IGG Agenda – 11th April 2008 Minutes from last IGG meeting

Slides:



Advertisements
Similar presentations
IGG 10/01/08 1 Market Operations Update Industry Governance Group
Advertisements

Harmonisation Working Group HWG Meeting Wednesday, 8 th August, 2012 NIAUR Offices Belfast.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – 26 th June 2008 Minutes from last IGG meeting10.00.
ESB Networks Market Release Meeting of the IGG, 20 th August 2009.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda 12 th October 2010 Minutes from Previous IGG Meeting.
IGG 05/03/ ERP6 Upgrade and Address Validation Issue Mary Mulcahy ESB Networks.
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – September 21 st 2006 Minutes from last IGG meeting10.00 – Review of Action.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
Retail Markets Co-Ordination Design Service ReMCoDS Retail Markets Co-Ordination Working Group Wednesday, 12 th June, 2013 CER Offices Dublin.
Harmonisation Working Group HWG Meeting Wednesday, 23rd May, 2012 NIAUR Offices Belfast.
22 February 2012Page 1 IGG Agenda 22 nd February 2012 Minutes from Previous IGG Meeting 14:00 – 14:10 Review of Action Items 14:10 – 14:15 CER Update 14:15.
10 August 2011Page 1 IGG Agenda 10 th August 2011 Minutes from Previous IGG Meeting10:30 – 10:35 Review of Action Items10:35 – 10:45 CER Update10:45 –
Harmonisation Working Group HWG Meeting Thursday, 18 th November, 2010 CER Offices Dublin.
Harmonisation Retail Design Service HRDS Harmonisation Working Group Wednesday, 5 th December, 2012 CER Offices Dublin.
IGG Agenda 2nd November 2011 Minutes from Previous IGG Meeting
IGG Agenda – June 7th 2007 Minutes from last IGG meeting – 10.10
IGG Agenda 10th April 2013 Minutes from Previous IGG Meeting
Retail Markets Co-Ordination Working Group
Retail Market Assurance Services for the Irish Electricity Market
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
ESB Networks Market Release Meeting of the IGG, May 28th 2009
Harmonisation Working Group
Retail Market Assurance Services for the Irish Electricity Market
IGG Agenda – 29th November 2007
ESB Networks AIP Programme Meeting of the IGG, April 19th 2007
Customer Service Update to IGG
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
ESB Networks AIP Programme
Industry Governance Group 28th May 2009
IGG Agenda – 18th October 2007 Minutes from last IGG meeting – 10.10
Harmonisation Working Group
Harmonisation Working Group
IGG Agenda 23rd February 2011 Minutes from Previous IGG Meeting
Harmonisation Working Group
IGG Agenda 1st October 2009 Minutes from Previous IGG Meeting
Application of DUoS Tariffs
IGG Agenda – January 12th 2006 Minutes from last IGG meeting – 10.15
Harmonisation Working Group
ESB Networks Market Release Meeting of the IGG, 1st October 2009
IGG Agenda – May 18th 2006 Minutes from last IGG meeting – 10.15
IGG Agenda – 18th September 2008
IGG Agenda – June 22nd 2006 Minutes from last IGG meeting – 10.15
ROI HSP Project Update Conor Garrigan 21 September 2011.
Harmonisation Working Group
IGG Agenda – February 23rd 2006
HWG Agenda 3rd June 2010 Minutes from Previous HWG Meeting
IGG Agenda – 30th October 2008 Minutes from last IGG meeting
Retail Market Assurance Services for the Irish Electricity Market
IGG Workshop IGG Workshop, Tuesday 26th October, 2010,
ESB Networks Market Release Meeting of the IGG, March 5th 2009
IGG Agenda – August 10th 2006 Minutes from last IGG meeting – 10.15
Harmonisation Working Group
Harmonisation Working Group
IGG Agenda – 15th May 2008 Minutes from last IGG meeting
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
ESB Networks Market Release Meeting of the IGG, April 16th 2009
ESB Networks AIP Programme Meeting of the IGG, November 29th 2007
Harmonisation Working Group
IGG Agenda 26th August 2010 Minutes from Previous IGG Meeting
IGG Agenda 3rd June 2010 Minutes from Previous IGG Meeting
IGG Agenda 23rd April 2010 Minutes from Previous IGG Meeting
ROI Retail Market Release v12. 00
Harmonisation Working Group
ESB Networks AIP Programme Update to IGG, June 22nd 2006
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
Harmonisation Working Group
ESB Networks AIP Programme Meeting of the IGG, December 14th 2006
ESB Networks AIP Programme Meeting of the IGG, November 1st 2006
Presentation transcript:

