CR-GR-HSE-100 HSE Reporting

Slides:



Advertisements
Similar presentations
Accident and Incident Investigation
Advertisements

Lessons Learned from the Application of Risk Management in the Shipment of LNG.
Incident Management System Process Flow RESTRICTED All Staff and Contractors within scope of HSSE MS Line Manager and Contract Holders (Designated Incident.
HSE Performance of contractors
Accidents and Accident Reporting
Risk Assessment – An Essential Standard
Incident Reporting Procedure
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
1 Module: What Is Enviance? An Introduction to the Company, the System & this Training.
Integrating Security Design Into The Software Development Process For E-Commerce Systems By: M.T. Chan, L.F. Kwok (City University of Hong Kong)
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Incident Reporting.
CAKE Q3 BARRIER MANAGEMENT. CAKE Q3: BARRIER MANAGEMENT A barrier can be a technical, operational or organizational element that either separately or.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
Key Terms Business Continuity Plan (BCP) – A comprehensive written plan to maintain or resume business in the event of a disruption Critical Process –
Chapter 8 Risk Management Plans 8 Risk Management Plans C H A P T E R.
Reporting for... INCIDENTS APR/ SHE SUSA Julie-Anne Murphy measure2improve Tel:
Health & Safety Allen Hey / Tracy Owen. Health & Safety at Work Act 1974 Employer’s Duties Section 2 - Employers must ensure for their employees:  Safe.
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
1 Address: UIC Safety Database (SDB) System and Results.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
Utilizing Your Business Continuity Plan.
Incident Reporting And Investigation Program
Transport of Hazardous
An Overview on Risk Management
Incident Reporting What is an Incident? Should I report Incidents?
Important of Incident Investigation & Incident reporting
Business Continuity / Recovery
Risk Management Policy & Procedures
Risk management - HIRAC awareness presentation
#GoldenRules THEME-BASED CAMPAIGNS to ensure lasting awareness of the Golden Rules Accompanying deployment - July 2017.
#GoldenRules THEME-BASED CAMPAIGNS to ensure lasting awareness of the Golden Rules Accompanying deployment - July 2017.
HSE Case: Risk Based Approach.
CR GR HSE 501 – HSE Requirements for Contractors
Incident Investigations
Incident Reporting And Investigation Program
Root Cause Analysis for Effective Incident Investigation
Integrated Management System
Incident Reporting What is an Incident? Should I report Incidents?
RISK ANALYSIS Resource Documents
Incident Reporting What is an Incident? Should I report Incidents?
Database solutions Chosen aspects of the relational model Marzena Nowakowska Faculty of Management and Computer Modelling Kielce University of Technology.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Prime Contractor Performance
CR GR HSE 001 On-MAESTRO HSE Expectations
The project partners and their types
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Neopay Practical Guides #2 PSD2 (Should I be worried?)
CR-GR-HSE-415 Safety of Aviation Activities
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
CR-GR-HSE-412 Stakeholder and Local Impact Assessment
CR-GR-HSE-405 Industrial hygiene
CR-GR-HSE-801 Management of HSE Events and Return on Experience
CR-GR-HSE-302 Management of change
CR-GR-HSE-419 Safety of excavation works
CR GR HSE 501 – HSE Requirements for Contractors
Road Vehicle Driving Safety GROUP HSE RULE (CR-GR-HSE-404)
HSE Reporting GROUP HSE RULE (CR-GR-HSE-100)
CR GR HSE 001 On-MAESTRO HSE Expectations
Stakeholder and Local Impact Assessment GROUP HSE RULE (CR-GR-HSE-412)
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Safety of Aviation Activities REGLE HSE GROUPE (CR-GR-HSE-415)
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
CR-GR-HSE-404 : Road Vehicle Driving Safety
CR-GR-HSE-902 HSE Self-assessments and HSE Audits
Presentation transcript:

CR-GR-HSE-100 HSE Reporting M&S : which differences between CR-GR-HSE-100 and CR-MS-HSEQ-151?

