Documents agreed by the CG

Slides:



Advertisements
Similar presentations
CMEF Requirements for the Monitoring tables as part of the Annual Report RD committee 24/10/2007.
Advertisements

Pre-Preparatory Phase : JULY- DEC Meeting with the Agri Dev’t Board of Davao City on the proposal to update the Five-Year Davao City Agricultural.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Slide 1 EVALUATION AND IMPROVEMENT Conduct evaluation and make necessary adjustments to facility plan. INITIAL DISCUSSIONS Air Traffic Manager and Facility.
Making the zonal system work -Feedback from Southern Zone-
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
AMVA4NewPhysics Moving forward T.Dorigo June 4th 2015.
ITU-R Liaison Group Report - Session #62 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0072 Date.
Communication Committee CSC Report July Committee Purpose Improve communication within CoDA, both up and down the inverted pyramid Work towards.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
System Description Document Development Process – A Proposal IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-07/197.
Draft model for the Annual and Final implementation report under the Investment for Growth and Jobs goal 12 th meeting of the Expert Group on Delegated.
Users' Requirements During Algorithm Development
SLHC – PP Budget April 3rd, 2008 CERN April 2, 2008 M.C.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
CEGH GAS EXCHANGE.
Current status of Shift2Rail
Content of Tender Dossier Instructions to Tenderers
IWG TYREGTR 16th Meeting*
DRAFT TRANSPORT, ENVIRONMENT & HEALTH CHARTER Department of Transport
Nominations.
Business Practices Subcommittee Update
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Overview of the FEPAC Accreditation Process
EU Regulation on AVAS requirements
UA – Same biocidal product SPC translation review
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
Handling the “stop of the clock” in product authorisation
(Follow-up of the discussion at the 66th CA meeting)
Some questions from Industry:
Management of product authorization for in situ cases (IGS)
ITU-R Liaison Group Report - Session #62 Opening Plenary
ESF Informal Technical Working Group
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
TRAINING GRANT TIMELINE
Housing Standard Review & Building Regulation changes
Session # n GRIDMAN TG Closing Report
Session # n GRIDMAN TG Closing Report
State of play in the EU for criteria to identify endocrine disruptors
Transmitted by the IWVTA Informal Group
MRSO Update James Long MRSO.
4.5. Use of the same trade name in different products
Scope issues and referrals to the CG - background
Smart Grid Teleconferences – Jan-Mar 2011
<month year> doc.: IEEE < e> <January 2019>
Revision of the technical annexes of the BPR
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Report to 176th WP.29 session from the 34th IWG on DETA meeting
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Recommendations to facilitate assessment of new application procedures
Quality reporting under Regulation (EC) No 1165/2008
Review of the 1958 Agreement
Wrap up of agenda item no. 3
Why a „test phase“? Overview
Handling the “stop of the clock” in product authorisation
Education and Training Statistics Working Group, May 2011
Adult Education Survey Anonymisation Point 6
BPR AS Review Programme
Review of the Community Council Scheme of Establishment
Editing Board Meeting Status Expert Groups (Transmission, Axle)
Performance Reviews May, 2019 Dr. René E. Quiroz, Workday Services.
WP on the implementation of the Biocidal product family concept:
Inputs Regard to “Test Phase” to TFCS
Adolfo Perujo (IWG chairman)
11th Steering Group Meeting 28th October, Ulm
Report to 178th WP.29 session from the 35th IWG on DETA meeting
TGn Editor Report Sept 2007 Date: Authors: Sept 2007
OBD GTR phase2 Roadmap.
Jella Kandziora, JUELICH Oslo, January 29th, 2019
Jeannette Monier and Louise Reid
Presentation transcript:

Documents agreed by the CG CA-March29-Doc.4.7.b Documents agreed by the CG Document Agreed Applicable as of Grouping of co-formulants CG-30 3 July 2018 Best practices for BPF pre-submission meetings Splitting of families 26 September 2018

Documents tabled for agreement during the CG-34 Applicable as of Similarity of composition To be agreed by the CA meeting…. ….. input from CG members at CG-34 Similarity of uses (including matrix) Similar level of risk and efficacy

Applicability of documents agreed by the WP Approach agreed in the CA document CA-July12-Doc.6.2d-Final: the 2 years cut-of applies Lack of harmonised approach in the short/mid-term. MSs may apply different approaches May result in high number of referrals Lack of level playing field between applicants Option 1: Option 2: Earlier application* of the documents to BPF applications: to be submitted after CA agreement on an earlier application? still under evaluation (e.g. “x” months before the draft PAR is sent to the applicant)? Products/uses failing the similarity check can be handled according to document “splitting of families” For applications being in the latest steps of the evaluation phase (see above) or in the MR phase, no referrals are submitted based on the latest documents; the structure of the family is reconsidered at the renewal * This might require a slight amendment of document CA-July12-Doc.6.2d-Final