IGG Agenda – 11th April 2008 Minutes from last IGG meeting 11.00 - 11.10 Review of Action Items 11.10 - 11.30 Schema Release 11.30 - 12.00 Recalculation of Estimates 12.00 - 12.15 CER Update 12.15 - 12.25 Gemserv Update 12.25 - 12.35 Market Operations Update 12.35 - 12.45 Proposal for applying the DUoS rules 12.45 - 13.00 Retail Market Design Service Update 13.00 - 13.15 Market Design Update 13.15 - 13.30 Next Steps 13.30 - 13.40 1

Minutes from IGG meeting – 29th February 2008

IGG Action Items 3

IGG Action Items Closed IGG Actions: List issued in advance of meeting detailing IGG Actions to be closed IGG Actions to be carried forward: Feedback sought on list of IGG Actions carried forward 4

Update on Action Items Action Item 108 (& Action Item 159) Issue Data Storage and Archiving Document to Market Participants Issued on 10th April 2008 5

Update on Action Items Action Item 108 (& Action Item 159) Issue Data Storage and Archiving Document to Market Participants Issued on 10th April 2008 6

Update on Action Items Action Item 278 RMDS to investigate why both suppliers are not currently being contacted as outlined in WP13 Working Practice needs to be amended so that both suppliers are advised of duplicate MPRN scenario The current level of duplicate MPRNs is 2 to 3 per month One Supplier maintains if a duplicate MPRN is registered and then de-registered as a result of ESB Networks identifying the MPRN as a duplicate, the supplier will have incurred costs signing up that MPRN and there doesn’t appear to be a mechanism to recoup these costs. Feedback requested. 7

Tony Carroll, ESB Networks Schema Release Tony Carroll, ESB Networks 8

Recalculation of Estimates Cormac Madden 9

Recalculation of Estimates Existing Recalculation only where present less than previous Only as far back as present ceases to be less than previous Proposed Recalculation of all estimates, subject to a significance threshold DUoS tariff change flag Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates 10

Recalculation of Estimates Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates Significance Thresholds: Time Consumption Time: No. of consecutive estimated periods Set initially to 3 11

Recalculation of Estimates Actual Reading 2 Actual Reading 1 Estimates A1 E1 Time E2 E3 A2 Consumption History with Estimates Significance Thresholds: Time Consumption Consumption: Level of kWh consumption for the last period indicated by actual read Set initially to 25% of AUF i.e. 3 months average. 12

Recalculation of Estimates (contd.) Present status: Based on current functionality Operational impact of increased message volumes: Not thought to be an issue with thresholds in place Next steps: DR to be raised 13

CER Update 14

Gemserv Update 15

Market Operations Update 16

Proposal for applying the DUoS rules Brendan O’Connor, Commercial Section, ESB Networks 17

Retail Electricity Market Issues Update Cormac Madden, RMDS 18

Market Issues Update Issues Raised since last IGG Market Issue No. 153 - Customer special needs not populated on 105 message Market Issue No. 154 - The current service order does not take into account where a customer requests night/day meter but is also installing night storage heating. This often results in two calls to premises 19

Market Issues Update Issues Closed since last IGG Market Issue No. 135 - Technical Contact Name and Phone number sent on CoS request without Tech contact address causes 105 to issue with blank street field in Tech Contact Address 20

Retail Market Design Service Update C. Madden, RMDS 21

RMDS Update Report on Service Objectives Message Reconciliation process Revised Outage Notification process 22

Retail Market Design Service Update Key Service Objectives Area Activity Measure Objective  Actual (2007) Customer Surveys No. per year 1 1  Process Design releases No. of significant errors 5 Information released to website Time to release from receipt <1 day  80% approx. Change Control Circulation of documents (days before meeting) 100%  Query Helpline Response time to Design Queries 95% approx  Market Meetings Agendas (days before meeting)  100% Minutes (days after meeting) 22%  Resolution or escalation of IGG Actions (weeks) 12   80% approx New Release of design documents (No. of significant errors)  2 System planned outages Notice of part weekend outage (days) 50% approx  23

