Prepared for CSC by Fred Borcherding FNAL

Slides:



Advertisements
Similar presentations
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
Advertisements

H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
Integration & Information Marc and Qian. USTC Laser Pulse TrainLaser Signal from Barrel TOF Counter.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
T1 Electronic status Conclusions Electronics Cards:
An Introduction to Open Space Method Andy Gibbs
EMU Slice Test Run Plan a working document.
Electrical and electronic systems projects
HF Test station at P5 A.Mestvirishvili.
HV & LV status LV system in W+1 and W+2 is OK
SCT/Pixel Draft Rack Layout rcj
Regional Cal. Trigger Milestone: Major Production Complete
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
CSC Electronics Installation and Commissioning CSCE I&C
Regional Cal. Trigger Milestone: Production & Testing Complete
Hardware Needs (Near Term)
B904 Status Report by Fred B.
RPC Detector Control System
New Calorimeter Trigger Receiver Card (U. Wisconsin)
TileCal ROD Commissioning Counting Room Installation
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
HV & LV status LV system in W+1 and W+2 is OK
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
TTC Fiber Distribution
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
B904 Status Report by Fred B.
CSC Electronics Installation and Commissioning CSCE I&C
CSC DSS Status Report by Fred B.
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
PCMB Address Assignments per Station/Rack/Crate
CSC Shift Training and Operation + B904 Status
Presentation transcript:

Prepared for CSC by Fred Borcherding FNAL 19-April-05 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL 19-Aug-2009 CSC - ESSC July'09

19-April-05 Points of Discussion Needed at B904 for CSC to participate in Global Running TTC - we have an operational TTC crate with modules in rack E1A20(?).  We would need a fiber from the Global TTC to our crate. CSCTF - we also have an operational CSC TF crate in rack E1A20(?).  We would need a connection between this crate and the GMT.  In principle this crate could be moved into a GT rack.  But then we would need a cable from the TF to the TTC to enable local running.  Or both the CSC TF and CSC TTC crates could be moved into the trigger racks. - Links from MS to GMT -> We have only two 8 m SCSI cables sitting in the box on the top shelf in 904 room. We need 4 for a full MS-to-GMT connection. FED - We have an operational FED crate.  We also have space for an FMM crate in the same rack.  Computers - We have local computers in rack E1A30 that are on an NFS cluster.  We can explore if it is best to move these to a CMS-B904 network from the CERN network. Other - We have operational HV and LV hardware as well as a local or CSC-DCS system.  Not Related to Global Running - We could use several (~6) fiber optic links from or racks in the integration row to our lab space.  We forsee there may be uses but have no definite need at this time. 19-Aug-2009 CSC - ESSC July'09