SPS Planning meeting for LS2 #26 Vacuum sectors status

Slides:



Advertisements
Similar presentations
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Advertisements

Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
LS1 status 6/06/2014. BLM re-installation ARC Sector 3-4 – in work, will be done to Sector 4-5 – from 30(23).06 – Sector for Cool.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
SPS DAY Aperture History 01/19/2016 Stéphane Cettour Cavé.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Insertion of 2 MBB with new coated vacuum chambers during technical stop week 35 J. Bauche for the SPSU study group, 24 June 2010.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Magnet activities in SPS during EYETS
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SPS-FIRE The SPS Fire Safety Project Planning Status
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
BE-ICS activities for LIU Project
SPS LS1 Planning meeting (N019) 04/09/13
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
TE-MSC activities in SPS during LS2
BA6 – crab cavity activities in EYETS
Injector De-cabling Project
K. Foraz on behalf of OSS members
SPS - EYETS 2016/17 Vacuum systems planning
on behalf of the RF group
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
EN 4946 – Refurbishment of Electrical Substations
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-HE L2 – PS – PSB – TT2 works during YETS
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
BLM planning 03/03/2014.
LS1 status 17/03/2014.
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
SPS Planning meeting for LS2 #19 Vacuum sectors & Magnet campaign situation Antonio Grande EN-ACE 06-Mar-2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS Planning meeting for LS2 #18 Vacuum sectors situation
SPS Planning meeting for LS2 #16 Vacuum sectors situation
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Two-beam Test-stand Design and Construction Status
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
LIU-SPS review for BI (no BWS)
SPS Planning meeting for LS2 #25 Vacuum sectors status
SAME 15 existing quadrupoles (QFS, QDS, QFL)
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
WP1: Status and Plans Francisco Sanchez Galan (EN-EA-PE)
SPS Injection BIS - Draft requirements
Presentation transcript:

SPS Planning meeting for LS2 #26 Vacuum sectors status Antonio Grande EN-ACE 26-June-2019

Documents Schematic view file:///G:/Departments/EN/Groups/ACE/OSS/Estrella/Schematic%20view/SPS_Schematic_View/SVG_SPS.svg 11/15/2019 Antonio Grande EN-ACE

Open point BA1: BCTDC BCTDC_11601 removal to the end of September This is to be carried out at the same time as the ‘enlarged Quadrupole relocation’ once the ECR has been released Verbally agreed with BE-BI BA6: Conditioning Septas 3 weeks from July Can Sprinkler tests start their testing phase in week 30 in the LSS6-? 11/15/2019

Open point QD MBB QD SPS: QD RF shielding After the inspection in 2+ to 4- 4- QD 40310 QD 40510 QD 41510 3+  QD 32110 QD 32910 QD 33110 3- QD 30710 QD 31310 QD 31510 2+ QD 23110 QD 31110 S. Cettour-Cave asked for modifying the RF shielding near the QDs All around the ring There will be around 30 positions to be done after the visual inspection It will be done before the Qjacks consolidation team No impact in other campaigns Depending on the availability of transport Position 405 – C. Pasquino QD MBB Inspection QD Position 415 – C. Pasquino 11/15/2019 Antonio Grande EN-ACE

Open point Qjacks’ campaign 5+ Due to Possible delay in Qjack campaign Partial block of passage of LSS6- from week 27 to 30 aC coating in week 31, so preparation works in week 30, included girder transport Need of a dedicated meeting to avoid any impact in aC coating QD RF shielding  very difficult to do 5+ positions 11/15/2019 Antonio Grande EN-ACE

Follow up Qjacks’ campaign No official update but still in point 3  Delay? Impact? 11/15/2019 Antonio Grande EN-ACE

Follow up TT20: BSG 210023 Done in week 26 11/15/2019 M. Hamani M. Hamani 11/15/2019 Antonio Grande EN-ACE

Vacuum sectors dashboard - Opening Opened/Scheduled Next 2 weeks 52/42 1 Week 26 11/15/2019 Antonio Grande EN-ACE

Vacuum sectors dashboard - Closing Closed/Scheduled Next 2 weeks 12/16 10 Week 26 11/15/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – LSS1 SPS 24 25 26 27 Week # Dismantling of the dump 11/15/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – LSS2SPS 24 25 26 27 Week # Dismantling of ZS Should be displaced to end of LS2? ZS transport from 3rd to 5th July 11/15/2019 Antonio Grande EN-ACE

Forecast for the next 3 weeks – LSS2SPS 24 25 26 27 Week # Conditioning of the septas ! ~80cm of passage restricted 11/15/2019 Antonio Grande EN-ACE

Passage restriction status – w 26 BA2- & 3+ Magnet works BA5 – Arc5- Qjacks BA6 – LSS6- Firedoor works BA5+&6- Restriction due to door works Qjacks (!) RP restriction LSS1 LSS2 LSS5 LSS4 LSS6 4- 4+ LSS3 1- 1+ 2- 3- 2+ 3+ 6- 6+ 5+ 5- LSS1 LSS1 LSS6- Restricted Possible punctual restrictions in passage No restriction foreseen Passage partially restricted With current Qjack campaign 11/15/2019 Antonio Grande EN-ACE

Passage restriction status – w 27 BA 1- Qjack campaign BA2 – LSS2- Out by BA3 Septas BA4+ Magnet works BA5 – Dump Doors BA5+ Qjack BA6- Conditioning, pumping BA6 – LSS6+ RP restriction LSS2- LSS1 LSS2 LSS5 LSS4 LSS6 4- 4+ LSS3 1- 1+ 2- 3- 2+ 3+ 6- 6+ 5+ 5- LSS1 LSS1 LSS6+ LSS6- Restricted Possible punctual restrictions in passage No restriction foreseen Passage partially restricted With current Qjack campaign 11/15/2019 Antonio Grande EN-ACE

Passage restriction status – w 28 BA1+ & 2- Qjack campaign BA6- Conditioning, pumping BA6 – LSS6+ Doors RP restriction LSS1 LSS2 LSS5 LSS4 LSS6 4- 4+ LSS3 1- 1+ 2- 3- 2+ 3+ 6- 6+ 5+ 5- LSS1 LSS1 LSS6+ LSS6- Restricted Possible punctual restrictions in passage No restriction foreseen Passage partially restricted With current Qjack campaign 11/15/2019 Antonio Grande EN-ACE

All comments are more than welcome but please let me know by mail Thank you