Introduction to IMPROVE and Regional Haze Data

Slides:



Advertisements
Similar presentations
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
Advertisements

IMPROVE Budget Summary Tony Prenni John Vimont, Bret Schichtel, Scott Copeland October 16, IMPROVE Steering Committee Meeting 10/16/2014.
Predicting TOR OC and EC from FT-IR Spectra of IMPROVE samples Ann M. Dillner Assoc. Research Scientist University of California, Davis Satoshi Takahama.
Status, Topics, and Questions regarding the Federal Land Manager Environmental Database (FED) March 20, 2011.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Regional Haze Rule Guidance: Tracking Progress & Natural Levels Overview of the concepts currently envisioned by EPA working groups by Marc Pitchford;
IMPROVE Network Assessment Plans. IMPROVE Network Assessment Motivation: –EPA’s air quality monitoring budget is not growing, but their requirements are.
IMPROVE Website Status and Great Things to Come Presented to the IMPROVE Steering Committee Mammoth Cave, KY September 2006 B.A. Schichtel.
Substituting Sulfate for Sulfur Impact on the RHR metrics and control strategies Presented at the 2006 IMPROVE Steering Committee Meeting by B.A. Schichtel.
1 CONTINUITY OF IMPROVE CARBON DATA THROUGH THE 1 JANUARY 2005 INTRODUCTION OF NEW ANALYTICAL INSTRUMENTATION* WHW, 10/2/07 *Chow et al. (2007) JA&WMA.
Dissemination of Haze Data, Data Products and Information Bret Schichtel, Rodger Ames, Shawn McClure and Doug Fox.
Attribution of Haze Report Status Fire Emissions Joint Forum Meeting December 8, 2004 Tom Moore Marc Pitchford.
AQS Development and Enhancement Plans AQS Development and Enhancement Plans AQS CONFERENCE Jake Summers June 9, 2010.
PM2.5 Model Performance Evaluation- Purpose and Goals PM Model Evaluation Workshop February 10, 2004 Chapel Hill, NC Brian Timin EPA/OAQPS.
Measuring OM/OC on individual IMPROVE Teflon filters using FT-IR analysis Ann M. Dillner, Travis C. Ruthenburg Lake Tahoe IMPROVE Steering Committee Meeting,
Update on IMPROVE Light Extinction Equation and Natural Conditions Estimates Tom Moore, WRAP Technical Coordinator May 23, 2006.
Regional Haze Rule Reasonable Progress Goals I.Overview II.Complications III.Simplifying Approaches Prepared by Marc Pitchford for the WRAP Reasonable.
Jenny Hand CIRA Acadia National Park, ME Interagency Monitoring of Protected Visual Environments (IMPROVE)
An Integrated Systems Solution to Air Quality Data and Decision Support on the Web GEO Architecture Implementation Pilot – Phase 2 (AIP-2) Kickoff Workshop.
WESTAR National Air Monitoring Steering Committee Update Spring Business Meeting 2010 Denver, CO Bruce Louks, Idaho DEQ.
AoH Conference Call October 8, 2004 Air Resource Specialists, Inc.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
AoH Phase 2 and TSS Project Update WRAP Technical Analysis Forum Las Vegas, NV February 6, 2007.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
IMPROVE Algorithm for Estimating Light Extinction Draft Recommendations to the IMPROVE Steering Committee.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Air Quality Relative Values Data Summaries Graphical summaries of the current air quality status and trends in National Parks and other federal lands.
Implementation Workgroup Meeting December 6, 2006 Attribution of Haze Workgroup’s Monitoring Metrics Document Status: 1)2018 Visibility Projections – Alternative.
Attribution of Haze Report Update and Web Site Tutorial Implementation Work Group Meeting March 8, 2005 Joe Adlhoch Air Resource Specialists, Inc.
Air Quality and Seney National Wildlife Refuge Jill Webster June 14, 2007.
AoH Work Group Weight of Evidence Framework WRAP Meeting – Tucson, AZ January 10/11, 2006 Joe Adlhoch - Air Resource Specialists, Inc.
Intermountain West Data Warehouse - Western Air Quality Study
Shawn McClure, Rodger Ames and Doug Fox - CIRA
IMPROVE/STN Comparison & Implications for Visibility and PM2.5
Facility Manager IPM PLAN and Policy
Current and Future State of the IMPROVE Website
Monitoring/Data Analysis Discussion Group June 10, 2005
Dissemination of Haze Data, Data Products and Information
Advancements in Availability and Reliability computation Introduction and current status of the Comp Reports mini project C. Kanellopoulos GRNET.
Visibility Coordinator Regional Haze
Project Management and Accountability Practices
The School Point of View
WRAP Regional Haze Planning Workgroup (RHPWG)
A Conceptual Approach to Address Anthropogenic / Non-Anthropogenic Emission Sources to Help Develop a More Accurate Regional Haze Program Glidepath Control.
BART Overview Lee Alter Western Governors’ Association
Monthly Update on WRAP Workplan
WAQS Monitoring Network Assessment
AoH Phase 2 Update AoH Meeting – San Diego, CA January 25, 2006
Facility Manager IPM PLAN and Policy
Evaluating Revised Tracking Metric for Regional Haze Planning
Tom Moore (WESTAR and WRAP) and Pat Brewer (NPS ARD)
Adjusting the Regional Haze Glide path using Monitoring and Modeling Data Trends Natural Conditions International Anthropogenic Contributions.
Joe Adlhoch - Air Resource Specialists, Inc.
Western Regional Haze Planning and
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
IMPROVE Data Processing
A Review of Time Integrated PM2.5 Monitoring Data in the United States
WRAP Regional Modeling Center (RMC)
Tribal Data WG Fire and Smoke WG Oil and Gas WG
TSS Data Documentation (2)
Sulfate Contributions to Regional Haze in the WRAP Region
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Marc Pitchford NOAA/EPA
EPA’s Roadmap for the Second Planning Period
Tribal Data WG Fire and Smoke WG Oil and Gas WG
The UC Davis Semi-Annual Report on Quality Assurance IMPROVE Steering Committee Meeting October 16, 2018 | Fort Collins, Colorado Xiaolu Zhang*, Katrine.
WSAQDW planning documents
Air Quality Committee Meeting July 11, 2012 Donnie Redmond
Presentation transcript:

