Program Proposal to ITGC

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Ensuring Fire Compliance An Action Plan Clive Reilly Checkmate Fire Solutions.
ASF Leak Detectors – New Design Präsentation neuer LAG Newsletter.ppt 1 After our previous device models are used for nearly four decades in more than.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Better business outcomes equal better.
Why Dilution may not always be a Solution Winnie Cheng, Regional Radiation Specialist AARST 2014 International Radon Symposium Charleston, South Carolina.
Utilities’ Update on Energy Savings Assistance Program Contractor Selection LIOB Meeting October 29, 2012 Sacramento, California.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Timber Research Centre Michael Anderson– Mohamed Farid Pablo Prallong – Lewis Macleod Ross Turbet & Group A 26/04/20054 th Presentation.
{. Let one of our dedicated Service Trucks come to help you with your electrical needs.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
IBM Energy & Environment © 2008 IBM Corporation Energy Efficiency in the Data Centre … and beyond Peter Richardson UK Green Marketing Leader.
Key Findings and Implications for the Future from the Stock Condition Survey undertaken by Savills Presented by Winston Williams January 2008.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
A HOUSE TO ECONOMIZE. MAIN TECHNOLOGIES USED FOR THE “ ECOLOGICAL HOUSE " This is a list of the most important technologies that we can use in our houses.
Stellar Stars – Reflections of a Center CIO Mike Bolger (KSC) and Kelly Carter (HQ) August 16, 2011.
What is an Energy Audit ? Ramon Casado Adam Romano.
Electricity Conservation and Safety. Questions On average, what consumes that most energy in homes? Name some ways to conserve energy. How many people.
Energy and Industry Trends Dave Molin VP & General Manager Honeywell Building Control Systems.
Solar shading - helping to significantly reduce energy consumption in buildings.
CLEAN ENERGY WORKS Transforming lives and communities by transforming homes.
Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate.
Budget Goals From our 2010/11 Budget: “High levels of student achievement” “Reduced gaps in student achievement” This means our goal is to maximize resources.
Updated Space Heater Policy For Weatherization -- Draft National Weatherization Training Conference Orlando, FL December 10, 2007.
Proposed LBT Instrument Facility Enclosure OSU MODS.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
My Green House By Jayden White. Lighting The lights I am going to put in my house are compact fluorescent light bulbs. I will use these because:  They.
ROOFING MATERIALS, INSULATION, AND HOUSING SYSTEMS.
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
Environmental issues related to OmniPhone Noise Pollution Power Consumption Reuse/Recycle.
Slide 1 People Department Interim Strategic Director Bristol’s Budget Consultation (CYPS) 2014/15 to 2016/17 Isobel Cattermole – Interim Strategic Director.
A New Language Shining the Light on Passive Solar Features and Retrofit Possibilities.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Information Technology Services Strategic Directions Approach and Proposal “Charting Our Course”
Introduction of New Wall Mounted AVS 18-24URCSBBA Commercial Air Conditioning Dept
Energy and Power Careers By: Rhonda Pringle (Example)
Session 12 Information management and security. 1 Contents Part 1: Introduction Part 2: Legal and regulatory responsibilities Part 3: Our Procedures Part.
“Unless the Lord builds the house...” Psalm 127:1 Church Reordering 2016 Appeal Launch.
TIER IT Inventory CITI Meeting November 6,
Physical Security at Data Center: A survey. Objective of the Survey  1. To identify the current physical security in data centre.  2.To analyse the.
EECS David C. Chan1 Computer Security Management Session 1 How IT Affects Risks and Assurance.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
ENERGY STAR OVERVIEW November Overview What is ENERGY STAR? History Accomplishments Key Strategies –Labeling –Superior Energy Management Building.
Alex Glenn Duke Energy Florida President
Risk management.
February 13, 2017.
Objective 6.02 part 2: Recognize components of construction
Capital Project Needs Assessment
Efficient Server Room Abstract Results and Discussion Introduction
Galt Joint Union High School District
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
Enterprise Asset Management Proposal to Expand AiM :
Electrical Junction Boxes in UAE | SPPE
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Town of Newbury Proposed New Fire Station
Michael Plastino Infrastructure Branch Chief
Direct Current (DC) Data Center
Photovoltaic Systems Engineering Session 16 Solar+Storage Systems
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
Safety Assessment Efficiency
(name) (number) Hazard Analysis and Risk Assessment Operations
Exploring Energy Management
Stoughton Public Library
El Sobrante Library Update El Sobrante Municipal Advisory council
Presentation transcript:

Program Proposal to ITGC Data Centre Upgrades Program Proposal to ITGC

Data Centre Upgrades Case for action To address 8 significant findings from an IBM Data Centre Assessment One of the transformers has reached its capacity limit UPS batteries are reaching end of life There is excess AC capacity AC Unit humidifiers have all been disabled, investigate Electric wiring does not meet today’s best practices Perimeter walls of the computer room are not fire rated and hence do not meet code Ceiling tiles do not meet standards, HEPA/ULPA cleaning not part of routine cleaning Physical security gaps must be addressed to protect for safety, unauthorized access and security

Data Centre Upgrades Proposal Alignment to University Goals Consolidate two existing computer rooms into one, saving on electrical, cooling and floor space Address relevant UPS, AC and electrical in consolidated room Where feasible, seal all walls to address fire rating Upgrade ceiling tiles to meet standards Address security gaps through the installation of cameras and other appropriate access controls Alignment to University Goals The Data Centre houses our enterprise systems, all of which are key to supporting all the goals of the University. By upgrading the physical components of our Data Centre we ensure the safety and security of our staff, the protection of our electronic assets and optimized efficiencies in power consumption.

Data Centre Upgrades Plan: Start/End: Summer 2018 to Summer 2019 Joint effort between CCS and Physical Resources Each of the 8 significant findings will be addressed over the span of about 1 year. Start/End: Summer 2018 to Summer 2019 Budget: One-time funding of $1,000,000 is estimated to complete. This is an initial approximation depending on what can or cannot be reused during the physical migration.

Discussion Data Centre Upgrades PMO Observations: Conformance to Building Code Improved electrical and environmental (heating, AC), fire protection and safety measures Mitigates our risk of power outages, fire protection, safety Mitigates our potential liability by meeting code Discussion