Combination of reprocessed orbit, clock and ERP products

Slides:



Advertisements
Similar presentations
Effect of Surface Loading on Regional Reference Frame Realization Hans-Peter Plag Nevada Bureau of Mines and Geology and Seismological Laboratory University.
Advertisements

ILRS Workshop, Poznan, Poland, October Status of ITRF Development and SLR Contribution Zuheir Altamimi Xavier Collilieux David Coulot IGN France.
The IGS contribution to ITRF2014 Paul Rebischung, Bruno Garayt, Zuheir Altamimi, Xavier Collilieux 26th IUGG General Assembly, Prague, 28 June.
Workshop, Miami, June 2008 ITRF2005 residuals and co-location tie issues Zuheir Altamimi IGN, France Some features of ITRF2005 residuals ITRF2005 vs IGS05.
Jim Ray & Jake Griffiths NOAA/National Geodetic Survey STATUS OF IGS ORBIT MODELING & AREAS FOR IMPROVEMENT Earth radiation pressure (albedo) accelerations.
IGS Analysis Center Workshop, Miami Beach, 2-6 June 2008 M. Fritsche, R. Dietrich, A. Rülke Institut für Planetare Geodäsie (IPG), Technische Universität.
2013 AGU Fall Meeting – 9 December 2013 – San Francisco, CA – Poster #G13B-0933 Status of IGS Core Products J. Griffiths NOAA,
RFWG report ______________________ IGS 39th Governing Board Meeting San Francisco, 3 December
1 North American Reference Frame (NAREF) Working Group Mike Craymer Geodetic Survey Division, Natural Resources Canada 2nd SNARF Workshop Montreal, May.
Linking GPS to Tide Gauges and Tide Gauge Benchmarks Tilo Schöne GeoForschungsZentrum Potsdam Understanding Sea-level Rise and Variability, WCRP Workshop,
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
October 8, session 2REFAG2010 Paris1 Distributed processing systems for large geodetic solutions IAG WG “Comparison and combination of precise.
1/17 REFAG Symposium 6 October 2010 – Marne-la-Vallée, France Recent Results from the IGS Terrestrial Frame Combinations __________________________________________________________________________________________________.
IGS Analysis Center Workshop, 2-6 June 2008, Florida, USA GPS in the ITRF Combination D. Angermann, H. Drewes, M. Krügel, B. Meisel Deutsches Geodätisches.
The IGS contribution to ITRF2013 – Preliminary results from the IGS repro2 SINEX combinations Paul Rebischung, Bruno Garayt, Xavier Collilieux, Zuheir.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
AGU Fall meeting Quality assessment of GPS reprocessed Terrestrial Reference Frame 1 IGN/LAREG and GRGS 2 University of Luxembourg X Collilieux.
SNARF: Theory and Practice, and Implications Thomas Herring Department of Earth Atmospheric and Planetary Sciences, MIT
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
Earth Sciences Sector SLIDE 1 NAREF & CBN Velocity Solutions for a New Version of SNARF Mike Craymer Joe Henton Mike Piraszewski 8th SNARF Workshop AGU.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC IGS Reprocessing T.A. Springer, F. Dilssner, E. Schoenemann, I. Romero, J. Tegedor, F. Pereira,
Recommendation 1 The IGS shall develop a standard protocol for exchanging information about IGS stations. The associated machine-readable database should.
Geocenter motion estimates from the IGS Analysis Center solutions P. Rebischung, X. Collilieux, Z. Altamimi IGN/LAREG & GRGS 1 EGU General Assembly, Vienna,
CEGRN 2015 Campaign A. Caporali (1), J. Zurutuza (1), O. Khoda (2), G. Stangl (3), M. Becker (4), M. Bertocco (1), L. Gerhatova (5), M. Mojzes (5), M.
1/16 ITRF2008-P: Some evaluation elements and impact on IGS RF products Paul Rebischung, Bruno Garayt, 16 April 2010 ITRF2008-P: SOME EVALUATION ELEMENTS.
