TGu Closing Report Date: Authors: January 2005 January 2005

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0085r2 Submission January 2005 Stephen McCann, Siemens Roke ManorSlide 1 TGu Closing Report Notice: This document has been prepared.
Advertisements

TGu Timeline Date: Authors: March 2006 March 2006
[ Interim Meetings 2006] Date: Authors: July 2005
TGu/TGv Joint Session Date: Authors: July 2005 July 2005
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
March 2014 Election Results
[ Policies and Procedure Summary]
TGu Pre-Proposal Presentations
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
3GPP liaison report July 2006
TGu Closing Report Date: Authors: May 2006 May 2006
Emergency Call Motion Date: Authors: January 2006
TGu-changes-from-d0-02-to-d0-03
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: March 2006 March 2006
TGu Pre-Proposal Presentations
TGu Pre-Proposal Presentations
WNG SC Closing Report Date: Authors: November 2005
TGu Closing Report Date: Authors: July 2006 July 2006
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
TGu Motions Date: Authors: May 2007 May 2007
TGu Closing Report Date: Authors: September 2005
TGu Closing Report Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
TGu Motions Date: Authors: July 2006 July 2006
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGu Timeline Date: Authors: May 2006 May 2006
WNG Closing Report Date: Authors: January 2007 January 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
Document Motions Date: Authors: November 2005 November 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
TGu Closing Report Date: Authors: March 2007 March 2007
TGu Motions Date: Authors: May 2006 May 2006
TGu Motions Date: Authors: November 2006 November 2006
TGu Closing Report Date: Authors: January 2006 January 2006
TGu liaisons Date: Authors: March 2006 March 2006
TGu Closing Report Date: Authors: May 2007 May 2007
TGu Timeline Date: Authors: May 2006 May 2006
TGu-changes-from-d0-04-to-d0-05
TGu Closing Report Date: Authors: March 2005 March 2005
TGu Closing Report Date: Authors: January 2005 January 2005
TGu Closing Report Date: Authors: November 2006
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Motions Date: Authors: March 2006 March 2006
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

TGu Closing Report Date: 2005-01-21 Authors: January 2005 January 2005 doc.: IEEE 802.11-05/0085r0 January 2005 TGu Closing Report Date: 2005-01-21 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

January 2005 doc.: IEEE 802.11-05/0085r0 January 2005 Abstract Closing report for TGu Interworking with External Networks for January 2005, Monterey, California. Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Review IAB draft received from IETF Technical Presentations January 2005 doc.: IEEE 802.11-05/0085r0 January 2005 Summary Secretary Election Review IAB draft received from IETF Technical Presentations Joint IEEE 802.21 meeting Audio Conference Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

Requirements and Terminology Drafting January 2005 doc.: IEEE 802.11-05/0085r0 January 2005 Liaison Review Before March meeting Internet Architecture Board http://www.drizzle.com/~aboba/IAB/draft-iab-link-indications-01.txt Presentations Terminology (0028r0) Interworking Assumptions (1631r0) Requirements for Network Selection (0029r0) Network Characteristics for AP Selection (1594r0) Requirements and Terminology Drafting Functional requirements and scope (1583r0) Terms and definitions (1619r0) Timeline (0049r0) Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

IEEE 802.21 Joint Session Brief summary of IEEE 802.11u scope January 2005 doc.: IEEE 802.11-05/0085r0 January 2005 IEEE 802.21 Joint Session Brief summary of IEEE 802.11u scope IEEE 802.11u requirements gathering phase IEEE 802.21 requirements which impact IEEE 802.11u Required feedback from IEEE 802.11u to IEEE 802.21 Stephen McCann, Siemens Roke Manor Stephen McCann, Siemens Roke Manor

March 2005 Documents drafting IAB draft liaison response Scenarios January 2005 March 2005 Documents drafting Scenarios Functional Requirements Terms and Conditions IAB draft liaison response Stephen McCann, Siemens Roke Manor