Presentation to the GNI Committee

Slides:



Advertisements
Similar presentations
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Jean-Pierre Garitte Budapest 29 March 2017
THE EU CIRCULAR ECONOMY PACKAGE: THE GOVERNANCE?
DG Environment, Unit D.2 Marine Environment and Water Industry
The Instrument for Pre–accession Assistance
European Safety Survey : News on the draft Council and European Parliament Regulation March 2011.
5. Areas under organic farming
Luxembourg 30 January-1 February 2006
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Key indicators based on the collected data
Awareness and enforcement of compliance with State aid rules
The IRES process in Vladimir Markhonko
Proposal for new modules for inclusion in Regulation 691/2011
Potential Milestones A timeline to finish in one year
NATA Foundation Building Blocks Process
GBV survey: progress EUROSTAT 20 March 2018.
Reporting on QUALITY issues
Eurostat Task force on victimisation surveys,
The Work programme
McDonald’s Kalender 2009.
Pesticides Statistics
Item 8 Cost assessment survey of production of statistics in the ESS
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
Problem Gambling Clicks to Opgr.org
Functioning of the Materiality threshold GNIC/340
European Safety Survey (SASU) item 7 of the Agenda
Regional Government expenditure statistics
Outline of the control approach
McDonald’s calendar 2007.
Crime & Criminal Justice Data & metadata collection
Study on the Experience and Actions of the Main European Actors Active in the Field of Development Education and Awareness Raising (DEAR) Karina Chircu.
Progress in the designation of Special Areas of Conservation (SACs)
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
Point 5 : Progress of the work on the EHS since the last DSS meeting
Education and Training Statistics Working Group
Working Group on Statistical Confidentiality Item 3 of the Agenda
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Jakub Hrkal ESTAT Unit F-4
February 2007 Note: Source:.
ESS Resource Directors Group Luxembourg
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Favourable Reference Values - reporting guidelines
Education and Training Statistics Working Group, May 2011
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
European Statistical System Network on Culture (ESSnet Culture)
UPDATE OF SNA 1993 Conference on National Accounts in the context of development cooperation Luxembourg 6-8 May 2008.
COMITOLOGY ITEMS (Point 4. on the agenda)
McDonald’s calendar 2007.
Outline Mandate Working methods Timetable
Implementing the ESS Vision 2020
Habitat Changes and Fish Migration
Paolo Valente UNECE Statistical Division
UNECE-UNODC Task Force on Victim Surveys
2015 January February March April May June July August September
Eurostat Flagship publication on cities
Task Force Peer reviews and quality Eurostat
Habitat Changes and Fish Migration
Item 5 Modernisation of the EU-SILC Production
Presentation transcript:

Presentation to the GNI Committee ECA PERFORMANCE AUDIT « The effectiveness of the Commission’s verification of GNI data used for own resources » 26th GNI Committee meeting on April 25, 2013 Under point IX Any other Business European Court of Auditors 12, rue Alcide de Gasperi L - 1615 LUXEMBOURG Tel.: +352 4398-1 Fax: +352 4398-46233

ECA performance audit on GNI TABLE OF CONTENTS Progress Expected timetable for reporting 3. Results of the survey 3.1 Response rate 3.2 Results 3.3 Overall conclusion 3.4 Specific aspects 3.5 Use of the survey in the audit report 2 ECA performance audit on GNI

ECA performance audit on GNI 1. Progress MILESTONES DEADLINES Commission’s setting of specific reservations on GNI for the period 2002 – 2007 January 2012 Making available to the Court’s auditors of Eurostat control files February-March 2012 START OF THE AUDIT March 2012 AUDIT FIELDWORK (Commission and Member States) March-December 2012 END OF THE AUDIT / REPORTING February / July 2013 PUBLICATION September 2013 3 ECA performance audit on GNI

2. Expected timetable for reporting ACTIVITY DEADLINES Preparation of the draft Report March 2013 Adoption of the Final Report by Chamber IV / Court April (- beginning of May) 2013 Pre-contradictory meeting(s) with DG BUDG and Eurostat May-June 2013 Contradictory meeting with DG BUDG and Eurostat mid-July 2013 Adoption of the Final Report APC by Chamber IV / Court end of July 2013 PUBLICATION September 2013 4 ECA performance audit on GNI

24 Member States replied to the survey. ECA performance audit on GNI 3. Results of the survey 3.1 Response rate 89% 24 Member States replied to the survey. - Most of them added the reasoning for the answers, - Some of the replies did not include answers for all questions. 5 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.2 Results Question 2.2 is a « negative » question: « No » means OK 6 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.3 Overall conclusion Member States’ delegates of the GNI Committee consider that Eurostat’s verification of Member States’ GNI data for own resources is generally adequate. 77% of the replies to questions are positive. However, there are some comments on some specific aspects (as further presented) ….. 7 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.4 Specific aspects (1) STEP 1 – CONTROL STRATEGY/APPROACH 10 of the respondents (42%) consider that the cost-benefit principle was not (always) properly applied by Eurostat in its verification (question 1.2), 8 of the respondents (33%) state that Eurostat did not (always) report on the cases where the cost-benefit principle applied (question 1.3). 8 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.4 Specific aspects (2) STEP 2 – VERIFICATION PROCESS 9 of the respondents (38%) consider that the working tools used by Eurostat (partially) involve unjustified work to be carried out by NSIs (i.e. GIAQ is too detailed) (question 2.2), 8 of the respondents (33%) state that the process of setting (transversal and country) specific reservations was not (always) adequate in terms of contents and transparency (question 2.7). 9 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.4 Specific aspects (3) STEP 3 – REPORTING 6 of the respondents (25%) consider that the criteria used by the Commission to set reservations were not (always) clear and consistently applied in all Member States (question 3.2). This is coherent with the reply to the previous question 2.7. 10 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.4 Specific aspects (4) OTHER ISSUES 10 of the respondents (42%) take the view that the duration (i.e. 5 years) of Eurostat’s verification process on Member States’ GNI Inventories was not (entirely) adequate (question 2.4), 8 of the respondents (33%) consider that the GNI Committee and/or Eurostat did not (always) take sufficient measures to develop best practices for the GNI compilation process (question 5). 11 ECA performance audit on GNI

ECA performance audit on GNI 3. Results of the survey 3.5 Use of the survey in the audit report The results of the survey were one of the sources used to draw up a set of best practices of verification arrangements (the “Court’s control model”). The results are used to reinforce some of the observations included in the special report. 12 ECA performance audit on GNI

Presentation to the GNI Committee ECA performance audit on GNI Thank you for your attention. 13 ECA performance audit on GNI