Introduction to IMPROVE and Regional Haze Data WRAP Regional Haze Planning Work Group call - June 29 , 2017 Scott Copeland, CIRA/USDA Forest Service IMPROVE Steering Committee Chair scott.copeland@colostate.edu

Track progress at 156(155) Federal Class I Areas 156 national parks and wilderness areas where visibility was deemed an important attribute 2

What is IMPROVE? Interagency Monitoring of PROtected Visual Environments It is a monitoring network and a group which makes recommendations about the network. The network began in 1988 with 20 sites Now ~163 sites representing USDA FS, FWS, NPS, State, Tribal, International agencies

Who is the IMPROVE Steering Committee? Primary funding source Contracting agency Associate (non-voting) Members Arizona DEQ, Environment Canada, and Republic of Korea Ministry of Environment

What does the Steering Committee do? Meet annually to discuss the state of the network Identify issues related to funding, analytical techniques, data handling, site operations, visibility science. Make consensus recommendations about solutions. Provides feedback to agencies regarding issues and solutions. -> You can interact with the SC formally by contacting your SC Representative or informally by contacting any member of the committee.

What does NPS do in managing the sampling network contractor and delivery of data & analysis results? Listens to Steering Committee recommendations Directs subcontractors to perform work: UC Davis is the central lab DRI provides TOR/Carbon analysis RTI provides ion analysis Supports CIRA activities at CSU: Cooperative agreement enables: Applied visibility research Provides data, methodology, and program tracking access via IMPROVE, FED, WRAP TSS and other websites Publishes raw data, visibility metrics, periodic IMPROVE reports, and other visibility documents on its websites.

IMPROVE Aerosol Sampler(s) & Filter Analysis Module A, PM2.5 Teflon PM2.5 Mass (gravimetric, not FRM/FEM) FTIR Elements (XRF, PIXE, PESA) Fabs (HIPS, BITS?) Module B, PM2.5 Nylon SO4=, NO3-, Cl- Module C PM2.5 Quartz OC, EC (TOR) (O1, O2, O3, O4, OP, E1, E2, E3) Module D, PM10 Teflon PM10 mass (gravimetric)

IMPROVE Site Selection for Regional Haze tracking http://vista.cira.colostate.edu/improve/Publications/SOPs/UCDavis_SOPs/select22.pdf

IMPROVE Sampler Siting

IMPROVE Sampler Siting, cont.

Generate SS Rayleigh, f(RH) values for each new site. 12 monthly INAPM25-UCD-YYYYMM.txt files* New Sites? Yes No Natural Conditions 2 work based on pre-patched data if 3 in 5 year criteria met from 2000-2004. Import UCD files, reassign site codes, change units, combine with f(RH) & SS Rayleigh values. (NEW: Perform Level 2 QA at CIRA. Add flags if necessary.) Previous years’ data informs patching Substituted values built from patched data. Substituted data used for NC2 if 3 in 5 year criteria not met from 2000-2004. Run RHR2 patching algorithm, then completeness checks. Species specific flags added for patching Calculate RHR2 & RHR3 metrics. Generate Pie Maps and rolling 5-year averages. Post to FED and Google Drive*.

(current) IMPROVE Light Extinction Reconstruction “second” equation (used in Round 1 RHR planning)

Main IMPROVE data websites: http://views.cira.colostate.edu/fed/ Data queries (for experienced analysts, lots of choices & details) Canned Graphics (draft impairment metrics) “RHR2” = Haziest 20% day RHR metrics. “RHR3” = my shorthand for “impairment metric” approach. http://vista.cira.colostate.edu/Improve/ “rolled up” results RHR2 annual metrics Entire IMPROVE data set – RHR2, daily Winhaze Key documents: Steering Committee meeting notes and presentations QAPP Data Advisories Not direct sources of Regional Haze planning data

RHR Baseline

RHR Baseline

Closing comments: 2016 IMPROVE data will be delayed, likely until roughly November. -Delay should be shorter for 2017 data. EPA’s final impairment guidance document release date is uncertain. I am working on adding substituted data to the Impairment Approach dataset, and then reproducing the 2064 endpoint values from the guidance. Feel free to contact me with questions and comments.

Questions?