The Nuts & Bolts of Servicing a 221(d)(4) Construction Loan

Slides:



Advertisements
Similar presentations
Housing Notice H Use of New Regulation Section 8 Housing Assistance Payments (HAP) Contracts Residual Receipts to Offset Project-Based Section.
Advertisements

Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Courtesy of: The Journey to Your Own Home Made simple… By: Multicultural Marketing Division.
Real Estate Law An Introduction to the Closing Real Estate Law An Introduction to the Closing.
©2011 Cengage Learning Chapter 11 Processing: DOCS, FUNDING, AND CLOSING By Dr. D. Grogan M.C. “Buzz” Chambers.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Close Out CTC-470.
Conditions of the Contract for Construction
David M. Harrison, Ph.D. Real Estate Finance Texas Tech University Common Covenants and Clauses Promise to Pay - Specifies principal, interest, penalties,
Chapter 15 Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons Auditing Assets, Liabilities, and Equity Related to the Financing Cycle.
AGENDA Program Features Eligible/Ineligible Improvements
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
FHA 203K IS ONE LOAN FOR A PURCHASE OR REFINANCE, THAT ALSO FINANCES HOME IMPROVEMENTS. WHILE THE FHA 203K HAS MANY ADVANTAGES, ITS PRIMARY BENEFIT IS.
Construction Contracts What You Need to Know March 19, 2015.
Financial Statement Basics Roy Williams – FHA Deputy Chief Underwriter.
 If the Servicer evaluates the Borrower and determines that the Borrower is eligible for a HAFA Short Sale  The Servicer must comply with the following.
IDENTIFYING THE STRENGTHS & WEAKNESSES OF YOUR CONSTUCTION PROJECT McCune Construction Services Group, L.C.C.
Labor Standards Pam Truitt  September 10, Key Regulations & Statutes  Davis-Bacon Act  Copeland Act (Anti-kickback Act)  Contract Work Hours.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Departmental Deposit Procedures Handling of University Funds Tarleton State University Created October 2007.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
Loan Sizing/Eligible Debt Handbook Chapter 3. Topics Covered  Loan sizing benchmarks per Section 232 Program  Eligible mortgage costs included in 232.
Closings and Cost Certifications Handbook Chapters 9 & 11 Spencer Ash/Amy Schwarz 1.
Emilio Pucillo Director, Division of Engineering Services, HHS Peyton Kuhlthau Acting Director, Division of Facilities & Loans, HHS.
A1 – Percentage of Applicable LTV  This figure comes from the applicable LTV charts Maximum Purchase LTV Factors Owner Occupant95% - 1 unit > 660 Score.
A1 - Contract Sales Price or Existing Debt  Purchase: Contract sales price of the property  Refinance: The amount of the existing debt  HUD REO:
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
YOUR KEY TO SUCCESS AS A 203K CONTRACTOR k Contractor 101 Workshop 80% OF SUCCESS …
Chapter 18 Escrow Procedures. The last step in the loan process is CLOSING, when the loan proceeds are distributed and a deed to the property is transferred.
Buying and Selling Real Property CHAPTER THIRTY-ONE.
Simile Billing Process. On the 20 th of the month the Project Administrators monthly billing reminders to all subcontractors that need to be paid.
Slide 13-2 CHAPTER 13 Statement of Cash Flows Learning objective 1: Explain the need for the statement of cash flows and identify the three types of.
CONSTRUCTION ADMINISTRATION Quality Control, Responsibility & Liability TQC Presentation 01/17/08.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Renting vs. Buying Housing
Metra Construction Contractor Prevailing Wage Workshop
Getting Your HUD Deal Closed (On Time!)
Debt As of April 2013 Average Credit Card Debt: $15,000+
Construction Home Loan Fact Sheet
CLOSING AND DELIVERING SONYMA LOANS
Administration of a FIDIC Contract - Project Control
U.S. Department of Housing & Urban Development
Administration of a FIDIC Contract - Financial Management
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Grant Orientation Session
Financing Land Development Projects
Overview of Stakeholders and Key Roles
State Aid Construction
TOPIC-7- PROJECT CASH FLOW
Punch list / Close Out - Project Completion
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Completing the State Aid Payment Request
Home Buying Process Presented By:
TOPIC-7- PROJECT CASH FLOW
ARCH 435 PROJECT MANAGEMENT
FHA 203h Disaster Loan Presented by: Kelly M. Smith with Guest VP of Operations Paul Isola Account Executive NORCAL
Grant Orientation Session
2. The Short-Sale Package
Construction Contract Administration
I WANT TO BE A GENERAL CONTRACTOR ON A HUD DEAL
State Aid Construction
Overnight/Out-of-town Travel Training
AUTHORS: JUAN GARCIA RYAN CHERRINGTON LEE McMELLON.
Right of Way Certification
Presentation transcript:

