Westerly School Legacy Plan: A Vision for the Future of Education

Slides:



Advertisements
Similar presentations
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Advertisements

Oregon Housing and Community Services Oregon State LIHEAP Weatherization Program NASCSP Annual Conference and DOE WAP State Managers Meeting September.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Jurupa USD Prop. 39 Energy Efficiency Project Phase III
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Building for Their Future Dublin Unified School District.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
PASBO Building Considerations for Vo-Tech Education March 17, 2011 Pat Adams Dave Kramer Collin Sandifer.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
10/19/20151 Building a Legacy Rebuilding Providence Public Schools 2008 Q1 Report Volume III.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Introduction to the Rochester City School District Facilities Modernization Program Browncroft Neighborhood Association October 11, 2006.
Capital Improvement Program for September 9, 2014.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
MSAD # 52 Energy Savings Performance Contract May 4, 2016 Upgrading our School Facilities and Reducing Energy and Maintenance Costs Utilizing Performance.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
Vision for the Future Spring 2016 Campus Open Forum APRIL 7, 2016 STUDENT CENTER CONFERENCE ROOM.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Madison Elementary School District
AHISD Mission Statement
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
Cuba-Rushford CSD Capital Project
White Pigeon Community Schools
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
Building Services Summer 2016 Update
OABCIG General Obligation Bond Referendum Presentation
Proposed School Bond Referendum September 26, 2017
Five Year Capital Projects Plan Through
Capital Projects Requests
Cornwall Central School District
Strategic Planning & Operations
School #1 Ballot Question and Proposal
Bob McGreevy, PE CEM President EES
REFERENDUM Your vote matters! September 26, 2017
Bond and Override Report
Dr. Joseph Meloche Superintendent of Schools Mrs
MIRACOSTA COMMUNITY COLLEGE DISTRICT
May 8, 2018 Bond Program.
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
UNION GROVE ELEMENTARY REFERENDUM
Kincaid Hall Renovation
Capital Outlay Workshop
Pillager Public School District Community Survey Results
Master Facilities Committee Evaluation and Identification
Mount Vernon Community School
East Troy Community School District Community Survey Results
Zumbrota-Mazeppa School District Community Survey Results
FY Capital Improvement Program Draft
Presentation transcript:

Westerly School Legacy Plan: A Vision for the Future of Education

Final Phase of Vision 2020 Create 21st Century learning environments at the elementary schools District wide safety and technology enhancements Improve critical systems; heating, ventilation and electrical Address building life cycle renewals, and unfinished work at WHS campus Westerly Public Schools RGB ar chitect s

Addressing the Need in Westerly State Street Failing Exterior Envelope Springbrook Moisture Infiltration ture Rusted Switch gear Dunns Corners Caferteria Water infiltration at WMS Water Infiltration Westerly Public Schools

Temporary Bonus Incentives Include: A Unique Opportunity 25 applications submitted statewide Westerly’s project was 1 of 6 approved for funding Approved for over $74 million with a guaranteed base reimbursement rate of 35% RIDE commended Westerly for its efforts to "provide healthy and safe schools, while addressing the program enhancements that will help align the local education authority's facilities to the teaching and learning that Westerly desires to deliver.” Historic State Funding Available Westerly qualified for an additional 15% bonus reimbursements points for a total of 50% Temporary Bonus Incentives Include: Health and Safety Deficiencies + 5% Educational Enhancements + 5% Newer and Fewer + 5% Westerly Public Schools RGB ar chitect s

A Community Based Process Westerly Public Schools RGB ar chitect s

What we heard from the community: A Community Based Plan What we heard from the community: State Street Facility has reached the end of its life cycle Improve technology and access to the curriculum Move the 5th grade back to the elementary level Provide more project based learning and collaborative learning spaces Maintain the buildings and improve safety Westerly voters will be asked to approve the Westerly Legacy Plan through a bond referendum on October 10, 2019. Westerly Public Schools RGB ar chitect s

A Plan for the Future of Education New upper Elementary School for all students grades 3-5; situated in the center of where our largest student population resides. Providing equity of access to modern day learning spaces for ALL Westerly students. Dunn’s Corner School and Springbrook School transformed to prek-2 Early Learning Centers with intensive focus on both early literacy and numeracy. Westerly Middle School reverts back to a grade 6-8 school as originally designed, with a greater emphasis on hands-on, project based learning Westerly Public Schools

Aligning Buildings with Teaching & Learning New grade configuration - Early literacy and numeracy, horizontal alignment of curriculum across all grades, concentration of supports for ALL students Spaces designed for modern day teaching and learning (i.e. flexible, adaptive, tech-current, secure and “Green”) Collaborative Spaces Maker spaces Integrated STEAM Project based learning Westerly Public Schools

State Street Upper Elementary School New school for all grade 3-5 students State of the Art, modern environment for teaching and learning Flexible, adaptable, tech-enhanced learning spaces Emphasis on energy efficiency, natural light and improved indoor air quality Increased onsite parking available to families, staff and the neighboring Senior Center Westerly Public Schools

Dunn's Corner & Springbrook Elementary Schools Upgrades Transformed to prek-2 Early Learning Centers Additions & Reconfigurations Secure vestibule, roofing, site lighting, fire suppression system, air-conditioning Dunn’s Corners cafeteria moved out of basement Furniture, fixtures and equipment to support 21st Century learning Westerly Public Schools

