8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC progress Report LHCC Wednesday 23 rd March 2011.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
LHC Wire Scanner Calibration
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
Tuesday TOTEM and transverse loss map (1) OK
Saturday 1.3 e32 Overnight Morning
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Monday – recovery from MKI flashover
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Presentation transcript:

Monday 152 bunch operation summary 4 fills with stable beams (~ 16h in total, = ~ 208 hours) Enough for next step Injection tests and interlocked BPM qualification for 200b Scheme 150ns_200b_186_8_186_8+8bpi17inj OK for next step Parasitic tune measurement studies Test ramp Stepped through the squeeze to correct coupling Loss maps made on the end Physics with 200 bunches per beam Target bunch intensity 1011 and emittance between 2 and 3 µm 11/13/2019 LHC status

Filling 200 bunches per beam 11/13/2019 LHC status

200 bunches, < N > 1.1e13 11/13/2019 LHC status

200 bunches per beam Positions at P6 interlock BPMs - no signs of big changes Beam 1 Beam 2 11/13/2019 LHC status

200 bunches per beam Dumped 200b in B1 when reached 1.32 mm on the BPMSB.B4R6.B1 (about 0.5 mm away from the measured position, on the safe side). Test passed. B2 lost as well due to BLMs in P6 Beam 1 Beam 2 11/13/2019 LHC status

Physics fill 1393 Intensities injected Emittances before ramp Around 2 1013 per beam 0.85 to 1.05 1011 per bunch 2nd 8 of an 8 + 8 injection systematically lower Emittances before ramp B2H 2.2 B2V 2.3 could not do B1 due to intensity interlock (B1 BCT > 2 1013) Very little vacuum activity (on the usual gauges) Ramp B1-H drops out for some minutes despite the reduced intensity B2 is fine all along the ramp though while having slightly higher bunch intensities (1.1e11 p/b) ... strange... to be further investigated 11/13/2019 LHC status

Fill 1393 – bunch intensities 11/13/2019 LHC status

Fill 1393 – vacuum 11/13/2019 LHC status

Fill 1393 – vacuum scale zoomed 11/13/2019 LHC status

Corresponding emittance around 2.6 µm Start of fill 1393 Corresponding emittance around 2.6 µm 11/13/2019 LHC status

Fill 1393 From 20.00 Stable beams 2 1013 per beam 11.2 MJ per beam Initial luminosities 0.68 1032 Integrated luminosities after 12 hours > 2 pb-1 From 22.00 Length scale calibration IP1 From 06.00 TOTEM pots in End of fill 09.00 11/13/2019 LHC status

Outstanding requests Dedicated fill to complete VdM scans Around 1 shift needed CMS need access ? Intensity effects & vacuum - SVC Quench test (Wedn. – TBC) – Coord.: Joerg Wenninger Transverse damper – 2 h without beam – no access W. Hofle MKQA & AC-dipole – will need another access – E. Carlier Voltage rampdown@injection Test of new beam presence flag system – M. Gasior CO security intervention to be scheduled - A.Bland RCBH15.L6B1 to be exchanged Mods to Q meter electronics (RS et al, from Thursday) BI – Coord. J. J. Gras (see next) 11/13/2019 LHC status

BI MD - c/o JJG – One Shift PLL studies Measure the sensitivity of Marek’s new beam presence detection system Check the linearity of the fast BCT’s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT For all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. This would be really difficult to fit in a 4 hour slot. 8 would be perfect but we could try with 6. LHC status

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 11/13/2019 LHC status

Tuesday BI shift (part 1) Limited access early afternoon CMS RCBH15.L6B1 to be exchanged Physics with 200 bunches per beam 11/13/2019 LHC status