n_TOF Target #3 Baseline Design

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
ISIS Second Target Station
Cavity support scheme options Thomas Jones 25/06/15.
Possible irradiation needs from CERN and requirements (a partial and selected view) M. Calviani (EN/STI)
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
N_TOF spallation target upgrade Discussion with d’Huart Industrie 24 th September 2015 M. Calviani, A. Perillo-Marcone, S. Sgobba for the n_TOF target.
N_TOF commissioning INTC-P-249 Spokespersons: J.L.Tain, V.Vlachoudis Contactperson: V.Vlachoudis th Nov 2009 for the n_TOF collaboration.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
Cavity support scheme options Thomas Jones 25/06/15 1.
Issues Raised by the Design of the LHC Beam Dump Entrance Window Ray Veness / CERN With thanks to B.Goddard and A.Presland.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Leslie Jones Target Design Engineer Goran Skoro, Steve Lilley, (Stuart Ansell)– Neutronic Dan Wilcox – Engineering Simulation Dan Coates – CAD - TRaM ISIS.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
CERN’s n_TOF neutron spallation target operating experience and future consolidation plans M. Calviani (CERN) 6 th High Power Targetry Workshop Oxford,
SHiP target and target complex Plans and perspectives M. Calviani, A. Perillo-Marcone (EN/STI) 7 th SHiP Collaboration Meeting 10 th February 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
SPS High Energy LSS5 Thermal contact & cooling aspects
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Design and Optimisation of the ISIS TS1 Upgrade Target Dan Wilcox High Power Targets Group, RAL 6 th High Power Targetry Workshop, 12/04/2016.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
SPS Beam Dump Facility M. Calviani (CERN) on behalf of G. Arduini, K. Cornelis, M. Fraser, L. Gatignon, B. Goddard, R. Jacobsson, M. Lamont, M. Manfredi,
3D Printing Developments
New nTOF target: Design Issues
ISIS TS1 Project: Target Design and Analysis
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
Heating and radiological
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
n_TOF Target HiRadMat Experiment Proposal (1704)
Proposal TDIS-TZM WP14 TDIS jaw validation testing
Impact of TIDVG problem on LSS5 dump design schedule
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
Dump Core Studied Design Solutions
Accelerator and Experiment Interface Session: LS2, LS3
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
2th EuCard Col/Mat WP Meeting
Beam Dump outline work plan (UK perspective)
Phase II Collimators : design status
Incompatibility between MV Switchgear conforming TO the international standards and their use in DNO’s substations M. Arens – Y Tits – Belgium – Session.
TEC assembly and commissioning at Lyon
TRL tables: power conversion and lifetime
APTM and GRID interface requirement PBIP and PBW
n_TOF Target #3 Production Readiness Review
Physics performances of baseline target design (Solution #5)
n_TOF Target #3 Production Readiness Review Introduction and Organization M. Calviani (EN-STI) n_TOF Target #3 Project.
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
Presentation transcript:

n_TOF Target #3 Baseline Design A. Perillo-Marcone EN-STI-TCD

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Introduction Requirement: A new target to be installed by end of 2020. Design criteria Al on external parts to be avoided for RP waste disposal Avoid direct contact between water and lead Add dedicated moderator for EAR2 Unperturbed isolethargic neutron spectrum Minimize in-beam g-background To be able to efficiently manage the beam power on target To last at least up to LS4 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Expected Lifetime of Target #3 Installation of Target #3 LS2 LS3 LS4 LS5 Earliest dismantling (8 years of operation) 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Options Studied Solution 2 Solution 4 Solution 5 (Baseline) Ti64-contained Pb (water cooled) Ti64-contained Pb (water cooled) External Pb mass (N2 cooled) Pb plates/blocks (N2 cooled) details in M.Calviani’s presentation 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Main Features of Proposed Design N2 cooled Pb target (no water contamination issues) Similar physics performance (V.Vlachoudis’ presentation) Priority given to intensity (up to 1·1013), power will be limited to the same as today (1.66·1012 p/s) Robust mechanical design Only one cooling circuit (N2), as opposed to Sol. 4 Prototype tested in HRMT (R.Esposito’s presentation) 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Proposed Design details in M.Timmins’ and V.Maire’s presentations Anti-creep plates Bi-metallic transition 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Core Target Design Sliced Pb core Significant development (R.Esposito and R.Franqueira) details in M.Timmins’ and V.Maire’s presentations 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Mechanical performance Able to withstand expected thermo-mechanical loads details in R.Esposito’s presentation Temperature distribution in Pb Stress (von Mises) distribution in Pb 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Thermal performance Different plates → better cooling performance R.Esposito’s and R.Franqueira’s presentations 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Moderators Upgraded moderator for EAR1 Dedicated moderator for EAR2 Details in M.Timmins’ and V.Maire’s presentations 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Optimised SS Vessel details in M.Timmins’ and V.Maire’s presentations 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Prototypes (proven feasibility) Bimetallic transition Anti-creep structure HiRadMat Test (Pb in N2 atmosphere) Details in M.Timmins’ and R.Esposito’s presentations 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Details in F.Dragoni’s presentation Upgraded Cooling Dedicated N2 station Separate/versatile moderator circuits Details in F.Dragoni’s presentation 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Instrumentation Thermocouples in the target core Full monitoring of N2 and water circuits (F.Dragoni’s presentation) SEM grid (beam monitoring) (O.Aberle’s presentation) Objectives Know actual performance Benchmark numerical models Predict performance under different conditions Determine realistic limits of the target NO INTERLOCKING 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Waste Management and RP Minimisation of Al on the outside Remote-handling compatible, dismantleable assembly (M.Timmins’ presentation) All RP aspects studied in detail and considered carefully (F.Pozzi’s presentation) 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

O.Aberle’s presentation N_TOF Facility O.Aberle’s presentation Target replacement part of n_TOF facility upgrade (EDMS 2134348) 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

A. Perillo-Marcone - n_TOF Target #3 Baseline Design Conclusions The proposed design addresses past issues and new requirements Comparable performance for EAR1 Improved performance for EAR2 Reduction/removal of water contamination issues Improved monitoring of target operation Future dismantling and waste disposal taken into account 29/05/2019 A. Perillo-Marcone - n_TOF Target #3 Baseline Design

Thank you for your attention.