The Nuts & Bolts of Servicing a 221(d)(4) Construction Loan Lena Nazarian, Love Funding David Jasso, Leetex Group Reference: HUD MAP GUIDE, CHAPTER 12 & APPENDIX 12 – CONSTRUCTION PERIOD

Overview Initial Closing/Pre-construction Conference Construction Starts Draws & Inspections PTO’s (Permission to Occupy) 100% TRIP Report (Final Completion) Submission of Cost Certification(s) Issuance of MIM (Maximum Insurable Mortgage) Submission of Final Closing Package Final Endorsement Closing

Key Players Borrower/Owner (Mortgagor) General Contractor Supervisory Architect HUD Inspector Lender (Mortgagee) HUD

Pre-Construction Conference The pre-construction conference (“pre-con”) is typically held on the same day as initial closing; if not possible, will occur shortly before or after initial closing. Lender has ensured that four (4) “master” sets of drawings and specifications have been signed by all authorized agents; one is contractor’s “job set” and stored on site to be used to build the project. The pre-con is conducted by the HUD Inspector, HUD Construction Analyst or other HUD designee. Required Attendees: Owner, Contractor, Supervisory Architect, Lender, HUD Representative(s), Bonding Agent, if applicable. Purpose: To explain general contract administration, role of attendees during the construction period, and procedures for all construction related matters (including Davis-Bacon labor standards compliance & reporting*) through final completion. *During the pre-con, HUD will indicate who on the Office of Davis-Bacon and Labor Standards staff will review the project for labor standards compliance. Most HUD regions require a follow-up meeting on site (or a conference call) with the Contractor and subcontractors to inform all parties of wage reporting requirements in the Elation system, and about worker interviews that will be conducted during site inspections. Davis-Bacon & Labor Standards clearance is a condition of final endorsement closing.

Pre-Construction Conference: Sample Topics Covered

Construction Draw Processing & Monitoring Contractor, Architect, Owner and HUD Inspector schedule a monthly draw meeting at the site to review construction payment application. Contractor prepares Contractor’s Requisition, form HUD-92448, monthly for work in place, along with updated construction progress schedule and reviews with Architect and HUD Inspector. Contractor, Architect and HUD Inspector approve and execute HUD-92448 Contractor provides copy of executed HUD-92448 to Owner for preparation of Owner’s Application for Advance of Mortgage Proceeds, form HUD-92403. Owner submits executed HUD-92403, executed HUD-92448 and all supporting documentation to Lender for review and processing. Lender reviews/approves monthly draw submission, orders title date down, ensures no liens then funds draw and provides copy of approved draw package to HUD. After each site visit, HUD Inspector issues TRIP (inspection) report to HUD. HUD reviews acceptability of TRIP report and provides copy to Lender. Lender may approve all interim draws after initial endorsement; any contractor’s requisition that includes retainage reduction requires HUD approval. HUD approves final draw as part of final endorsement closing.

Form HUD-92403 Application for Insurance of Advance of Mortgage Proceeds When allowed per the construction contract, explain process and requirements for HUD approval.

Form HUD-92448 Contractor’s Requisition Project Mortgages When allowed per the construction contract, explain process and requirements for HUD approval.

Change Orders & Classifications All changes to construction drawings & specifications and requests for time extensions must be submitted on form HUD-92437, Request for Construction Changes on Project Mortgages, and include supporting documentation, along with a letter from the Architect classifying the change as one of the following: Necessary Latent (hidden) conditions; changes in building codes, ordinances, etc. after initial closing; architect’s/engineer’s omissions; damage to completed construction. Betterment Economically justified by increasing net income, reducing long-term maintenance and/or operating expenses or otherwise enhances the mortgage security. Equivalent Substitution, if specified item is no longer available or it reduces contract price; must provide equal or better utility and performance. Time Extension Delay is beyond Contractor’s control and documented or associated with an approved change order; accompanied by Surety’s written consent, if applicable. The HUD-92437 must be initialed by the HUD Inspector and signed by the Borrower, Contractor, Architect & Lender then submitted by the Lender to HUD for approval. Define each and discuss supporting requirements, discuss when a change order is or isn’t required

