Certification Plan EdgeX TSC F2F May 1, 2019 1.

Slides:



Advertisements
Similar presentations
Software change management
Advertisements

MITA Gateway 5010 Overview May 18th 2009.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Scope Change Control Process Modifications March 7th, 2007.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Vulnerability Assessment Course Terms, Methodology, Preparation, Obstacles, and Pitfalls.
Purpose of the Standards
Configuration Management
Manage Project Scope Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG502A.
Ravi Subramaniam – Technical Director, ICAP 22 September 2012 Geneva, Switzerland IEEE Conformity Assessment Program (ICAP) for SIEPON 22 September
NIST Special Publication Revision 1
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Laboratory Accreditation as a Component of the Help America Vote Act Mary H. Saunders Chief, Standards Services Division.
Testing Workflow In the Unified Process and Agile/Scrum processes.
OpenSG Conformity IPRM Overview July 20, ITCA goals under the IPRM at a high level and in outline form these include: Organize the Test and Certification.
Software Engineering Quality What is Quality? Quality software is software that satisfies a user’s requirements, whether that is explicit or implicit.
Accreditation for Voting Equipment Testing Laboratories Gordon Gillerman Standard Services Division Chief
LeToia Crozier, Esq., CHC Vice President, Compliance & Regulatory Affairs Corey Wilson Director of Technical Services & Security Officer Interactive Think.
Notes of Rational Related cyt. 2 Outline 3 Capturing business requirements using use cases Practical principles  Find the right boundaries for your.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Welcome Experiences in the Use of MDA and UML in Developing NATO Standards 16 July 2008 Chris Raistrick, Kennedy KC.COM.
Service Service metadata what Service is who responsible for service constraints service creation service maintenance service deployment rules rules processing.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Database Administration
Annual CUE Conference 2013 Kelley Day
Levers enabling industrialised deployment and a effective multi-vendor eco-system We wish to assess the current position of these levers and the opportunity.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Standards and Interoperability Framework esMD Primer of S&I Phases, Procedures, and Functions S&I F2F Thursday, April 12 th, :00 AM.
International Organization for Standardization Develops voluntary standards to help promote international trade Network of national standards bodies Has.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
Enforcement 101 Rachael Ferrin Associate Process Analyst.
HR Open Standards Consortium Overview
Discussion Topics for Exploring OMG UPDM Way-ahead
Software Hardware refers to the physical devices of a computer system.
---compliance and certification
Software Development and Safety Critical Decisions
Software Engineering (CSI 321)
ARC: Definitions and requirements for SO/APP-C/VF-C discussion Chris Donley Date , 2017.
OCITF/OCWG Project Update
Software and Systems Integration
Globey's World Abstract End-Product Description Technical Approach
6/17/ :27 AM BRK3341 Unlock extensibility by connecting your service to PowerApps and Microsoft Flow Theresa (Tessa) Palmer–Sr. Program Manager Sunay.
Introduction to OPNFV CVP
Margaret Goodrich June 18, 2010
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Security Working Group
Texas Instruments TDA2x and Vision SDK
Manage Project Costs Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG504A.
IS442 Information Systems Engineering
Standardization in the Beauty and Wellness Sector
Introduction to Software Engineering
Important Software Performance Testing That Ensure High Quality Solutions.
IT Considerations for CPT Implementation
March 2018 Facility Planners Meeting
Continuous Automated Chatbot Testing
PRELIMINARY DESIGN Stage Gate Reviews
End-Product Description
Rapid Connect® Monthly Product Updates-Canada
CSSSPEC6 SOFTWARE DEVELOPMENT WITH QUALITY ASSURANCE
Component-Based Software Engineering
Globey's World Abstract Design Requirements Introduction
IT Considerations for CPT TEE Implementation
Proposed Review Cycle to
Legacy system components
MSC Online Training Handbook
Desktop App Assure Service Microsoft Representative Name June 7, 2019
Research on edge computing system based on Linux EdgeX Foundry
TSC Business Meeting V1 Launch & Other Marketing activities
Developer Advocate Report Current Project Community and how to shape it 9am Day 2.
ONAP Architecture Principle Review
Presentation transcript:

Certification Plan EdgeX TSC F2F May 1, 2019 1

Certification Objective Support multi-vendor ecosystem Public commitment to API and use standards Reduce risk for users (improve adoption) Plan document: https://wiki.edgexfoundry.org/display/FA/Certification+Plan+Document

Scope EdgeX “Components” Device Services Application Functions Core Services For now, does not attempt to certify full implementations or components that don’t interact with core

EdgeX Certified Components will… Be compliant with the EdgeX APIs for its type of service Be interoperable with other EdgeX services Support for EdgeX system management agent Be robust; reliable, able to recover from faults, start in any order, wait for dependent services, etc. Provide documentation on functionality and deployment Not negatively impact the operation of other EdgeX services

Certification Levels Self-Assessment Formal Certification Organization conducts self-evaluation to confirm meeting defined requirements Formal Certification Testing conducted by neutral certification authority

Recommendation based on TSC Discussion Do Self-Assessment first Assessment is black box tests + checklist of instructions Start with Device Services, but others if possible Available by end of 2019 using artifacts from Fuji release Define process to promote “assessed” components

Planning Requests Technical Business Black box tests EdgeX “test harness” Documentation on assessment procedures and results to capture Business Program promotion (“EdgeX Ready”?) Review process for promoting assessed components

Certification WG Meetings Mondays, 7am PDST Plan document: https://wiki.edgexfoundry.org/display/FA/Certification+Plan+Document Randy Thompson Randy.t@dell.com

Assumptions Do not require submitters to provide source code. Services submitted for certification are expected to be packaged in Docker/Docker Compose. EdgeX is agnostic with regard to platform hardware and OS, but that platform independence is not tested.   Certification is not dependent on the programming language or technology used in the service. EdgeX is orchestration agnostic.  Services should be designed that way and should not make any assumption about orchestration/ QoS Certification will be to an EdgeX release.