IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019.

Slides:



Advertisements
Similar presentations
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Advertisements

Grid Issues Charles Davies Commercial Director, National Grid Company British Wind Energy Association April 2002.
Queue Reform at the Midwest ISO NARUC February, 2008.
Joint ICT Infrastructure Outline Business Case Joint Partnership Board July 2010.
Errol Close Decarbonisation Policy and Co-ordination IWFA May Conference.
Copyright Talisman Energy (UK) Limited 2004 The Beatrice Windfarm Demonstrator: Part of the European DOWNVInD Programme Distant Offshore Windfarms No Visual.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Energy Bridge Releasing Irelands Energy Potential.
Stephen Boyd, Assistant Secretary, Scottish Trades Union Congress.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Scottish Renewable Energy Infrastructure Plan Emerging Conclusions Euan Dobson 3 November 2009.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
Local Transport Plan 3 Vision and Issues. The Local Transport Plan Will replace LTP2, which expires 31 March must have LTP3 approved and operative.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Private Sewer Transfer David Walter Managing Director, Dyno Rod Drainage and Sewerage Service provision in the future.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Filename.ppt1 The Pursuit of Economic Ocean Energy A Utility Perspective John Fitzgerald Technology Manager ESBI Ocean Energy.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
A National Grid Fit For The Future Chris J Murray. Newton Institute - 26 th May 2010.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Spokane Certified Site Program WEDA Conference 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
Accelerating Renewable Connections Stakeholder Workshop Scotsman Hotel, Edinburgh 26 th June 2014 Presented by Euan Norris Senior Project Manager, Future.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Azure Stack Foundation
Martin Tugwell 17tNovember 2016
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
DSC Change Committee UK Link Future Releases Proposed Approach
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
West of England Joint Transport Study
Grid Optical Burst Switched Networks
Tourism Growth Partnership – Round 5
Strategic Transport Forum Friday 15th September 2017
XS2I4MS – Final Event of the Mentoring and Coaching Programme
Restructuring Roundtable June 16, 2017
Contracting Officer Podcast Slides
Self-evaluation template for GTM Alessandro Ischia, E-Control
16th Renewable Energy Summit
World Bank Business on Renewable Energy
North sea wind power hub
An introduction to ACSA
March 2, 2014 One sector, one target, one message The pathway towards 100 EUR / MWh in 2023.
A future benefit for the South Cheshire infrastructure
Historical problems Tasks being done; just not coordinated and effective. No clear line of sight to client (Highways England) objectives. No defined asset.
A future benefit for the South Cheshire infrastructure
Self-evaluation template for GTM Alessandro Ischia, E-Control
Severn Tidal Power Feasibility Study
The ISLES Project Bob Hanna
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
RGF - Overview What is the Regional Growth Fund (RGF)
Release 3 Plan Options Decision
Coromandel Harbour Facilities Project
Release 3 Plan Options Analysis
NS4960 Spring Term 2018 U.S. Offshore-Wind Projects
Release 3 Update 13th February 2019.
FINANCING NATURA 2000 Agenda item 2.1 CGBN Co-ordination Group
TECHNOLOGY EXPLOSION TECHNOLOGY EXPLOSION. TECHNOLOGY EXPLOSION TECHNOLOGY EXPLOSION.
Confidential – Not for Distribution
KEC Dhapakhel Lalitpur
Energy Catalyst Round 7 Iain Wheeler Bid Manager 24th July 2019
Ireland’s Offshore Wind
Offshore Wind – Grid Delivery Models
Renewable Electricity Support Scheme (RESS) Update
IWEA Offshore Wind Conference, Dublin
Presentation transcript:

IWEA Offshore Wind Conference 2019 – Developer Led ‘v’ Centralised Grid Connections 12th September 2019

Developer Led ‘v’ Centralised Grid Connections Developer Led Key Characteristics: Developers fund costs to identify and secure rights on suitable offshore/onshore sites Bespoke connection applications made to TSO on a project by project basis. Grid access system facilitates individual connections on an agreed allocation basis Near shore projects can access strong near to coast transmission networks in the East and South much faster than centrally planned nodes. This allows projects that are successful in achieving planning consent to progress without being queued against projects that are offered grid but don’t achieve planning This is the successful connection philosophy used in UK offshore industry to date.

