Mon 8/8 – Tue 9/8 Stable beams #2009

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tue 9/8 – Wed 10/8 Stable beams # :18 RQT12.R7B1 trip. End of STABLE BEAMS # ~86 pb -1 in ~19 hours 20:30 No beam from PSB (RF problem in ring.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 32 Started with luminosity production…
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Power cut 18kV cable for EMD404/E9 is heating
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Scrubbing progress - 09/12/2012
Mike Lamont, Jorg Wenninger
LHC Operations overview Week 28 – Getting back
Sunday morning Recovering from 400 kV disturbance.
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
IP8 aperture measurements (07:30-10:30)
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday 14:30 Fill 2011 dumped.
Friday :47 stable beams fill 3273
Saturday Luminosity production 1380 bunches
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Mon 8/8 – Tue 9/8 Stable beams #2009 10:20 Damper VB1 and HB2 trip  Vacuum control crate for the gauges in the damper area needed reset  OK S12: lost temperature reading of heating of current leads of RQ8_R1B1/B2. But the current leads are properly cooled  reset during ramp-down (SEU?) 18:10 Beam dumped, S81 trip. Integrated luminosity ~76 pb-1. Investigations on Sector 81 trip (Quadrupole loop) + reset of a BLM crate delaying refilling 23:30 STABLE BEAMS#2010. Initial luminosity 2.05x1033

Sector 81 trip From the QPS team (Knud, Mike): Conclusion: the loop of RQD.A81 opened at 18:05:46.955. This was not due to the EE switches, not due to (board A of the) nQPS, not due to the lead protection and not due to the (board A of the) oQPS (since no PM file was created). What caused the breaking of the loop then? We still do not know. It could be the board B of a QPS board. Action: leave things to board A for now. Move the whole sector to board B as soon as convenient.

Sector 81 trip

Stable Beams #2010 Slightly higher bunch population (1.26x1011 p). No significant increase in luminosity

Stable Beams #2010 Lower lifetime B1 Longer bunches

Temperatures

Temperatures

Plan ...increase adiabatically bunch intensity. Keeping an eye on temperatures.... Loss maps towards the end of the week

Pending SPS magnet: could hold until the technical stop Auto reset for cryo-valves in IR5/7 (3 hours – no access) MKI2 (access – 2 hours) Swap Board AB for nQPS QF/QD Sector 81 Oil leak warm compressor point 4 – require reconfiguration of point 4 (2-3 hours stop)