REQUIREMENT OVERVIEW Requirement 3.1.1 : HSE Events Recording and Reporting Process All sites, activities, assets, and people linked to the Group, as well as transport, everywhere where the entity or affiliate’s responsibility and/or the Group’s image might be involved, are covered by a recording and reporting process of HSE events. This is specified in the requirements outlined below. Clarifications on the concepts of recording and reporting on: First aid/medical treatment classification, Telework and traffic accidents, Calculation method of KPI 4 concerning the number of anomalies reported, Technological risk indicators and the corresponding event description, Severity levels. Requirement 3.1.2 : Modification of Assets and Activities of the Perimeter In case of modification of the Group’s assets and activities (acquisitions, divestitures, cessation of activities, start-up of new projects), the rules listed below are followed (cf. CR-GR-HSE-100). No change

Actual Severity Level (ASL) Potential Severity Level (PSL) REQUIREMENT OVERVIEW Requirement 3.2.1 : Recording of HSE Event The following HSE events, with consequences (actual and/or potential) in one or more of the following domains: personal, environmental, material and financial, media are recorded in an HSE event management tool: Incidents and near-misses; Anomalies with a potential severity level ≥ 4. The recorded events are indicated with their actual and/or potential severity level. No additional requirement compared to CR-MS-HSEQ-151 Clarifications: the events of the operated domain to be recorded in RAMSES CENTRAL REPORTING TOOL are specified in the following table (no change with CR-MS-HSEQ-151). For the non-operated domain, significant severity events are recorded in the central reporting tool. Any anomaly corresponding to the failure of a critical safety barrier must be reported as an event and recorded in the central reporting tool with its action plan and planning (as anomaly of potential severity level ≥4 ). If this action is not solved within 3 months, the anomaly becomes an « Integrity threat » and must be declared and treated as such. Type of consequences Actual Severity Level (ASL) Potential Severity Level (PSL) Personal injuries ≥ 1 (≥ 3 for third party) ≥ 3 (≥ 4 for third party) Material consequences ≥ 2 ≥ 3 Environmental impact Media impact

REQUIREMENT OVERVIEW Requirement 3.2.2 : Losses of Primary Containment Recording Losses of primary containment are recorded in an HSE event management tool: If they are classified Tier 1 or Tier 2 according to API RP 754 and IOGP 456; or As soon as they reach the threshold of 1 barrel (159 L) for liquids, 100 kg for gas. Specifically for the E&P branch, losses of primary containment are recorded in an HSE event management tool as soon as they reach 60 kg for liquids and 1 kg for gas. No change: events to be recorded into the event section of the CENTRAL REPORTING tool, and to be entered in the statistical reporting Requirement 3.2.3: Detailed Reporting of HSE Events to the Group The following HSE events are subject to detailed communication to the Group via the Group's central reporting tools: HSE events with personal injuries of an actual severity level ≥ 2: FAT, PDC, LTI, RWC, MT; HSE events with other impacts and having an actual severity level ≥ 4; HSE events with a potential severity level ≥ 4 (HIPO); Tier 1 and Tier 2 losses of primary containment. No change: events to be recorded into the CENTRAL REPORTING tool (cf. requirement 3.2.1)

REQUIREMENT OVERVIEW Requirement 3.3.1 : Reporting of Numerical Data The entities and affiliates record and communicate to the Group the following data, according to the methods listed in appendices 8 and 9, thus allowing for the monthly calculation of safety and technological risk performance indicators: The number of work hours; The number of days away from work; The number of restricted work days; The number of anomalies and near-misses reported; The number of kilometers travelled during professional trips; The number of losses of primary containment; The number of fires, flashes, and explosions; The other data used to calculate the technological risk indicators. No change

Where to find additional information or documentation? Publication on WAT: http://wat.corp.local/sites/s215/en-US/Pages/Règles%20HSE/CR%20100/Nouvelle-règle-HSE-group--.aspx HSE toolbox: https://www.toolbox-hse.total.com/en/one-maestro REFLEX: group referential documents : https://reflex.sinequa.corp.local/ M&S Branch referential : http://crescendo4all.rm.corp.local/sites/Ref_MS/Pages/Home.aspx 6