IGS Workshop 2008, June 2-6, Miami Beach First activities of the IGS Antenna Working Group — Comparison of ground- and space-based satellite antenna maps.
Unified Analysis Workshop, December 5-7, 2007, Beach Resort Monterey, CA GG S Proposals for Extended Parameterization in SINEX Markus Rothacher GeoForschungsZentrum.
AMON Reprocessing Hybrid IGS05+IGS08. EPN Reference Criteria: Long history Reliable TimeSeries Minimal gaps Geographical distribution Other neighbour.
IGS Analysis Center Workshop, Miami Beach, June 2008 Current Status of the IGS Reprocessing Peter Steigenberger Technische Universität München Gerd.
Do Annual Geopotential Variations Affect IGS Products ? J. Ray NOAA/NGS with major help from S. Bettadpur, J. Ries U. Texas/CSR T.-S. Bae Sejong U. X.
PENDING & PROPOSED MODEL CHANGES: SESSION RECOMMENDATIONS IGS core products AC modeling documentation Troposphere modeling Higher-order ionospheric corrections.
PBO Frame Definition using SNARF Version 1.0 Tom Herring MIT.
Workshop, Miami, June 2008 IGS Contribution to ITRF Zuheir Altamimi & Xavier Collilieux IGN, France.
12/12/01Fall AGU Vertical Reference Frames for Sea Level Monitoring Thomas Herring Department of Earth, Atmosphere and Planetary Sciences
Aug 6, 2002APSG Irkutsk Contemporary Horizontal and Vertical Deformation of the Tien Shan Thomas Herring, Bradford H. Hager, Brendan Meade, Massachusetts.
IGS08, Miami, June 2-6, 2008 Combination of the Analysis Centers Reprocessed “SINEX” Solutions Rémi Ferland Geodetic Survey Division.
1/16 35th IGS Governing Board Meeting December 13, 2009 – San Francisco TRANSITION OF THE IGS REFERENCE FRAME COORDINATION FROM NRCAN TO IGN - STATUS AND.
Importance of SLR in the Determination of the ITRF Zuheir Altamimi IGN, France Geoscience Australia, Canberra, August 29, 2005 SLR Strength: its contribution.
Jason-1 POD reprocessing at CNES Current status and further developments L. Cerri, S. Houry, P. Perrachon, F. Mercier. J.P. Berthias with entries from.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Status and Future of the IERS Combination Efforts Markus Rothacher GeoForschungsZentrum.
Giovanni Sella CORS Program Manager NOAA-National Geodetic Survey CORS’s New Revised Coordinates GLRHMP – Columbus, OH 13 October, 2011.
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Strategies for Weekly Routine Generation of Combined IERS Products Markus Rothacher.
IERS Directing Board Meeting No.39, BIPM Paris, September 23, 2004 IERS2005: Plan “Integrated Earth orientation parameters, Radio sources, and Site coordinates.
Reference Frames Global Continental Local -- may be self-defined
Contemporary Horizontal and Vertical Deformation of the Tien Shan
Impact of the Antenna Model Change on IGS Products
Unified Analysis Workshop, July 2017, Paris
Real-Time Working Group
Analysis Center + Reference Frame Working Group
Loukis Agrotis and Mark Caissy IGS GB 43 Pasadena 22 June 2014
NRCan Velocity Fields & Comparisons to Some Plate Motion Estimates
Troposphere Working Group
Reference Frame Working Group
Presentation of Public ESA Multi-GNSS Products
Understanding what sh_gamit does
CNES Real-time Analysis center Status
GPS Network: Status GFZ
Track Output Interpretation
ESOC IGS Reprocessing T. Springer, F. Dilssner, E. Schoenemann,
WHY DOES THE IGS CARE ABOUT EOPs?
SNARF Ver 2.0 Construction
Proposal for long station names in SINEX format Paul Rebischung Unified Analysis Workshop, Paris, July 2017 Good morning. So I’m going to.
ESOC Combined GNSS Processing
Track Output Interpretation
ESOC Combined GNSS Processing
Agenda Background and Motivation
Reference Frame Working Group Report
CNES-CLS Dynamical modelling of GPS orbits
Presentation transcript:

