Close-out.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Concept & architecture of the machine protection systems for FCC
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Introdcution to Workpackage/Activity Reflection D. Schulte.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
Summary of Session 1 - CLIC MP workshop 6-8/6/2012, R.Schmidt 1.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Fast Beam Abort FAIR FC2WG: M.S. Mandaković, CSCO
Registered participants participants from outside Cern.
Operations Machine Simulator.
Introduction; Machine protection, experience and challenges: Review of existing solutions and challenges faced by future installations Purpose of machine.
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
BEAM LOSS MONITORING SYSTEM
R. Denz, A. Gomez Alonso, AT-MEL-PM
Dependability Requirements of the LBDS and their Design Implications
LHC Commissioning with Beam
Introduction: FCC beam dumping system
RF interlocks for higher intensities (LMC 15 June)
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
M.Jonker CTC MPO-WG status
J. Uythoven for the MPE-MI & MS Teams
Joint Meeting SPS Upgrade Study Group and SPS Task Force
STPA FOR LINAC4 AVAILABILITY REQUIREMENTS
BEAM LOSS MONITORING SYSTEM
Safe Injection into the LHC V.Kain AB/CO
Initial Experience with the Machine Protection System for LHC
MPSC Procedures An update
Remote setting of LHC BLM thresholds?
Machine Protection Xu Hongliang.
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Fault Tolerance Distributed Web-based Systems
Interlocking of CNGS (and other high intensity beams) at the SPS
BEAM LOSS MONITORS DEPENDABILITY
Protection against accidental beam loss at the LHC
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
Machine Protection System Commissioning plans
Chamonix Workshop XIV CERN - 17th-21st January 2005
1v1.
Will We Ever Get The Green Light For Beam Operation?
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Interlocking strategy
Configuration of BLETC Module System Parameters Validation
Integration into MP - Considerations -
Review of hardware commissioning
What systems request a beam dump? And when do we need them?
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Close-out

Introduction The problem is obvious: Magnetic field increase only a factor of 2 Energy increase only a factor of 7 Stored energy increase > 2 orders of magnitude (damage/quench)

General The Committee wishes to commend the speakers for the presentations. A great deal of hard work has obviously gone into the planning, design and in some cases realisation of the various sub-systems. The Committee thinks that the front-end system design for both the machine protection system and the associated sub-systems are quite mature. Knowledgeable personnel TI-8 tests proved useful (in more than one way) Radiation tolerance testing in the SPS beamline & PSI

The Committee feels that the fundamental strategy is sound: Do you consider the overall strategy for the machine protection adequate ? And what could be the main risks ? The Committee feels that the fundamental strategy is sound: Failsafe/redundancy Pilot beam Safe-beam concept Injection protection well done Aperture defined by collimators Mask-able states Comprehensive in the use of the various sub-systems The system represents a reasonable extension of existing systems

Software logic/release control Do you consider the overall strategy for the machine protection adequate ? And what could be the main risks ? The Committee feels that configuration control represents the main risk of machine damage Highly complex Many elements Mode changes Software logic/release control All Doomsday scenarios (350 MJ) appear to involve the dump kickers in one way or another

Are there mechanisms for beam losses not being considered that could impact on the strategy ? While the Committee can imagine other beam loss scenarios we do not feel that the overall strategy would be changed in any significant way

Are the interfaces between the different systems clearly specified ? The hardware interfacing to the Beam Interlock Controller is well defined in most cases. Likewise the majority of the input signals are determined. The Committee notes the system is trivially capable of expansion (reduction !). We feel that the software interfaces are less well determined BIC, BLM & Beam Dump control/interface software Post mortem data State control

Are there other protection devices that should be considered ? We feel that while the postulated protection devices are suitably comprehensive there may be a role for diversified independent back-up systems for the beam dump triggers and energy tracking (Doomsday scenarios). The backup systems would be expected to have much wider operational tolerances. Possibly hire some professional outfit to look at this

Faster response from the Power Converters ? Control system inputs ? Are there other input channels to the Beam Interlock System that should be considered ? Nothing Obvious Faster response from the Power Converters ? Control system inputs ? Network failures ?

Will the protection system have the required safety ? As designed it should. Two caveats: The Committee strongly queries the utility of a device such as the aperture kicker given the potential risk inherent in it’s operation. In a similar vein the use of fast vacuum valves is also something that needs to be carefully justified.

Will the protection system allow for efficient operations (availability) ? The main risk would appear to involve not achieving suitable luminosity rather than not being able to run the machine with beam Achieving design luminosity will require a beam loss rejection of 10E-4 to avoid quenches. This requires tight tolerances and has not been demonstrated in any existing machine. It is less than obvious to the Committee that the collimator efficiency can be validated in an operational way. Reliability calculations provide a mechanism to determine the optimal strategy to allocate fixed resources among the various sub-systems.

Based on experience elsewhere what is most critical and where have been surprises ? Power supplies gave the worst problems in the initial stages at all machines. Every machine has had at least one event that would have been catastrophic with LHC beam. There is no obvious single root cause. We believe that these failures have all been potentially addressed in one way or another in the LHC machine protection system. Commission of necessity involves a large amount of equipment failure/repair and associated downtime. It is an inherently risky time. Additional care must be taken to avoid ‘shortcuts’. Responsibilities must be well defined.

Comments Validation cycle for a ‘warm’ start - semi safe beam state Reproduceability ? Post mortems are crucial to the machine operation. Data gathering and archival functions need definition for subsequent analysis and re-qualification. Formal qualification for the MPS system software ? Diverse systems for critical functions Define ‘failsafe’ in operational terms

Comments Spares for the dump septum Distribution of the safe beam parameters slightly vague SPPS dump integrity DC beam measurement was too slow (~100 ms)

Comments

Comments