B904 Status Report by Fred B.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
FNAL testbeam planning Jan 27, 2014 Alain Bellerive.
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
This Certifies that _______________________ Has won 1 st Place in and has successfully completed our 9 week weight loss challenge Proudly given this _____.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
January 31st, 2013 Homework: Worksheet on area and circumference Do Now: 1. A circle has a diameter of 31 cm. What is the area of the circle? Round if.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Shifter Training Course – Global Running Fred Borcherding Reach from CSCOperations Twiki page or directly:
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
First collisions in LHC
PIXEL CAEN Installation Status
Calorimeter Status Electronics Installation and Commissioning
Recall: CSC TF Halo rate spikes during run (23 May)
904 Status Recall last Group Meeting…
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Module Loading Task Force Meeting October 21, 2004
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
To Do: 1.Math Boxes Math Boxes Math Boxes Math Boxes Math Boxes Math Boxes Any Unit 1 MB or pages not Not Done.
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
The Ohio State University
B904 Status Report by Fred B.
University of California Los Angeles
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Lab Safety Insert Your Name Here.
Fred’s Input to Rice Workshop
Configuring the Peripheral Crates
Equipment Status ARCS equipment status DAQ equipment status
A. Herlert, CERN PH-SME-IS
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Status Report Status reports;
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
ME I&C -- PC Electronics
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

B904 Status Report by Fred B. 19-April-05 B904 Status 2009-09-15 Had another power outage last week – still not up Rigged temporary power to PCs and Net box. Rigged temporary power to pcrate and TTC Working for TMB firmware testing – Greg Will work for some board testing – Fred NEED – reliable power Still needed for Cosmic running – TF Need cosmic running to qualify pcrate boards Will conduct cosmic runs with several sets of pcrate boards – certify them – put them in spares crate at Pt5  See more about B904 and Cosmic Test Stand from the web pages CMS Web > MuonWikiHome > MuonCSC > CSCCosmicSlice https://twiki.cern.ch/twiki/bin/view/CMS/CSCCosmicSlice 6-Nov-19 B904 Status Report by Fred B.

B904 Status Report by Fred B. 19-April-05 Physics Week 1st impression – Many people have done a lot of good work 2nd impression – Need to shift gears from CRAFT & Cosmics to BEAM 3rd impression – Need people in DPG & Operations who liason with POG, others with operations, others with … Not just participant in another level but serve as designated liason with group at another level Questions for DPG and Operations Are we ready for first beam injection? HV – can we control as necessary for single beam Are the Halo triggers ready, do we know how to monitor them Is DQM (....) ready to halo? Do we have procedures in place Are we ready for first collisions (at injection energy)? All the above plus? Are we ready for 1st inverse picobarn @ 7 TeV Are we ready for 10 Are we ready for 100 6-Nov-19 B904 Status Report by Fred B.