Rack and Interconnect Design in E-plan

Slides:



Advertisements
Similar presentations
Africa needs proper infrastructure in order to be able to develop economically. But building infrastructure requires huge amounts of money. Africa cant.
Advertisements

Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers.
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Mr C Johnston ICT Teacher
IBL Vacuum Box in UX15 Short summary Andrzej Zmuda
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
SCADA Enterprise Training Virtual Integrated Grid Client: Dr. Oman Prepared by: Nate Krussel and Theora Rice 1.
Development plan and quality plan for your Project
CSE 550 Computer Network Design Dr. Mohammed H. Sqalli COE, KFUPM Spring 2007 (Term 062)
ASHIMA KALRA.  COMPUTER NETWORK  Local Area Network (LAN) Local Area Network (LAN)  Metropolitan Area Network(MAN) Metropolitan Area Network(MAN) 
Course Overview Course Requirements Knowledge and Skills Student Expectations.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
Regional hospital of Tukums Dr. Viesturs Vīndedzis Deputy Director
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
Course ILT The OSI model Unit objectives Explain the significance of the OSI model, label the seven layers of the OSI model, and describe services provided.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Physical Design of a network People who develop & support networks.
ECE445: The Design Review Raj Vinjamuri February 3, 2014.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
21 March 2007 Controls 1 Hardware, Design and Standards Issues for ILC Controls Bob Downing.
Tracker Summary Alan Bross MICE CM October 10, 2007.
EXPERIENCES WITH THE XO IN GHANA. MEMBERS OF IMPLEMENTATION Four people selected from below-mention ministries:  MoESS  AITI- KACE  MoFEP  GICTED.
-Network topology is the layout of the connection between the computers. -It is also known as the pattern in which computers.
Anjanae Brueland & Janet Wingard.  What is Network Design, Planning & Management?  System Development Life Cycle (SDLC)  The phases of an information.
NUOL Campus Intranets (Team 5)
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
123rd Air Control Squadron Mobile network
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
Building Network of Remote Labs for strengthening university-secondary vocational schools collaboration USING THE REMOTE EXPERIMENT IN TEACHING MODULE.
Introduction to Networks BTEC Nat Bus - Principles of Networking 1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Internship final report Joanna Staniszewska Cracow University of Technology –
«My future profession»
Technology Support Strategy for UNI Learning Spaces
Cabling for LHCb Upgrade
Institute of Nuclear Physics Polish Academy of Sciences
Designing and Installing a Network
WP2: Preparation of Infrastructure WP3: DBBT Master Studies
T1 Electronic status Conclusions Electronics Cards:
COVER Full production should arrive today
WP02 PRR: Master Oscillator and RF Reference Distribution
Preparation for SER on Mechanical Engineering Study
Introduction to Operating Systems
GIS Portal Racks Project
ACS news Circulator TCU: control tests in progress All cavity racks
November 2005 Liaison Report from P1901
ITMI Computer Lab Renewal GBA 573 Summer 2004 Jeffrey Preston
Towards OPEN SUNY: A Novel On-line Learning Approach for Electrical and Computer Engineering and Engineering Technology Students By Dr. Mohammed Abdallah.
Towards OPEN SUNY: A Novel On-line Learning Approach for Electrical and Computer Engineering and Engineering Technology Students By Dr. Mohammed Abdallah.
فصل پانزدهم فاز پياده سازي مونا بخارايي نيا
TileCal ROD Commissioning Counting Room Installation
Introduction to Spreadsheets in Project Planning
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Krzysztof Czuba ESS LLRF Quarterly Meeting
Safety, reliability and maintainability
On behalf of protection systems
Rack installation and local tests for the MEBT Chopper Rack
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

Rack and Interconnect Design in E-plan Krystian BEC WUT 22 November 2018 , BI forum

Scope of Work 1. Design and preparation of infrastructure documentation and rack cabling for BD: - 3D rack occupation designs of ~ 50 BD racks, - all cables connections between devices and modules inside racks, - list of all cables types and connectors in each rack. 2. Design and production of BD racks patch panels. 3. Help with BD racks installation. 4. Laboratory works: devices testing, lab organization, etc.

Ongoing Work Preparation of documentation for few racks ( mainly from FEB building) – 2D draft layouts. https://confluence.esss.lu.se/display/BIG/Beam+Diagnostics+WUT+racks+layout%2C+installation+work+and+patch+panels+designs

Ongoing Work Based on 2D drawing they will be drawn in 3D in E-Plan Pro Panel.

Ongoing Work Designs and production patch panels for BD systems by WUT. List of patch panels designed and produced for BD systems until Nov. 2018.

Ongoing Work Designs and production patch panels for BD systems by WUT

Ongoing Work Designs and production patch panels for BD systems by WUT. BCM patch panel from rack no. FEB-050ROW:CNPW-U-013

Issues Main problems: poor or incomplete documentation necessary for work (mainly internal rack connections, cables, connectors ect.) Effects: can’t fulfill tasks in 100% - significant delays. To effectively perform tasks WUT team needs a full documentation of diagnostics systems placed in racks including: cable connections, types of cables, types of connectors, types of commercialy available devices and links to 3D drawings (to be implemented in E-Plan), 3D drawings of non commercial devices (to be implemented in E-Plan); available at the latest first week of February 2019 to fulfill schedule. More precise description of laboratory works is also missing.

E-Plan Pro Panel Thoughts and experiences with E-Plan Pro Panel Main problem right now is lack of training for the E-Plan Pro Panel software. Polish team attended a course of E-Plan Electric P8 (only for 2D). 2. Is there any database where we could get all 3D models (racks electronics, components, devices etc. ?) Data Portal (helpful E-Plan database – unavailable for use!) 3. Problem with stability (lags, network speed) during work through remote computer.

Thanks for your attention!