Comments received: PSE

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report 24 Sept 2007 Gordon Dobson-Mack Ellen Feng
Standards Review Subcommittee Update April 30, 2013.
Standards Review Subcommittee Update October 22, 2013.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Singleton Project New 8-ine breaker-and-a-half 345-kV station. Increase North-Houston limit by approximately 700 MW. Increase switching flexibility and.
Public Service Company of New Mexico
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
North Mankato Load Serving study Xcel Energy Great River Energy.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
California Energy Commission Workshop Nuclear Power Plant Issues
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
EV Safety GTR Task Force Group #2 – Low Electric Energy #6 EVS GTR Status Briefing November, 2014 EVS-06-18e.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
Electric Transmission Planning Local Area Planning Update Presentation to TRANSAC January 24, 2013.
1 Notification Rate Control draft-ietf-sipcore-event-rate-control th IETF,
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Center for Energy Workforce Development Pacific Northwest Regional Meeting Portland, OR July 28-29, 2009 Barbara Hins-Turner Executive Director, Center.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Puget Sound Energy Columbia Grid Presentation August 15, 2007 John Phillips.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
IAASB –February 2010 – Task Force finalized draft for discussion with IAASB and IAASB CAG in March 2010 –June approval of exposure draft IESBA –Closely.
Conclusion: reliable post contingency capacitor switching should be feasible to be planned. However, the simulation needs to be repeated as new information.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Lecture 14 Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Puget Sound Area Transmission Expansion Plan Sensitivity Results Review
Bert Peters Chair, Path Operator Task Force
Topics Corporate Overview – Transmission Expansion Planning - Members
Freeport Area Master Plan Project -
Description of Project
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable Electric.
WECC Load Modeling and Validation Group Meeting
Modifications to Planning Charter
BPA Air Conditioner Test Results
PSASG Meeting BPA TBL Operation Concerns By Jerry Jackson II
February 12 – 19, 2018.
Mgr. Interconnection Reliability Initiatives
Changes to DSR Procedures 2018/1
Joe Clarke (presenting)
Jonathan young ColumbiaGrid
WECC Load Modeling and Validation Group Meeting
TONBRIDGE POWER GREEN LINE
Planning Meeting November 4, 2010 Marv Landauer.
Joint Areas of Concern Northern Olympic Peninsula Olympia-Shelton Area
TVAAS What is Growth? TVAAS Definition Rock Springs Middle
Bert Peters Chair, Path Operator Task Force
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
ColumbiaGrid Puget Sound Area Study Team
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
Big Stone II Study Update
NI Curtailment Risk Assessment Draft Update to PSASG 2004 Report
Presentation transcript:

Comments received: PSE Clarification of mitigation for Paul-Tono phase shifter overload and impact of St Clair project More recent version of Puget Sound Expansion Plan added Location of Figures Clarification of whether data correction reduced or eliminated overloads around Hopkins Ridge Project energization schedule change for Alderton PSE not involved in planning of Northern Olympic Peninsula

Comments received: Chelan Text clarifications and corrections regarding Chelan projects McKenzie-Wenatchee Tap Entiat 115 kV Switching Station Reworded Northern Mid-C Study Team description (Alcoa “has increased production” instead of “is planning to increase production”)

Comments received ColumbiaGrid revised voltage stability and unsolved outages sensitivity Mitigation for Northern Olympic Peninsula not restudied but assumed same as 2011 studies Fairview issues identified as possible contingency definition Additional changes from February 9 Planning Meeting???