C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna

Slides:



Advertisements
Similar presentations
17 February 2010 The Silicon Vertex Detector of the Belle II Experiment VCI 2010 M.Friedl, T.Bergauer, I.Gfall, C.Irmler, M.Valentan (HEPHY Vienna)
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Belle SVD status & upgrade plans O. Tajima (KEK) Belle SVD group.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6” Origami Module and Front End Electronics 6 th Open Meeting of the.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
The Silicon Vertex Detector of the Belle II Experiment
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
DAQ Scheme and Beam Test Results H. Asano, M. Friedl, H. Hyun, T. Higuchi, C. Irmler, Z. Natkaniec, W. Ostrowicz, M. Pernicka, T. Tsubuyama.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
25 Oct 2011 The Silicon Vertex Detector of the Belle II Experiment IEEE NSS 2011 Thomas Bergauer (HEPHY Vienna) Valencia.
The Mechanical Structure for the SVD Upgrade
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
Study of Belle Silicon Vertex Detector Intrinsic Resolution Saša Fratina, Jožef Stefan Institute, Ljubljana, Slovenia for Belle SVD group.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Florian Buchsteiner (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Markus Friedl (HEPHY Vienna)
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
The Silicon Vertex Detector of the Belle-II Experiment
Integration and alignment of ATLAS SCT
Design and fabrication of Endcap prototype sensors (petalet)
Radiation Laboratory Meeting
Comments to the SVD4 structure
Online Data Processing and Hit Time Reconstruction for Silicon Detector Readout C. Irmler, M. Friedl, M. Pernicka The KEKB factory (Tsukuba, Japan) will.
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna

TWEPP 2009, Christian Irmler (HEPHY Vienna) Contents Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

