Progress on cryostat design and production

Slides:



Advertisements
Similar presentations
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Advertisements

ABCs of Project Management Kaye P. Boone, PMP Project Manager, Information Systems Moore & Van Allen, PLLC.
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Centro Astronómico de Yebes Observatorio Astronómico Nacional ALMA CAY 11/02/04MADRID1 Cryogenic Amplifiers for the Band 7 and Band 9 Cartridges Juan Daniel.
Development plan and quality plan for your Project
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
Workshops Tech Com: Progress Reports Terminology from the first class period Goal: What it is you are trying to accomplish; the bottom line. Milestone:
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Travel Website Enhancement Project Project Update First Name Last Name.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Project Status Report Presenter Name Presentation Date.
Project Life Cycle.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
ENV-NCP-TOGETHER PARTNER MEETING WORK PACKAGE 3 02/03/2010 c Beta Technology.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
BAND-GEM Demonstrator Time Schedule Giuseppe Gorini.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
SchedulingProducingControllingSchedulingProducingControlling.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
Milestones & Deliverables fist reporting period (June 2010)
The Kick out Delivery Chute is a reload station for line operators to manually reload a block. After manually loading the block onto our Kick out chute,
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Copyright © AEA — Association of Enterprise Architects 2013 AEA Workgroup Charter Proposal Version of 1 August 2013.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
CHAPTER 7 – Managing Project Schedules. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the.

1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Area Covered. Work Done Quantity Financial Progress of work.
WP High Beta Cavities Delivery
AMICI WP1 – Management, coordination and dissemination
CSP 25th November 2010 Technical agreement number 3: overview
Assembly And Installation Of Ikea Kitchen Cabinets
WORK BREAKDOWN STRUCTURE
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
Complementary ISTC Projects #3888, 3889p
Campus Master Plan.
MICE CM31 Schedule summary
Azure Stack Foundation
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Guidance notes for Project Manager
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
Internal Audit Life Cycle
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
“Fold-and-Go” Legends: Overall Status:  
SAP Value Assurance plan and safeguard service package for SAP S/4HANA Cloud Business Needs Need to follow leading practices and reduce risk of project.
Software Engineering I Fall 2017
Project Foundations Best practices for laying a solid project foundation and sustaining a project.
Xoserve IX Refresh Customer Update 30/10/2018.
Software Engineering I Fall 2017
<Project Name> Milestone Summary Report
Xoserve IX Refresh Customer Update 03/01/2019.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
What would improve the RAG status when amber or red
What would improve the RAG status when amber or red
Prototype cryomodule development
Project Management Considerations
Teleconference ACS – FREIA 19th June 2017
[Your Product or Company Name Here]

Schedule (Major Deliverables and Milestones)
UPPSALA UNIVERSITY_GERSEMI PROJECT

PS magnet status D Bodart 25/06/2019.
Key Activities/ Milestones
Presentation transcript:

Progress on cryostat design and production Fresca 2 cryostat Progress on cryostat design and production A. Vande Craen, 29/05/2019 29/05/2019

Update Design and fabrication to be done by EN-MME Meeting to be planned with different actors of the project to discuss the requirements Kick-off meeting held on 16/05/2019 Work package description in preparation Scope Deliverables Share of responsibilities Planning 29/05/2019

Planning New planning in preparation by EN-MME Main milestones Delivery (pre-assembly tested) for end-2020 Installation finished for March 2021 (TBC) 29/05/2019