Retail Market Design Service Update Other Service Objectives Area Activity Measure Objective  Actual Process Design releases No. of non-significant errors < 5  5+ Response time to queries requiring input from 3rd parties (e.g. ESBN) 10 95% approx  Market Meetings Working documents (days before meeting) 2 100%  Presentations (days before meeting) 0%  Final presentations (days after meeting)  100% Change Control New Release of design documents (no. of typographical errors) < 5  24

RMDS Service Objectives IGG Agendas (5 days before meeting) IGG Change Control Documents (5 days) IGG Working Documents (2 days before meeting) IGG Presentations (2 days before meeting) IGG Final Presentations (2 days after meeting) IGG Minutes to be distributed (within 5 days) IGG Conference Call Agenda (5 days before Meeting) IGG Conference Call Minutes (5 days after Meeting) System Planned Outages (5 days notice) 25

RMDS Service Objectives Days Quantity Met Agendas 5 8 100% Change Control Documents 9 Working Documents 2 7 71% Presentations 0% Final Presentations Minutes 22% Conference Call Agenda 19 79% Conference Call Minutes 95% Overall 87 75% 26

Number of Action Items by Category 27

Total Number of Action Items 28

Number of Action Items Closed 29

Resolution or escalation of IGG Actions (within 12 weeks) 30

Message Reconciliation Colm Gaffney, RMDS 31

Reconciliation Reports Missing Receipt Acknowledgements Issued to Hub but not transmitted (failed validation) Numbers of Messages received by the HUB Inbound from Suppliers and transmitted to CMS (for 24 hr period) Numbers of Messages received by the HUB Outbound from CMS and transmitted to Suppliers (for 24 hr period) ∑ Total Validation Failure No RA 32

Reasons for message failures Message failed to be routed Cause - no data or invalid data Message routed but did not pass the Routing Schema Cause – incorrect Port or Topic in the routing table Message failed to be converted Cause – invalid data type Message failed validation Message failed to be packaged Message failed to be transmitted Discrepancies between CMS counts and HUB counts Messages delayed due to outages 33

34

35

Outage Notification Process Colm Gaffney, RMDS 36

37

Discussion Requests & Market Change Requests Cormac Madden, RMDS 38

Discussion Request MCR 063 Data Fields Published for QH Import Report Data Fields Published for NQH Import Report MPRN Supplier Unit DUoS Group MCC 10000055555 SU_427000 DG7 MCC10 MPRN Supplier Unit DUoS Group MCC Load Factor 10000002321 SU_424000 DG6 MCC06 LF3 Profile Description Role Role Description Usage Factor AUF/EUF Flag STD Prof 8 Day 00D 00 Standard day 4,523.78 A 39

Discussion Request MCR 0154 A new 342 market message for export channel data only The 341 market message is to be modified to exclude the Export data. A new Version Number field will be added to the 341 and 342 Market Message at the ‘MPRN Level Information’ segment. 341 and 342 market messages are to be prevented form issuing with single channel data. The Channel Status that currently resides at the Channel Level details should be moved up to the MPRN level and renamed ‘Alert Flag’. 40

Market Change Request MCR 0160 - Working Practice 0016 - Document the procedure to be used for like-to-like QH meter replacement Issued to the market on 04.04.08 Approval requested 41

Draft Discussion Request Action Item 212 Publish multiplier value associated with an MPRN on the MP Extranet 42

Next Steps Proposed Diary dates for IGG meetings in 2008: 15.05.2008 26.06.2008 07.08.2008 18.09.2008 30.10.2008 11.12.2008 22.01.2009 Proposed dates are on Calendar of Events on RMDS website 43

Next Steps Propose to continue with conference call every two weeks: 17.04.2008 01.05.2008 29.05.2008 Call details have new contingency PIN No: Number: 01-6647602 PIN : 77640 Contingency number remains: 01-6647777 New PIN: 80490 44

Thank You 45