KEKB and Belle @ KEK (Tsukuba, Japan) Asymmetric machine: 8 GeV e- on 3.5 GeV e+ ~1 km in diameter Mt. Tsukuba KEKB Belle Belle KEKB Linac e+/e- linear accelerator + storage ring Center of mass energy: Y(4S) (10.58 GeV) High intensity beams (1.6 A & 1.3 A) 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Belle-II KEKB factory upgrade until 2013 Target luminosity of 8 x 1035 cm-2s-1 40 times the present value Accordingly increase of background Limitations of current silicon vertex detector (SVD2): Occupancy  need faster shaping Trigger rate (dead time)  need faster readout and pipeline Replacement of the SVD and its readout is necessary APV25 readout chip would fit the needs 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Comparison VA1TA – APV25 VA1TA (SVD2) Commercial product (IDEAS) Tp = 800 ns (300 ns – 1000 ns) no pipeline 5 MHz readout 20 Mrad radiation tolerance noise: ENC = 180 e + 7.5 e/pF time over threshold: ~2000 ns single sample per trigger APV25 (Belle-II SVD) Developed for CMS by IC London and RAL Tp = 50 ns (30 ns – 200 ns) 192 cells analog pipeline 40 MHz readout >100 Mrad radiation tolerance noise: ENC = 250 e + 36 e/pF time over threshold: ~160 ns multiple samples per trigger possible (Multi-Peak-Mode) Must minimize capacitive load !!! 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Shaping Time and Occupancy With hit time finding, we can cope with 40-fold increase in luminosity For details see poster by Markus Friedl 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Consequences for SVD Ladder Design up to 3 ganged sensors SVD2 ladders: Up to 3 ganged (concatenated) sensors are read out from the side Minimization of material budget, as hybrids are outside of acceptance SNR > 15 with VA1TA, but would be < 10 with APV25 Ganging of sensors does not work with APV25! 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Origami – Chip-on-Sensor Concept Prototype for 4” DSSD (later with 6” sensors) (readout connections not shown) Chip-on-sensor concept for double-sided readout Flex fan-out pieces wrapped to opposite side (hence “Origami“) All chips aligned on one side  single cooling pipe 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Origami – Details Thinned readout chips (APV25) on sensor Strips of bottom side are connected by flex fanouts wrapped around the edge All readout chips are aligned  single cooling pipe Shortest possible connections  high signal-to-noise ratio Total material budget: 0.72% X0 (cf. 0.48% for conventional readout) side view 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Belle-II SVD Layout 4 layers of double-sided strip sensors Double-layer of DEPFET pixels Tentative geometry New central pixel double-layer using DEPFET 4 strip layers of 6” DSSDs Every sensor is read out individually to maintain high SNR red: Origami chip-on-sensor concept green: read out by conventional hybrid (from side) 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Sketch of the Outermost Ladder (Layer 6) Composed of 5 x 6” double-sided sensors Center sensors have Origami structure Edge sensors are conventionally read out from sides ca. 60cm Structural element (Zylon) Cooling pipe Electronics for border sensor Connector (Nanonics) Flex circuits Electronics for border sensor Cooling block (end ring) 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) APV25 Thinning One wafer (319 good dies) thinned down from 300 µm to 106 µm and diced by French company EDGETEK / WSI Received 314 good dies (5 lost = 98.4% yield) 16 thinned APVs mounted onto 4 hybrids Compared to 1 hybrid with 4 standard APVs Measurement Results: All APVs show similar signal and noise figure Proper calibration curve No measurable differences between normal and thinned chips  Thinning has no effects on APV functionality and signal quality! Thinned APV25 Standard APV25 APV25 Calibration Curve 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Origami Hybrid – Final Layout Connectors (on both sides) 2 p-side APV chips 2 p-side APV chips 4 n-side APV chips Animal farm (mascots of creators) 3-layer flex hybrid design p- and n-sides are separated by 80V bias n-side pitch adapter is integrated in hybrid 3 pcs. of each type produced at CERN PCB workshop Flex fanouts to be Wrapped around the sensor edge 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Module Assembly 1 Hamamatsu 4” DSSD: top side: 152 µm pitch (z) bottom side: 50 µm pitch (rφ) Gluing fanouts onto bottom side: Custom jig (porous stone inlay) for gluing and wire bonding Two component epoxy paste adhesive Araldite® 2011 Aligning fanouts against sensor and hybrid Distance between flexes is important Wire bonding: Fully automated bonder F&K Delvotec 6400 Processing of bottom side is finished 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Module Assembly 2 Attaching APV25 chips onto hybrid bottom APV25 top APV25 APV25 calibration curves of Origami hybrid Attaching APV25 chips onto hybrid Two component conductive adhesive Alignment under microscope Gluing hybrid onto Rohacell foam There must be sufficient glue underneath the bond pads! Wire bonding of APV25 power and control lines Electrical test of hybrid some bad vias  mostly repaired with thin wires Hybrid PCB design is okay 7 of 8 APV chips are working well Excellent internal calibration results 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Module Assembly 3 Flip sensor and fanouts Using another jig  jig2 Jigs are stuck together with 3 alignment pins Turning over Remove jig1 Further assembling has to be done on jig2 Gluing hybrid onto top side of sensor Aligning pitch adapter to strips on sensor and fanouts Wire bonding between sensor and integrated pitch adaptor 2 openings to protect bottom side bond wires 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Module Assembly 4 Bending & Gluing of fanouts Using positioner equipped with a custom tool Easier than expected Allows precise positioning w/o damaging underlying wire bonds Wire bonding between APVs and pitch adaptors Attaching cooling pipe Thermal conductive paste Electrically isolating pad between APV and pipe 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Final Origami Module Origami concept already presented at TWEPP 2008 Prototype completed beginning of August 2009 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Beam Test Setup CERN SPS beam line Aug. 09 120 GeV π+ / p / K+ Cooling: 13 °C water beam Origami Module Together with different types of Belle DSSD prototype modules cooling system 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Beam Test Results Origami Module has been tested for several hours Good performance w and w/o cooling (13 °C water) About 80 GB data recorded Analysis is in an early stage  results preliminary Benefit of cooling: ~ 10% higher SNR Preliminary 120 GeV/c π+/p/K+ w/o cooling cooling (13° water) p-side n-side Average cluster width 2.2 1.8 Cluster SNR 11.5 16.7 12.8 18.5 Cluster SNR = S strip_signal / ( sqrt(cluster_width) * noise_avg) ~10% higher noise compared to 2008 beam test for all modules (ground loop in the front-end and / or HV supply?) Hence SNR of all modules is slightly worse than expected 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Beam Test Results 2 Time resolution achieved in beam tests with several different types of Belle DSSD prototype modules (covering a broad range of SNR) SPS 2009 data matches previous beam test. 2...3 ns RMS accuracy at typical cluster SNR (15...25) Origami shows similar precision like other modules (TDC error subtracted) Origami Module 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Motivation “Origami” Chip-on-Sensor Concept Prototype Assembly Beam Test Performance Summary & Outlook 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) Summary & Outlook Motivated by KEKB upgrade and Belle II Concept for low-mass double-sided readout with cooling Thinning of APV25 chips does not affect its functionality Successfully built the first prototype of an Origami module Module showed excellent performance at beam test Beam test analysis is still ongoing Next goal: We want to build a prototype of the outermost layer of Belle-II SVD 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

 Thank you for your attention  23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

TWEPP 2009, Christian Irmler (HEPHY Vienna) BACKUP SLIDES 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Origami Material Budget X0 comparison between conventional and chip-on-sensor: +50% increase in material, but also huge improvement in SNR Trade-off between material budget and SNR According to simulation, additional material is prohibitive in innermost layer, but no problem for layers 4-6  OK with layout 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)

Origami Hybrid – Flexes 23 September 2009 TWEPP 2009, Christian Irmler (HEPHY Vienna)