Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.

Slides:



Advertisements
Similar presentations
Progress and Plan for Superconducting RF Cavity RF Group.
Advertisements

Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ESS cavities interfaces
Cavity degradation after vert. test on the way or in the module, James Kerby ~10% agreement in results across laboratories typical ~20% degradation VT.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
The ESS Linear Accelerator
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
HIGH-BETA CAVITY DELIVERY P McIntosh ASTeC, STFC Daresbury Laboratory ESS Technical Advisory Committee Lund 1 – 2 April 2015.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
LASA status for medium-beta cavity Paolo Michelato.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 23 rd June 2015.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Quality Plan Documentation Management & Non Conformities ESS PDR, INFN-LASA, 19 May 2016Laura Monaco, INFN LASA.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
WP High Beta Cavities Delivery
Crab Cavity Technical Coordination meeting:
Strategy and Status of Reference Cavities for European XFEL
Status of the M-ECCTD F. Peauger - P. Bosland
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
ESS cavity procurement via in-kind contributions
WP5.1 Professional training and apprenticeship (CEA, DESY, INFN)
T5.2: Harmonization - Material and Component Reference
DESY Experiences on Use of Gas overlay during Assemblies
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Documentation (XFEL Naming convention, uploading…)
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Infrastructure inventory and use
Documentation process in WP 4 & 5 Goal: To collect all documentation needed in a structured way for the ESS Accelerator installation, commissioning, operation.
Acceptance criteria for cleanroom infrastructure
EZ Infrastructure for SC cavities production
Test stand preparation and EMR "live" data summaries
HWR Cavities for China ADS
ESS – RF checks up to cavity operation readiness in tunnel
RF-Dipole Cavity Update
BrightnESS – SE Hub (LASA)
Degradation and possible sources Statistic of resonators
Retreatment of Superconducting Cavities for the European XFEL
SRF Frequency data flow (focus on elliptical)
SPOKE Cavities frequency preparation plan and RF control procedures
Installation Binder / IRR – an example
A. Bignami on behalf of LASA SRF Group
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Incoming inspection of the cavities at saclay
ESSI CHANGE AND nonconformity control SYSTEM
ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.
STATUS of INFN contribution to ESS-accelerator
Quality assurance and Quality control organisation
How Do We Define Acceptance of a Cryomodule? - A Discussion
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
High level ESS SRF test plan
Presentation transcript:

Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25 - 26 June 2019

Overview The external QC Flow and managing of documents/info NCRs Subcomponents, Al1, Al2, Al3 at the cavity producer Al4 for cavity qualification Al5 for cavity handover to ESS Flow and managing of documents/info Alfresco (INFN DMS) collaboration with LNS DataBase collaboration with LNS NCRs Any deviation from the “standard cycle” If relevant to interfaces or cavity performances need an ESS approval Fast Communication and Tracking of info RT tracking system between INFN and cavity producer for exchange of info (BCP adjustment, etc.) and promptly reaction to NCR

The QC: The Acceptance Levels EC PC IC Mxxx ID PD CD EGP EGC

The QC: The flow of documents

The QC: how we manage (doc flow and status) Input/output: INFN EZ DESY CEA ESS

The QC: how we manage docs status and production data DashBoard Tool Subcomponents Doc Status Cavities Subcomponents Analysis

Fast communication (ticketing system) Used for: Tracking all events (and discussion) related to the cavity production (INFN-EZ) Prompt feedback to cavity production (BCP, RF issue, etc.) Fast and tracked communication of NCR (deviation from the standard cycle)

Number of documents for Subcomponents & Al1-Al3 Subcomponents Documents Mechanical, RF, 3D surface IC, PC, EC (after deep drawing) ID, TD, EGP, EGC (before trimming) ID, PD, CD, EGP, EGC (after trimming) For one cavity in total we have 52 docs + (3D docs) Measurements can be repeated for cross-check or for after subcomponents reworking (INFN request) Cavities Documents (Al1) Mechanical production of the cavity: Mechanical, RF, Leak check, inner and outer visual inspection In total 7 documents For “special cavities” we reached up to 13 docs EC PC IC Mxxx ID PD CD EGP EGC

Number of documents for Subcomponents & Al1-Al3 Cavities Documents (Al2) Surface treatments of the cavity and tuning Bulk BCP (+ US cleaning and rinsing, HPR, etc.), Annealing, Mechanical, RF, Leak checks In total 32 documents For “special cavities” we reached up to 54 docs Cavities Documents (Al3) Cavity Integration: RF, Leak check, Pressure test, Mechanical, Transfer Measurements Cavity final treatments: Final BCP, 12h HPR, assembly of accessories Cavity Certificate of Conformity (EZ) In total 44 documents For “special cavities” we reached up to 68 docs EC PC IC Mxxx ID PD CD EGP EGC

Number of documents for Al4-Al5 Cavities Documents (Al4) Cavity qualification (performances at cold) Incoming/outgoing, RF spectrum before and after transport, Q0 vs Eacc and HOM at cold In total 6 documents Cavities Documents (Al5) Cavity Handover to ESS (CEA): Outgoing/incoming, RF spectrum before and after transport Docs taken from previous Als In total 19 documents Collection of Al5 Docs

NCRs (Non Conformity Reports) NCRs subcomponents & cavity production (including also interfaces requirements) 96: Total number of NCRs emitted by EZ Approval INFN only -> if no impact on interfaces Approval INFN only after the ESS approval -> if related to interfaces NCRs related to interfaces 20: Total number of NCRs emitted by INFN ESS approval -> if related to interfaces NCRs doc management Alfresco is not used for the NCRs flow (acceptance, etc.) Alfresco will be used only for the storing of NCRs (once closed)

Actual Document Status Today status: Subcomponents (all HCs deep-drawn & measured): IC, PC, EC: 1045 ID, PD, CD, EGP, EGC: 779 Cavities: Al1: 150 (21 cav) Al2: 440 (12 cav) Al3: 378 (9 cav) Al4: 24 (4 cav) Al5: 62 (4 cav + the on-going)