Combination of reprocessed orbit, clock and ERP products Gerd Gendt and Thomas Nischan GeoForschungsZentrum Potsdam

Status of IGS Final Products before Reprocessing Orbits (with 15-minute clocks) & ERP products since 1994 SINEX (since 1996; ERP since June 1999) Combined Clocks with 5-minute sampling since Oct 2000 (week 1085) with 30-second sampling since Dec 2006 (week 1406 ACs: # in Combi COD ESA EMR GFZ JPL MIT NGS SIO SINEX 8 y ERP Orbits Clocks 6 - Clk 30s 3 : Reprocessing contribution

Reprocessing Goal Generation of RF with consistent ERP (contribution to ITRF) Consistent orbits referred to given RF Consistent clocks for PPP in given RF (now possible after Oct 2000 only) Test period Jan to Apr 2000, 14 GPS weeks (1042 to 1056) Jun to Dec 2007, 30 GPS weeks (1430 to 1459) (Check with latest official products) [NGS last 10 weeks  used as interval for all statistics] ESA GFZ* MIT NGS PDR SIO # in Cmb RouCmb SINEX y (y) 6 8 ERP Orbits Clocks - 3 Clk 30s -- *not 2000 ~COD

Stability of orbit RF Number of stations defining the IGS05 Note: AC’s frame rotation from SINEX combination will be used to align the orbits. Consistency between orbits and SINEX solution is important, and is degrading in the early years because of the reduced number of RF stations

Orbits – Differences to combination All orbits (including operational IGS Finals) are compared to combined repro orbits. IGF: 29 ± 5 mm IGF: 8 ± 2 mm Repro Operational Improvements for 2000 Repro quality comparable with operational product in 2007

Orbits – Long Arc Fit Repro Operational 7-day long arc fit through all orbits, including the combined ones Repro IG1: 51 ± 9 mm IG1: 27 ± 5 mm Operational IGS: 62 ± 18 mm IGS: 27 ± 4 mm

Clocks – Differences to combination Repro IGF:25 ± 4 ps Only 2 ACs 3 ACs Operational No RINEX clock files 6 ACs (3x30sec) No final answer for 2000 Good repro clock quality (official: more ACs, including 30s)

Orbit – Scale Repro Operational ACs have different scale. IGF: - 0.18 ± 7 ppb IGF: +0.17 ± 6 ppb Operational ACs have different scale. Causing a diff of 0.35 ppb btw 2000 and 2007 in operational time series Stability per AC and biases are similar to operational solution

Orbit – X-Transformation Repro Operational Consistency among ACs in 2000 is now comparable to 2007

Orbit – Z-Transformation Repro Operational 2000: ACs have smaller scatter, but biases are still there

Orbit – X-Rotation Repro Operational ACs have smaller scatter, but still biases. Problem at SI1 (not in SNX combi). Large biases at PD1 caused by present inconsistency to SNX

Orbit – Z-Rotation Repro Operational 2000: ACs have smaller scatter, but still biases. Problem at ES1.

X-Pole Repro Operational ACs have better quality. But not as good as in 2007 (RF!) Good repeatability at ACs (PD1!) IGF & IRF small scatter, no bias

LOD Repro Operational ACs have better quality. But not as good as in 2007 (RF!) Good repeatability at ACs (better ES1) IGF & IRF small scatter, no bias

Summary Reprocessing evaluation 2007: Repro has same quality as latest operational products 2000: Repro quality is better than for the old operational products (better, consist. S/W & models result in more consistent submissions) Problem for clocks (still not enough submissions; especially for 30s) More ACs shall join the reprocessing; esp. for clocks For the clock solutions the unique 4-character ID (RINEX file name) shall be used. [Recomm. REPRO 6] All reprocessing ACs have to follow the rules for generating IGS Final products, i.e. all products have to be consistent (esp. to SNX) [Recomm. REPRO 1]

Thank you for your attention

Orbit – Y-Transformation Repro Operational

Orbit – Y-Rotation Repro Operational

Y-Pole Repro Operational

X-Pole rate Repro Operational

Y-Pole rate Repro Operational