Timeline Bond Referendum October 2019 Construction starts at State Street June 2020 Tower Street opens as Temporary Facility August 2020 Construction starts at Springbrook and Dunn’s Corners June 2021 August 2022 Elementary Schools open with new grade configuration (Upper Elementary 3-5, Lower Elementary Pre-k – 2, Middle 6-8) Renovation of Ward and Babcock May 2022 – June 2024 Westerly Public Schools RGB ar chitect s

Cost Estimates Total Dunn’s Corners Elementary $7,229,895 Springbrook Elementary State Street Upper Elementary $37,293,819 High School Babcock High School Ward High School $3,874,846 $8,879,375 $1,901,780 District-Wide Total $71,409,946 Above includes Furniture, Fixtures, and Equipment Costs – a major expenditure for each elementary school. Westerly Public Schools RGB ar chitect s

Westerly High School Ward Building Upgrades $8,879,375.00 New Central Heating System $3,882,729 New Central Ventilation System $4,767,136 New grease waste system in kitchen $ 211,000 Clean, flush, scope existing underground sanitary/kitchen waste system $ 18,510 Westerly Public Schools

Westerly High School Babcock Hall Total included in the Bond $3,874,846 New Central Heating System $ 2,035,246 New Central Ventilation System $ 1,524,600 Electrical Upgrades $ 315,000 District Wide Environmental Control system $1,901,780 These upgrades allow for central control and monitoring of all systems in at Westerly High School, Westerly Middle School, Westerly High School, Springbrook Elementary School and Dunn’s Corner Elementary School Westerly Public Schools

Cost to Average Homeowner Westerly Public Schools

1) Items included in bond not eligible for state aid (2) To be included in school annual capital budget (3) State aid issued during construction to debt

Capital Maintenance Program Approved 5 year capital plan with minimum 35% RIDE has new requirements to ensure districts budget for ongoing facility upkeep Improved contract and quality staff from Aramark Contracting professional services to complete 5 yr CIP Adding trades Improving and creating systems to increase accountability New systems will allow for more efficient operation and upkeep of systems Training staff Maintain a School Buildings Capital Subcommittee Westerly Public Schools

Westerly Middle School Capital Projects Plumbing, fire suppression and security upgrades Mechanical system updates and enhancements Water intrusion repairs Westerly Public Schools

Projects already underway or to be completed 2019-2020 FY 2019/2020 Capital Projects District Wide eligible for 35-50% state reimbursement Building Item Cost Babcock Hall Electrical Panel $20,000.00 District wide Security $91,915.00 technology $211,794.00 State St Exterior masonry $29,848.81 Dunns Emergency Escape Windows * $ 122,558.80* WMS Auditorium –dimming control lighting upgrades $77,000.00 Tower St   Playgrounds $56,000 Projects already underway or to be completed 2019-2020 FY 2019/2020 RIDE Emergency Funding Request Projects District Wide 35% state reimbursement Building Item Cost Dunns HVAC improvements to existing cafeteria $24,000.00 Roofing $190,000.00 Springbrook Exterior repairs $28,000.00 Guard Rail $30,000.00 Replace unit ventilators $100,000.00   Westerly Public Schools

Switch gear replacement FY 2020-24 Dunns Corners Capital projects eligible for 35-50% state reimbursement Year Item Cost 2020-2021 Electrical upgrades $126,900.00 2020/2021 Plumbing $14,750.00 2021/2022 Window replacement $ 285,229.99 2021/2020 Flooring replacement $ 344,811.86 2022/2023 Roofing $700,012.28 2023/2024 Switch gear replacement $310,581.00 2020-2024 Approved Capital projects FY20-24 Middle School capital projects eligible for 35-50% state reimbursement Year Item Cost 2020/2019 Water Intrusion repairs $49,908.00 2020-2021 Plumbing and fire suppression upgrades $7250.00 2023/2024 Mechanical System Upgrades $85,000.00 FY20-24 Springbrook capital projects eligible for 35-50% state reimbursement Year Building -Item Cost 2023/2024 Springbrook Roofing $181,747.65 Westerly Public Schools

2020-2024 Approved Capital Projects Westerly High School Campus FY20-24 Capital WHS Ward building eligible for 35-50% state reimbursement Year Item Cost 2020/2021 Ward Secure Entry Vestibule $249,999.18 Ward Repair Electrical Vault Deck Membrane $149,804.50 Install hose valves and under-stage sprinkler system at auditorium stage $ 32,500.00 Remove old equipment and install clean agent fire suppression unit in IT room $ 50,000.00 2021/2022 Auditorium Upgrades for CTE $99,978.29 New kitchen hood/exhaust $125,000.00 2022/2023 Remove abandoned equipment $6920.00 Field Light Shed Light branch replacement (fixtures and wiring) $4952.00 Concession Stand water heater replacement $ 7000.00 2023/2024 Remove existing obsolete electrical panels $151,875.00 FY20-24 Capital WHS Babcock building eligible for 35-50% state reimbursement Year Item Cost 2020/2021 Fire Suppression in kitchen $ 2875.00 Plumbing Upgrades/backflow preventer domestic water $26,250.00 Sump pump in fire pump room $7500.00 2020-2021 Emergency eye wash in nurses room $7000.00 2022/2023 Clean/flush/scope underground sanitary/kitchen waste piping $14,750.00 2023/2024 Remove and Replace grease interceptor in cafeteria $20,500.00

Questions? Westerly Public Schools RGB ar chitect s

Please Approve Question #1 on October 10th Westerly Public Schools RGB ar chitect s