CR-GR-HSE-302 Management of change

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

EMS Checklist (ISO model)
Course Material Overview of Process Safety Compliance with Standards
Transition from Q1- 8th to Q1- 9th edition
Environmental Management System (EMS)
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO HAZID 2.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Risk Assessment – An Essential Standard
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
EHS Management System Elements
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
ISO 14001:2004, Environmental Management System
October Training 8 HR Ref. Content Overhead Utilities Risk Assessments Task Safety Environmental Analysis Health and Safety Plan Components of a HASP Questions?
Software Project Management
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
SacProNet An Overview of Project Management Techniques.
Prime Responsibility for Radiation Safety
Hazards Identification and Risk Assessment
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
ISO Registration Common Areas of Nonconformances.
ISO RECORDS. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Describe.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
OHSAS Occupational health and safety management system.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XI)

Pipeline Safety Management Systems
Software Project Configuration Management
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
CHANGE CONTROL.
Temporary Works Co-ordination
Outcome TFCS-11// February Washington DC
HSE Case: Risk Based Approach.
Life Saving Rules-Do it Right!
CR GR HSE 501 – HSE Requirements for Contractors
OHS Staff Introduction Training
Works and Services Supervisor
Management of Change Report Errors to Management.
EMS Checklist (ISO model)
CR GR HSE 001 On-MAESTRO HSE Expectations
Software Reviews.
DISASTER RECOVERY RUNBOOK
CR-GR-HSE-425 HSE Requirements for work at height
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
CR-GR-HSE-412 Stakeholder and Local Impact Assessment
CR-GR-HSE-405 Industrial hygiene
CR-GR-HSE-100 HSE Reporting
CR-GR-HSE-801 Management of HSE Events and Return on Experience
CR-GR-HSE-419 Safety of excavation works
CR GR HSE 501 – HSE Requirements for Contractors
CR GR HSE 001 On-MAESTRO HSE Expectations
Stakeholder and Local Impact Assessment GROUP HSE RULE (CR-GR-HSE-412)
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
CR-GR-HSE-404 : Road Vehicle Driving Safety
CR-GR-HSE-902 HSE Self-assessments and HSE Audits
Presentation transcript:

CR-GR-HSE-302 Management of change New company rule for M&S

Purpose: HSE requirements for the management of risks related to permanent, temporary or urgent changes made to assets. This rule completed the requirements of Golden Rule 11. Scope of Application: All entities and affiliates operating major risk installations: Low threshold Seveso (whether a regulatory requirement or not); Offshore oil and gas installations; Wells and associated installations and pipelines. New rule for the M&S Branch Contribution: 10% of Process Safety Events result from a failure in MOC as the immediate cause. REFLEX publication date: 22/07/2019. Effective date: 6 months following date of publication.

MOC Process REQUIREMENT STRUCTURE A MOC process in implemented. It is described in a procedure (steps, tasks and responsibilities, approval authority, etc.). A function is designated to coordinate and track all change requests. Change Assessment Initial request, justification, documentation recorded with clear objectives. Impacts are evaluated by relevant disciplines, risk control measures are defined. Change Implementation Training for personnel, including contractors and suppliers. Changes are documented and available when the change is conducted. Pre-Start Up Safety Review for significant changes. Performance review Periodic evaluation of the MOC Process for compliance with requirements.

REQUIREMENT OVERVIEW: MOC Process Requirement 3.1.1: MOC Process MOC A process is set up to manage permanent, temporary or urgent changes that present potential impacts on HSE risk level and concern: Assets (e.g. equipment, process, technologies, materials, safety thresholds/parameters); Operating conditions and operating procedures; Operating personnel and organisation. A function is designated to coordinate and track all change requests of the entity or affiliate.  

REQUIREMENT OVERVIEW: MOC Process Requirement 3.1.2: MOC Procedure Minimum Content The entity describes the MOC process in a procedure that addresses as a minimum: The MOC process coordination; The change approval process steps (planning, coordination, control, etc.); The list of typical changes subject to a MOC process, as well as replacements-in-kind not covered by this process; The tasks and responsibilities of each party involved in the MOC process (e.g. originator, evaluation team members, approval authority, Pre-Start Up Safety Review [PSSR] leader); Training required for the implementation of the process; The MOC process assessment.

REQUIREMENT OVERVIEW: Change Assessment Requirement 3.2.1: Change Initiation The change request, including its justification, is formally recorded and documented so that the objectives of the change: Remain clear during its evaluation and implementation phases; Are communicated to relevant parties; Are traceable after the change has been made Requirement 3.2.2: Change Evaluation Including Risks and Impacts Assessment The evaluation of the change includes an assessment of the HSE risks and potential impacts of the change. This evaluation involves: The function in charge of HSE aspects as well as representatives of relevant disciplines depending on the nature of the change (e.g. inspection, maintenance, operations, engineering); Other parties impacted or influenced by the change; Identification of relevant regulations, standards and applicable REX The impacts and HSE risks are mitigated by the defined risk control measures, as necessary.

REQUIREMENT OVERVIEW: Change Implementation Requirement 3.3.1: Training and Communication As required, training for personnel (including contractors and suppliers) impacted by the change is defined, planned and organised ahead of the change. External stakeholders and potentially affected personnel are notified of the change and of the associated risk management measures. Requirement 3.3.2: Documentation Update All documents impacted by the change are updated and made available as soon as the change is conducted. Requirement 3.3.3: Pre-Start Up Safety Review Before restarting a physically modified installation after a significant change, a Pre-Start Up Safety Review (PSSR) is carried out. All the documents required for the start-up are made available for the PSSR.

REQUIREMENT OVERVIEW: Performance Review Requirement 3.4.1: MOC Process Assessment Performance of MOC process is periodically assessed.

Where to find additional information or documentation? Publication on WAT: http://wat.corp.local/sites/s215/en-US/Pages/actualites/2019/CR-GR-HSE-302-Gestion-du-changement-.aspx HSE toolbox: https://www.toolbox-hse.total.com/en/one-maestro REFLEX: group referential documents : https://reflex.sinequa.corp.local/ M&S Branch referential : http://crescendo4all.rm.corp.local/sites/Ref_MS/Pages/Home.aspx 7