Change Order Funding & Contingency Lender ensures that there is adequate funding for all proposed change orders. Payment for approved and completed change order work is billed separately using form HUD- 92464M, Request for Approval of Advance of Escrow Funds. HUD-92464M includes certification by Architect and HUD Inspector that all work covered by the change order has been acceptably completed in accordance with contract documents. Substantial Rehabilitation Projects: Contingency funds are included in the mortgage and used to fund approved “necessary” change orders. After substantial rehab is complete, any remaining contingency may be used for further upgrades/betterments, an initial deposit to the replacement reserve or to reduce the mortgage principal balance. New Construction Projects: Contingency reserve (2% of the loan amount) is established within the Working Capital Escrow funded by the Borrower and used to pay for approved “necessary” change orders and construction cost overruns. Any unused contingency is returned to the Borrower at final endorsement closing. Approved “betterment” change orders are not funded from above described contingencies during construction; Lender establishes a separate escrow funded by other sources. Discuss sources of contingency during construction; explain typically limited to use for necessity & time extension costs.

Retainage Reduction The construction contract provides for a standard 10% holdback (retainage). If retainage reduction during the construction period has been agreed upon by Owner and Contractor, it is established by a rider to the contract which describes how retainage is reduced according to the guidance below: Contractor has no identity-of-interest with the Owner that is greater than a 5% equity interest in the ownership entity. Prior written consent from Surety (when bond involved) must be obtained and attached to the request for reduction. Contractor’s performance is acceptable with regard to quality and progress of the work, changes to the work and compliance with contract documents (including satisfaction of all Davis-Bacon payroll requirements). Assuming the above conditions are met and subject to Lender and HUD approval: 10% retainage held until 50% completion, then reduced to 5% 5% retainage held until 75% completion, then reduced to 2.5% 2.5% retainage held until Final Endorsement closing Explain what needs to be included with a PTO and who must approve

HUD Permission to Occupy (PTO) Permission to Occupy (PTO) form HUD-92485 is executed by HUD before Borrower permits occupancy of any units. Property is inspected and PTO is signed by Contractor, Borrower, Architect, HUD Inspector, Lender then submitted by Lender to HUD for approval. Units must have safe means of ingress and egress. Include Certificate of Occupancy (“C of O”) or equivalent permit from the governing municipal authority for review. Include accord or certificate of property and liability insurance from the Borrower’s insurance company for review. PTO may be submitted and approved with a temporary C of O; however, final certificates must be issued for final endorsement closing. Explain what needs to be included with a PTO and who must approve

Final Inspection and 100% Completion HUD inspector issues HUD-95379 TRIP Report showing 100% completion; lists any items of delayed completion and estimated cost to complete. Architect determines that all punch list items have been completed (except any items of delayed completion, beyond contractor’s control). Required Documents Final change orders (no change orders processed after final completion) Permission to occupy (PTO) forms, if not previously submitted HUD-92448 Contractor’s Requisition for 100% completion Final ALTA Survey & Surveyor’s Report 100% As-Built Plans (red-lined incorporating all changes, as approved by Architect; must be submitted to HUD, electronically preferred, including all attachments) Final payment requests for completed change order work or offsite work Copy of transmittals of all contract close-out items to Owner (per specs) David Jasso to discuss how he prepares development team for final & what is reviewed during a final inspection in order to issue 100% Completion; explain final retainage released at Final Endorsement Closing.

Cost Certification(s) and Issuance of Maximum Insurable Mortgage (MIM) The purpose of the cost certification (form HUD-92330) is to certify Borrower’s actual costs, including Contractor’s cost, and establish the maximum insurable mortgage for final endorsement. The substantial completion date is the effective date for cost certification; however, Borrower has the option to select a cut-off date up to 60 days beyond substantial completion to include additional incurred soft costs. Submission date for Borrower is within 30 to 45 days after selected cut-off date. When Borrower is required to cost certify, if construction contract is Cost Plus, then Contractor must also certify (form HUD-92330-A). Lender submits and HUD reviews cost certification(s); HUD issues Maximum Insurable Mortgage (MIM), form HUD-92580, establishing final loan amount. Project moves forward to Final Endorsement closing. David Jasso to discuss how he prepares development team for final & what is reviewed during a final inspection in order to issue 100% Completion; explain final retainage released at Final Endorsement Closing. Reference: HUD MAP GUIDE, CHAPTER 13 – COST CERTIFICATION