiseev)