22-SAR MEBT Vacuum test Aitor Zugazaga Zamudio, 27 March 2019.

Slides:



Advertisements
Similar presentations
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Advertisements

Requirements Structure and Status for NCFE
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
ESS DTL beam commissioning
Vacuum Controls Status MACS week December 2010 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
 automotive - carburetion and controls  biological - pharmaceutical distillation  braking - trains  cathode ray tubes  environmental controls and.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
Expected results PS Test Bench – in vacuum SPS Wire Scanner – not in vacuum Resistance Measurement.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
ESS-Bilbao: MEBT vacuum standarization
Developments of the FETS Ion Source Scott Lawrie.
CMS TAXS REGION D. Brethoux, M. Lazzaroni, F. Sanchez Galan, WP8 meeting
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
The ESS high intensity proton source and the LEBT: status, planning & open points L. Celona on behalf the LNS team Istituto Nazionale di Fisica Nucleare.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
NICA injection complex status
SVC Bulletin for DVM PLUS 2 & 3 [The margin of Oil in the Compressor]
Experience with beam instrumentation at Linac4
Figure 17.1 (a) As an engine is accelerated under a load, the engine vacuum drops. (b) The relationship between absolute pressure, vacuum, and gauge pressure.
SAES Project: Combination of NEG module and sputter ion pump
Lesson learnt – WP3 S. Gammino.
Accelerator layout > 1000 components (almost 300 magnets and power converters, 153 beam diagnostic devices, about 400m of vacuum pipes, a not neglectable.
Naming convention Rules
LINAC4 LEBT beam size and emittance diagnostics
Tom Shea Front End Meeting Catania
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
UITF beamline installation
RF test results of SRF cavity evacuated with NEG pump
TTC Hot Topic Common Questions
Andreas Jansson, Lali Tchelidze
One quarter of RFQ vessel + vacuum pumps and supports
Undulator Vacuum System
ESHAC meeting October 1-2, 2018
RF Distribution for Warm Linac
commissioning and measurements
Instructions: Adding refrigerant fluid to system
RF Local Protection System
ESS Bilbao RF Systems Overview Pedro J. González
Ion Source and LEBT control system topology, Interlock strategy
Undulator Vacuum System
Operations Section Leader
ISRC and LEBT Vacuum System Design
THE STATE OF BEAM DIAGNOSTICS
Testing Coordination at ESS
MEBT FC, WS, SC and EMU Status
LEBT water cooling system
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
BSM S. Grishin (installation manager),
MEBT SAR BUNCHER CAVITIES
UITF beamline installation
BI/Vacuum Mechanical design
SAR MEBT Bilbao March Mats Lindroos
ISrc & LEBT – ICS Installation Readiness Review
Procedure for MEBT installation in the accelerator tunnel at ESS
Project Support Meeting January 9, 2019
Presentation transcript:

22-SAR MEBT Vacuum test Aitor Zugazaga Zamudio, 27 March 2019

WORK AT ESS Assembly inside RAFTS RAFT 1: Wire Scanner RAFT2 (x3): Ion Pump + Gauge RAFT 4: Wire Scanner + Ion Pump + Valve + Burst disk + Gauge + NPM? (x2) RAFT 6: Wire Scanner RAFT 8: Faraday Cup + 2x EMU Grid + BSM + NPM? (x2) Connection between RAFTS 9x CF40: RFQ-RAFT1-RAFT2-RAFT3-RAFT4-RAFT2-RAFT6-RAFT8-RAFT2- RAFT9 1x CF63: RAFT9-DTL 22-SAR MEBT Vacuum test

RAFT 1 Wire Scanner Aluminium wire 22-SAR MEBT Vacuum test

RAFT 2 Ion Pump + Gauge CF63 CF40 22-SAR MEBT Vacuum test

RAFT 4 Wire Scanner + Ion Pump + Valve + Burst disk+ Gauge CF40 Aluminium wire CF40 CF63 CF40 22-SAR MEBT Vacuum test

RAFT 4 2x NPM? CF63 CF63 CF63 CF63 22-SAR MEBT Vacuum test

RAFT 6 Wire Scanner Aluminium wire Aluminium wire 22-SAR MEBT Vacuum test

RAFT 8 Faraday Cup + 2x EMU Grid + BSM CF100 CF100 CF100 CF100 22-SAR MEBT Vacuum test

RAFT 8 2x NPM? CF100 CF100 CF100 CF100 CF100 22-SAR MEBT Vacuum test

CF40 RFQ-RAFT1 22-SAR MEBT Vacuum test

CF40 RAFTX-RAFTY 22-SAR MEBT Vacuum test

CF40 RAFTX-RAFTY 22-SAR MEBT Vacuum test

CF40 RAFTX-RAFTY 22-SAR MEBT Vacuum test

CF63 RAFT9-DTL 22-SAR MEBT Vacuum test