WP15 budget changes linked with Matching Section

Slides:



Advertisements
Similar presentations
Jenny Yoon Period 3.  Go to Mr. Rylaarsdam’s website  virtualenterprise/default.aspx  Find the “VE Personal.
Advertisements

1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
This tutorial will show you, step by step, how to upload a file to Moodle.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Course Orientation Tests & Quizzes Tool. If the instructor has added “Tests & Quizzes” to the course as a form of assessment, click on the link in the.
2 R&R Subaward Budget Attachment Form Use for detailed budget from any consortium grantee only when the prime is submitting detailed budget Do not use.
Collecting Basic Evaluation Information Chapter Six cont…
1CUL.PPT Last Revised: 10 June 2005 The Role of the Communications Unit Leader Developed as part of the National Emergency Services Curriculum Project.
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
MISalt – Improving winter service plans MISalt – Improving winter service plans
Site survey (hands-on). Configuration 1 A financial institution (part 1 - Headquarters) Position - 2 C F E B C F E E F No Communications Acceptable Poor.
R ELEASE P LANNING. H ELPFUL R ESOURCES Planning Extreme Programming, Kent Beck and Martin Fowler Extreme Programming Installed, Ron Jeffries, Ann Anderson.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
E. Todesco HL-LHC: OUTLOOK ON PROTECTION FOR IR MAGNETS (WP3) E. Todesco CERN, Geneva Switzerland CERN, 23 rd April 2015 MPE meeting.
Image task, Set and Lighting Year 11 Revision. Look at the images you have been given: Write 1 comment about the costume Write 3 descriptive words about.
1 Electronic Approvals for Work Requests Tom Nikles Customer Solutions and Support (CSS) 10/21/
1 An experimental ISP for ICT for France 28 June 2006 STESWP Task Force on Services.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
0 Pre Trip – Link to an Expense Report. 1 Pre Trip – Link to Expense Report When creating a New Expense Report that includes an airline ticket, click.
LIU budget cuts – SPS savings? First brainstorming discussions!!! BG 30/4/14.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
EMI INFSO-RI EMI Documentation Emidio Giorgio (INFN Catania) NA2 Leader 2 nd All Hands Meeting May 31th, Lünd.
Philip Schwarz TE-MSC-MNC 1 Engineering Specifications for ELENA ring and TL magnets Philip Schwarz on behalf of WP 2.2 ELENA IIC meeting 5 th December.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
Section meeting PH-DT-EM2 Agenda  Short presentation (tour de table)  General information news  Future projects  Discussion  Coffee and cake PEREZ.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
Discussion about the technical specification of the Nb-Ti strand and Rutherford cable for the MCBXF corrector magnets.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Cost Page 1. To begin class: Have students do ESTIMATION TASK (allow about minutes)
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Dominique Bodart TE/MSC/MNC TE/MSC/MNC Preliminary magnet review of the linac 3 Ion Beam Line and Leir for the 10 Hz injection upgrade.
Publishing research in a peer review journal: Strategies for success
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
Relocation Services and Equipment Modification Services
TE-EPC internal review of the ELENA project
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Brief Status SPS Prototype PSB Prototype Installed in LS1
Equipment simplified model SMR UR safety
EC Activities Status for the LIU
Comparison between 1) HL-LHC BASELINE: Q5 at point 6 at 1
WP1 Metrology & Alignment
Elimination of Hospital Acquired Pressure Ulcers (HAPUs)
How to Use the Continuous Improvement and Monitoring System (CIMS)
Detailed global view on protection and detection of the circuits
Low Power Latency Reduction
Chapter 6 Sign Components
Websites (4).
A CHRISTMAS CAROL – character revision – choose your level of difficulty! EXTRA HOT TASKS Examine 3 minor characters and explain why you think Dickens.
Look through learning goal and answer one question
Task: Have a look at these websites:
Timed Paper 50 minutes to complete. Begin – 11:30. End – 12:20.
Revision of FDT Frame and Device Files
Where We’re Going Problem Definition Value Proposition Tasks
Spoken Language Controlled Assessment
All non-conformances must be resolved by identifying the root cause and defining the action(s) taken to prevent recurrence. In addition, the immediate.
OUR BOOK FAIR IS COMING SOON
Scenario 1 PERSON 1 PERSON 2 PERSON 3 Costs £50pw Budget: £75pw.
OUR BOOK FAIR IS COMING SOON
A. Tsinganis, F. Cerutti (EN/STI/FDA)
In the Nadcap system, there are two types of non-conformance: major and minor, as defined on this slide. A key thing to note is that a minor NCR such as.
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
Michele Martino – Jean-Paul Burnet
HL-LHC New MS optimisation WP9, Preliminary cost estimates
HL-LHC Post MSO optimisation, Complementary considerations for Q4
Education and Training Statistics Working Group – 17 June 2019
Presentation transcript:

WP15 budget changes linked with Matching Section Optimisation as presented on the 29th of June WP Task Comments Savings WP15 (kCHF) Indicative savings in D&I costs of other WPs (kCHF) To be confirmed by the WPLs WP3 Q6 de-installation No longer needed Indicative value for WP3 quoted from EDMS 1963965 v.1.0 Values should be revised and confirmed by WPL 69 4 Q6 installation 60 339 WP6B Installation of PC in the RR Reduction in number of correctors of Q4-Q5 Minor cost WP7 De-installation and re-installation of DQR Quoted in EDMS 1963974 v.1.0 30 QDS cabling for correctors Cables for Q6 Qheaters and other MPE equipment This is a reduction of extra cost Indicative value for WP7 quoted from EDMS 1963974 v.1.0 235 WP9 De-installation of QRL and installation of QRL/QRLJ Too soon to tell if there is any difference, safer to keep estimate n/a Total 159 kCHF 578 kCHF (of which at least 235kCHF are avoided extra costs)