Developer Led ‘v’ Centralised Grid Connections Centralised Key Characteristics: TSO/TAO design consent and build common Offshore “Grid Hubs” TSO/TAO prioritises and effectively chooses the Offshore locations. There is a risk that this prioritises grid for projects that may not achieve planning consent. Developers compete to “win” rights to specifically allocated areas including their grid connection. Separate body for site selection required, not role a role TSO/TAO. Similar in nature to onshore Subgroups Preferred method of Utilities in Netherlands/Germany/Denmark (over a 20 year period), though hybrid connections have also been used in Germany, and Denmark is moving to near shore developer connections

Developer Led ‘v’ Centralised Grid Connections Developer Led Pros/Cons Pros Cons Facilitates faster build out of projects Potential for Sub-optimal use of Transmission Infrastructure Allows processing of connection applications for projects that have achieved planning consent and inefficient grid where projects don’t achieve planning May be additional cost to consumer Avoids creation of Subgroups which need critical mass to proceed May be overlap of applications in attempt to secure optimum sites Cost of site investigation borne by the developer. Developers can progress onshore grid route planning in parallel Higher cost and risk to the developer Developer planning application is holistic and covers site, onshore grid connections and onshore port upgrades and traffic surveys in a single application – no project splitting More onshore planning implications

Developer Led ‘v’ Centralised Grid Connections Centralised Pros/Cons Pros Cons Centrally planned use of transmission system High potential for longer timeframes from design to delivery. Timeframe for design by TSO/TAO delays projects submitting their planning until connection details are known. Risk of designing grid for projects that don’t achieve planning consent. Least cost solution to developer (and customer) “Subgroup” centralised solutions needs critical mass to proceed (Crory/Knockranny Subgroups delays). Sub groups not feasible for large offshore projects Areas of development more controlled Large cost to state in gathering data (seabed Geophysical and Geotechnical information) Less onshore planning implications for developer Higher potential for Project Splitting to be alleged for both the grid and the offshore planning applications Far-shore and weak transmission grid areas will need centralised transmission upgrades with longer lead times Could take longer than developer led approach

Developer Led ‘v’ Centralised Grid Connections DCCAE 70/30 – Terms of Reference: 1GW of offshore wind to be built by 2025 3.5GW of offshore wind to be built by 2030. Designing, consenting and building offshore hubs by TSO/TAO will delay offshore project planning applications, will delay grid connections and connection nodes. Climate action plan target of 9 months to achieve windfarm and grid planning consents from identification of suitable zones won’t be achievable under centralised approach – delays inevitable

Developer Led ‘v’ Centralised Grid Connections Proposed Solution to achieve the fastest and least risk Offshore delivery to contribute to 2030 targets and beyond: Phase 1 Legacy projects and those near shore in-development projects on the east/south coast proceed on a developer led basis. Phase 2 Centralised study for west/north coast commence to allow projects in these regions obtain grid access in late 2020’s/ early 2030’s Phase 3 Centralised study for far-shore projects to allow floating offshore solution gain optimal grid access once commercially viable

Developer Led ‘v’ Centralised Grid Connections Advantages of Proposed Solution: Allows in development and legacy projects in which significant investment has already been made proceed and enable State to achieve Climate action plan targets. Facilitates optimum design of Offshore “Phase 2 & 3” with west/north coast and floating solutions designed around a centralised grid connection method, allowing such projects to be delivered post 2030.

Developer Led ‘v’ Centralised Grid Connections Summary: Offshore Industry recognises benefits of centralised design solutions where projects are far shore or west and south west coast where the transmission system is weak However, If Ireland is to achieve its 2030 targets developer led solutions are the only option for legacy and in development projects. Prudent to begin process of implementing a centrally designed solution for Phase 2 and 3 projects now, with a view to delivering post 2030.