GridLAB-D Workshop: Electrification Study

Slides:



Advertisements
Similar presentations
Roof Savings Calculator Overview Joshua New, Ph.D. Whole Building and Community Integration Group Building Technologies Research and Integration Center.
Advertisements

eQuest Quick Energy Simulation Tool
DOE-2 Overview and Basic Concepts. Background  US public domain programs from 1970s Post Office program; NECAP (NASA energy- cost analysis program);
Planning your Xythos upgrade Xythos Webcast Series Dial-in Information: Toll-free Passcode:
1 Proposed Revision to Energy Star New Homes Deemed Savings September 19, 2008.
Downloading, Installing, and Working with Dropbox.
SEEM Calibration for Multi-Family Buildings Regional Technical Forum September 18, 2012 Analysis Performed By Ben Larson, Jon Heller, Henry Odum, and Carmen.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Energy Calculations Dr. Sam C M Hui
Load Forecasting Eugene Feinberg Applied Math & Statistics Stony Brook University NSF workshop, November 3-4, 2003.
Committing to the future easyEmission – step 2 Software set-up for Engine Testing.
Electric / Gas / Water Eric Fox Oleg Moskatov Itron, Inc. April 17, 2008 VELCO Long-Term Demand Forecast Methodology Overview.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Policy: Zero Net Energy Homes in 2020 Martha Brook, P.E. High Performance Buildings.
SFT 2841 IN CONNECTED MODE Prepare setting files.
CALRES Update Phase 1 Progress Report April 22, 2009 Bruce Wilcox Phil Niles Ken Nittler.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Digital Intuition Cluster, Smart Geometry 2013, Stylianos Dritsas, Mirco Becker, David Kosdruy, Juan Subercaseaux Setup Instructions Overview 1. License.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Appliance Measure Updates Danielle Gidding Bonneville Power Administration.
ELECTRICITY SOURCES Twenty five percent of the state’s electricity comes from out-of-state generation.
Configuring IQmol for Windows machines, use version!
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
1 Software Reliability Analysis Tools Joel Henry, Ph.D. University of Montana.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Renesas Technology America Inc. 1 SKP8CMINI Tutorial 2 Creating A New Project Using HEW.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
Energy Efficiency Forum Energy Efficiency Forum En ergy Savings: Where to Find Them September 27, 2006 Jim Parks, Program Manager Energy Efficiency and.
Methodology for Demand Forecasts for Bandera Electric Cooperative, Inc. Brian D. Bartos, P.E. Manager, Engineering Presented to ERCOT Reliability & Operations.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Debugging Lab Antonio Gómez-Iglesias Texas Advanced Computing Center.
Installing git In Linux: sudo apt-get install git In Windows: download it from run the setuphttp://git-scm.com/download/win.
1 Proposed Revision to Energy Star New Homes Deemed Savings September 19, 2008.
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
CS5220 Advanced Topics in Web Programming Version Control with Git
UDAcademe is a faculty activity records management system that provides a single convenient place for faculty members to archive their achievements.
Building Environmental Systems
Universal tool of data validation for support of implementation projects of ERP systems Yuri Byteryakov July 31, 2017.
August ICA Agenda Time Topic 8:00 – 8:15
Installation and Training
Lecture Announcement Developing Concrete with a Structural and Thermal Insulation Performance and Homogenous and Stratified Approach Dr. Mauricio Lopez.
California Energy Demand Electricity Forecast (CED 2014) Update: Method and Summary of Results November 5, 2014 Chris Kavalec Demand Analysis.
Dynamic Web Page A dynamic web page is a kind of web page that has been prepared with fresh information (content and/or layout), for each individual viewing.
Macaualy2 Workshop Berkeley 2017
EPANET-MATLAB Toolkit An Open-Source Software for Interfacing EPANET with MATLAB™ Demetrios ELIADES, Marios KYRIAKOU, Stelios VRACHIMIS and Marios POLYCARPOU.
High Efficiency X-band Klystron Design Study
Load Model Data Tool Development Update
Welcome to our first session!
Objectives Discuss Project 1 (eQUEST) Learn about HVAC Systems
Demand Response and Kootenai Electric Shawn Dolan, P.E
Resource Adequacy Demand Forecast Coincidence Adjustments
Residential Water Heater Market in CA
Assessment of the Energy Savings Potential of Daylight Utilization and its Impact on a Building Energy Performance Hermano Bernardo Vienna, 2010.
Lecture Objectives: Review linearization of nonlinear equation for unsteady state problems Learn about whole building modeling equations.
Using Github.
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Transmission System Update
Using the Omega3P Eigensolver
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Project: Wiring a Building
WinSLAMM Batch Editor Module 23
GridLAB-D and OpenDSS: Better Together
Getting Started with GridLAB-D on the Cloud
GridLAB-D Workshop: Tariff Design Study
OpenFIDO Berk Serbetcioglu (SLAC) CEC Advanced Simulation Program
Grid Resilience and Intelligence Platform (GRIP) Use-case
Presentation transcript:

GridLAB-D Workshop: Electrification Study Alyona Ivanova (SLAC) CEC Advanced Simulation Program 5 September 2019 This presentation was prepared with funding from the California Energy Commission under grant EPC-17-046. SLAC National Accelerator Laboratory is operated for the US Department of Energy by Stanford University under Contract No. DE-AC02-76SF00515

California Electrification Study Objective Estimate feeder loading impact Methodology Simulate homes before and after upgrades Compute feeder load before and after upgrades Approach Use GridLAB-D to model a simplified 1MW feeder with 99 homes Evaluate impacts at various levels of electrification

Electrification study customizable parameters Location: San Jose CA Day: Winter peak (Jan 20) Weather: TMY3 Base case: 40% electric heat, hotwater, cooking, drying Study cases: 50%, 60%, 70%, 80%, 90% and 100% electrification of all enduses Objective: Impact of the feeder load

Methodology GridLAB-D Version: 4.2.0-190828 Model structure: 99 homes + 99 residential meters + feeder Residential model: ETP Enduse loadshapes: EIA 2015 Home thermal integrity 100% electric: Good Gas enduses: Above normal Electrified enduses: Very good Simulation timestep: Variable

Home Thermal Integrity Normal Above normal Good Very good Roof R-value 30 48 Wall R-value 11 19 22 Floor R-value Door R-value 3 5 Window R-value 1.7 2.1 3.2 Ventilation rate 1.0 0.5

Overview of how to run the study Login to your GitHub account Create your electrification study project by cloning the template project Modify the study parameters, e.g., Change the city Change the study day Change the study cases Login to CircleCI Setup your new project Download the results Feeder winter-peak load Feeder time series data of the power profiles for each simulation case

Repository location : aivanova5/electrification_study

Getting started with electrification study

Fork the repository

If already signed in...

First Run!

Check on the progress...

Success!

Look at and download the output (Artifacts)

Output plots Raw data

Time series plots of substation feeder

Percent electrification vs Max power on substation feeder

Customizing your simulation Back to GitHub...

Locate the fork of `electrification_study` repository

2. Find the configuration file: config/simulation_configuration.csv

3. Edit the ‘simulation_configuration.csv’ file

simulation_configuration.csv Total Number of Houses per Phase 3 phase circuit (total houses simulated = 3x total number of houses per phase) Start and Stop time of the simulation Weather file All available locations can be found in “data/” folder

simulation_configuration.csv Simulation runs: Define the baseline electrification. The additional runs will use the baseline value to calculate the number of homes upgrades versus vintage. Once baseline is defined, list the run names and percent of homes of total number of houses per phase that are electric Model name is customizable (Except for “Baseline Run”) Number of runs can be reduced and increased by removal or addition of “Run” Lines

Commit the change Edit directly in this window Describe the change Clicking commit will trigger simulation in CircleCI

Check the progress of the new simulation (circleci.com)

Troubleshooting

Updating your fork with changes made to aivanova5/electrification_study If patches have been issued to the model they will appear in the original source (aivanova5/electrification_study) To absorb those changes, the source code has to be sync’d with your fork

Go to your forked repository

Review changes

Check that the updates appear in the code

This will trigger another CircleCI build

If there was a problem with CircleCI Run You can trigger another build with the same configuration by re-building from within CircleCI